참고문헌
- Breiman, L. Friedman, J.H. Olshen, R.A. & Stone, C.J., 1984. Classification and regression trees. Wadsworth and Books: California.
- Cho, K.K. Chung, K.H. Park, C. Park, J.C. & Kim, H. S., 2001. A spatial scheduling system for block painting process in shipbuilding. The International Academy for Production Engineering, CIRP Annals-Manufacturing Technology, 50(1), pp.339-342. https://doi.org/10.1016/S0007-8506(07)62135-0
- Hartigan, J.A., 1975. Clustering algorithms. John Wiley & Sons: New York.
- Jang, B.T., 2007. Next-generation machine learning technology. Communications of the Korean Institute of Information Scientists and Engineers, 25(3), pp.96-107.
- Jung, Y.S., 2007. Block transportation management system. Master's Thesis, Ulsan National University.
- Kim, M.S. Cha, J.H. & Cho, D.Y., 2013. Determination of arrangement and take-out path in ship block stockyard considering available space and obstructive block. Proceedings of the Society of CAD/CAM Conference, Republic of Korea, 30 January - 1 February 2013.
- Kim, J.O. Paek, T.H. Ha, S.J. Lee, S.H. Jung, M.Y. Min, S.K. Kim. D.S. & Hwang, S.Y., 2009. Development of real time location measuring and logistics system for assembled block in shipbuiling. 2009 Conference on Korean Operations Research And Management Society, Pusan, Republic of Korea, 22-23 May 2009.
- Koh, S.G., 1996. A production schedule with genetic algorithm in block assembly shop. Korean Management Science Review, 13(1), pp.1-12.
- Lee, J.M., 2007. An integrated process and measurement framework for planning production of large shipyards. Ph.D. Thesis, Seoul National University.
- Lee, K.H. & Yeun, Y.S., 2005, A study on the data analysis and utilization method based on datamining concept in ship design. 2005 Conference of Society for Computer Aided Design and Computer Aided Engineering, Gangwon, Republic of Korea, 27 - 29 January 2005.
- Lee, K.J. Lee, J.K. & Choi, S.Y., 1996. A spatial scheduling system and its application to shipbuilding DAS-CURVE. Expert Systems With Applications, 10(3/4), pp.311-324. https://doi.org/10.1016/0957-4174(96)00010-3
- Lee, S.H., 2011. Block transportation planning in a shipyard. Ph.D. Thesis, Pusan National University.
- Lee, Y.H. Lee, K.C. Lee, K.J. & Son, Y.D., 2008. Study on the positioning system for logistics of ship-block. Special Issue of the Society of Naval Acrchitects of Korea, pp.68-75.
- Park, C.K. & Seo, J.Y., 2006. JIBUN (location) assignment algorithm for assembly blocks : A case of Hyundai Heavy Industries. Industrial Engineers Interfaces, 19(2), pp.160-167.
- Park, M.H. Lee, W.S. Ock, Y.S. & Lee, T.E., 1995. A review of Korean shipbuilding industry and engineering research. Industrial Engineers Interfaces, 8(2), pp.5-20.
- Roh, M.I., 2012. Block layout method in the block stockyard based on the genetic algorithm. Ocean Systems Engineering, 2(4), pp.271-287. https://doi.org/10.12989/ose.2012.2.4.271
- Son, J.R. Seo, H.W. & Ha, B.H., 2014. A heuristic algorithm for block storage planning in shipbuilding. Journal of the Society of Naval Architects of Korea, 51(3), pp.239-245. https://doi.org/10.3744/SNAK.2014.51.3.239
- Quinlan, J.R. 1993. Programs for machine learning. Morgan Kaufmann Publishers: San Francisco.