DOI QR코드

DOI QR Code

A Study of Optimum Capacity of Battery Energy Storage System Linked PV

태양광 연계형 배터리 에너지 저장장치의 최적 용량 산정

  • Received : 2017.08.08
  • Accepted : 2017.11.21
  • Published : 2018.01.01

Abstract

In September 2016, the government decided to apply a REC 5.0 weighting to solar-battery ESS to increase the supply of renewable energy. In this paper, we calculated the optimal capacity of battery ESS which maximizes the revenue when solar is linked with battery ESS. In the case study, the optimal capacity was calculated by applying the conservative REC price, and we studied sensitivity analysis about battery price and real-time REC price.

Keywords

References

  1. Ministry of trade industry and energy, "Plan to implement development strategy of New Energy Industry and critical technology to response the climate change", 8th Economic Ministerial Meeting, 2015.
  2. Korea Energy Agency, "The Regulation on the Issuance of Renewable Energy Certificate and the Operation of the Certificate Market", Renewable energy center, Vol. 6, 2017.
  3. Ministry of trade industry and energy, "Briefing session for New Energy Industry and Renewable Energy Policy", 2017.
  4. Jong-Bae park, et al. "An Economic Assessment of Large-scale Battery Energy Storage Systems in the Energy-Shift Applcation to Korea Power System", KIEE, Vol. 64, No. 3, pp. 384-392, 2015.
  5. Gerald J. Thuesen & W. J Frbrycky, "Engineering Economy", Prentice Hall; 9 edition, June 9, 2000.
  6. D. Rastler, "Electricity Energy Storage Technology Options: A White Paper Primer on Applications, Costs, and Benefits", EPRI, 2011.
  7. Zhou, C., Qian, K., Allan, M., & Zhou, W. "Modeling of the cost of EV battery wear due to V2G application in power systems." IEEE Transactions on Energy Conversion, Vol. 26, No. 4, pp. 1041-1050, 2011. https://doi.org/10.1109/TEC.2011.2159977
  8. Grothoff, Johannes Michael. "Battery storage for renewables: market status and technology outlook." International Renewable Energy Agency (IRENA), Abu Dhabi, 2015.
  9. Jeng-Jin Jang, "Preliminary feasibility study reorganization plan" Ministry of Strategy and Finance, 2017