Abstract

This paper describes the development process, the innovative techniques used and insights gained from the latest integrated, full scope, multistate Level 2 PSA analysis conducted at the Leibstadt Nuclear Power Plant (KKL), Switzerland. KKL is a modern single-unit General Electric Boiling Water Reactor (BWR/6) with Mark III Containment, and a power output of $3600MW_{th}/1200MW_e$, the highest among the five operating reactors in Switzerland. A Level 2 Probabilistic Safety Assessment (PSA) analyses accident phenomena in nuclear power plants, identifies ways in which radioactive releases from plants can occur and estimates release pathways, magnitude and frequency. This paper attempts to give an overview of the advanced modeling techniques that have been developed and implemented for the recent KKL Level 2 PSA update, with the aim of systematizing the analysis and modeling processes, as well as complying with the relatively prescriptive Swiss requirements for PSA. The analysis provides significant insights into the absolute and relative importances of risk contributors and accident prevention and mitigation measures. Thanks to several newly developed techniques and an integrated approach, the KKL Level 2 PSA report exhibits a high degree of reviewability and maintainability, and transparently highlights the most important risk contributors to Large Early Release Frequency (LERF) with respect to initiating events, components, operator actions or seismic component failure probabilities (fragilities).

Keywords

References

  1. ENSI, Probabilistic Safety Analysis (PSA): Quality and Scope, ENSI-A05/e, March 2009.
  2. IAEA, Development and Application of Level 2 Probabilistic Safety Assessment for Nuclear Power Plants, SSG-4, May 2010.
  3. BNL, An Approach for Estimating the Frequencies of Various Containment Failure Modes and Bypass Events, NUREG/CR-6595, October 2004.
  4. IRSN, Best-practices Guidelines for Level 2 PSA Development and Applications, ASAMPSA2/WP2-3/D3.3/2013-35, April 2013.
  5. U.S.NRC, Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants, NUREG-1150, December 1990.
  6. SNL, Evaluation of Severe Accident Risks: Grand Gulf, Unit 1, SAND86-1309, December 1990.
  7. SNL, State-of-the-art Reactor Consequence Analyses Project, Volume 1: Peach Bottom Integrated Analysis, NUREG/CR-7110 Rev. 1, May 2013.
  8. ASME/ANS, Severe Accident Progression and Radiological Release (Level 2) PRA Standard for Nuclear Power Plant Applications for Light Water Reactors (LWRS), ASME/ANS RA-S-1.2-2014, January 2015.
  9. NEA, Flame Acceleration and Deflagration-to-detonation Transition in Nuclear Safety, NEA/CSNI/R(2000)7, August 2000.
  10. Swissnuclear, Intermediate Seismic Hazard (May 2011) - Evaluation of an Intermediate Seismic Hazard for the Existing Swiss Nuclear Power Plants, FGK-11.039.GS, June 2011.
  11. IAEA, Procedures for Conducting Probabilistic Safety Assessment of Nuclear Power Plants (Level 2), No. 50-P-8, 1995.