References
- Y. V. Makarov, C. Loutan, M. Jian, and P. de Mello, "Operational Impacts of Wind Generation on California Power Systems," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 1039-1050, May. 2009. https://doi.org/10.1109/TPWRS.2009.2016364
- C. Ulam-Orgil, H.-W. Lee, and Y.-C. Kang, "Evaluation of the Wind Power Penetration Limit and Wind Energy Penetration in the Mongolian Central Power System," Journal of Electrical Engineering and Technology, vol. 7, no. 6, pp. 852-858, March. 2012. https://doi.org/10.5370/JEET.2012.7.6.852
- J.-K. Lyu, J.-H. Heo, M.-K. Kim, and J.-K. Park, "Impacts of Wind Power Integration on Generation Dispatch in Power Systems," Journal of Electrical Engineering and Technology, vol. 8, no. 3, pp. 453-463, May. 2013. https://doi.org/10.5370/JEET.2013.8.3.453
- L. Wu, M. Shahidehpour, and T. Li, "Stochastic Security-Constrained Unit Commitment," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 800-811, May. 2007. https://doi.org/10.1109/TPWRS.2007.894843
- A. Tuohy, P. Meibom, E. Denny, and M. O. Malley, "Unit Commitment for Systems With Significant Wind Penetration," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 592-601, May. 2009. https://doi.org/10.1109/TPWRS.2009.2016470
- T. Szantai, "A computer code for solution of probabilistic-constrained stochastic programming problems," Numerical techniques for stochastic optimization, pp. 229-235, 1988.
- H. Zhang and P. Li, "Chance Constrained Programming for Optimal Power Flow Under Uncertainty," IEEE Trans. Power Syst., vol. 26, no. 4, pp. 2417-2424, Nov. 2011. https://doi.org/10.1109/TPWRS.2011.2154367
- H. Yu, C. Y. Chung, K. P. Wong, and J. H. Zhang, "A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1568-1576, Aug. 2009. https://doi.org/10.1109/TPWRS.2009.2021202
- U. A. Ozturk, M. Mazumdar, and B. A. Norman, "A solution to the stochastic unit commitment problem using chance constrained programming," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1589-1598, Aug. 2004. https://doi.org/10.1109/TPWRS.2004.831651
- Q. Wang, J. Wang, and Y. Guan, "Stochastic Unit Commitment With Uncertain Demand Response," IEEE Trans. Power Syst., vol. 28, no. 1, pp. 562-563, Feb. 2013. https://doi.org/10.1109/TPWRS.2012.2202201
- C. Zhao, Q. Wang, J. Wang, and Y. Guan, "Expected Value and Chance Constrained Stochastic Unit Commitment Ensuring Wind Power Utilization," IEEE Trans. Power Syst., vol. 29, no. 6, pp. 2696-2705, Nov. 2014. https://doi.org/10.1109/TPWRS.2014.2319260
- Q. Wang, Y. Guan, and J. Wang, "A Chance-Constrained Two-Stage Stochastic Program for Unit Commitment With Uncertain Wind Power Output," IEEE Trans. Power Syst., vol. 27, no. 1, pp. 206-215, Feb. 2012. https://doi.org/10.1109/TPWRS.2011.2159522
- D. Pozo and J. Contreras, "A Chance-Constrained Unit Commitment With an n-K Security Criterion and Significant Wind Generation," IEEE Trans. Power Syst., vol. 28, no. 3, pp. 2842-2851, Aug. 2013. https://doi.org/10.1109/TPWRS.2012.2227841
- H. Wu, M. Shahidehpour, Z. Li, and W. Tian, "Chance-Constrained Day-Ahead Scheduling in Stochastic Power System Operation," IEEE Trans. Power Syst., vol. 29, no. 4, pp. 1583-1591, July. 2014. https://doi.org/10.1109/TPWRS.2013.2296438
- H. Chen, Y. Kong, G. Li, and L. Bai, "Conditional value-at-risk-based optimal spinning reserve for wind integrated power system," Int. Trans. on Electrical Energy Syst., vol. 26, no. 8, pp. 1799-1809, Jan. 2016. https://doi.org/10.1002/etep.2180
- J. Luedtke, S. Ahmed, and G. Nemhauser, "An integer programming approach for linear programs with probabilistic constraints," Mathematical Programming, vol. 122, no. 2, pp. 247-272, April. 2010. https://doi.org/10.1007/s10107-008-0247-4
- D. Pozo, J. Contreras, and E. E. Sauma, "Unit Commitment With Ideal and Generic Energy Storage Units," IEEE Trans. Power Syst., vol. 29, no. 6, pp. 2974-2984, Nov. 2014. https://doi.org/10.1109/TPWRS.2014.2313513
- E. Lannoye, D. Flynn, and M. O'Malley, "Transmission, Variable Generation, and Power System Flexibility," IEEE Trans. Power Syst., vol. 30, no. 1, pp. 57-66, Jan. 2015. https://doi.org/10.1109/TPWRS.2014.2321793
- Y. Wen, C. Guo, H. Pandzic, and D. S. Kirschen, "Enhanced Security-Constrained Unit Commitment With Emerging Utility-Scale Energy Storage," IEEE Trans. Power Syst., vol. 31, no. 1, pp. 652-662, Jan. 2016. https://doi.org/10.1109/TPWRS.2015.2407054
- X. Ye, Y. Qiao, Z. Lu, Y. Min, and N. Wang, "Study on Multi-scale Unit Commitment Optimization in the Wind-Coal Intensive Power System," Journal of Electrical Engineering and Technology, vol. 8, no. 6, pp. 1596-1604, Nov. 2013. https://doi.org/10.5370/JEET.2013.8.6.1596
- W. Wu, B. Zhang, J. Chen, and T. Zhen, "Multiple time-scale coordinated power control system to accommodate significant wind power penetration and its real application," in IEEE Power and Energy Society General Meeting, 2012, pp. 1-6.
- W.-S. Tan and M. Shaaban, "Hybrid Stochastic/ Deterministic Unit Commitment with Wind Power Generation," in IEEE Eindhoven PowerTech, 2015, pp. 1-6.
- M. Carrion and J. M. Arroyo, "A Computationally Efficient Mixed-Integer Linear Formulation for the Thermal Unit Commitment Problem," IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1371-1378, Aug. 2006. https://doi.org/10.1109/TPWRS.2006.876672
- J. F. Restrepo and F. D. Galiana, "Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment," IEEE Trans. Power Syst., vol. 26, no. 1, pp. 401-410, Feb. 2011. https://doi.org/10.1109/TPWRS.2010.2048345
- P. Wong, P. Albrecht, R. Allan, R. Billinton, Q. Chen, C. Fong, et al., "The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999. https://doi.org/10.1109/59.780914
- A. Truewind. A Report to the Ontario Power Authority (OPA) WIND GENERATION DATA. http://www.powerauthority.on.ca/integrated-powersystem-plan/simulated-wind-generation-data, March 24th 2016.