Abstract
Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.
2017년 2월부터 개정된 건축법에 의해 소규모 건축 프로젝트에 현장관리인을 투입해야 한다. 본 연구에서는 이들의 업무능률 향상을 위하여 이론 고찰을 통해 문제점을 도출하고, 현장관리인의 보다 나은 업무 진행을 돕고자 현장 감리업무의 개선방안을 제시하고자 한다. 이를 위하여 기존의 체크리스트를 대상으로 전문가 설문조사를 수행하여, 소규모 비상주감리 현장관리를 위한 체크리스트를 작성하고자 하였다. 또한 작성된 체크리스트를 기반으로 하는 현장관리 시스템의 활용 방안을 제안하고자 하였다. 이러한 BIM기반의 현장관리 시스템을 활용하면 현장에서 발생하는 다양한 이슈에 대해 실시간으로 모니터링 가능하여 프로젝트를 효과적으로 운영할 수 있을 것으로 기대된다.