DOI QR코드

DOI QR Code

The Concurrent Processing Methodology of BPR and Information System Building

BPR과 정보시스템 구축을 동시 병행 수행하는 방법론

  • Han, Kwang-Shin (Dept. of Information Systems, Pukyong Nat. Univ.) ;
  • Park, Man-Gon (Dept. of IT Convergence and Application Engineering, PuKyong Nat. Univ.)
  • Received : 2017.03.31
  • Accepted : 2017.06.12
  • Published : 2017.07.31

Abstract

Changes in the business environment and increased competitiveness have led many companies to consider Business Process Reengineering(BPR) as a means to improve performance. However, while some BPR projects have been successful among the many companies that have performed BPR, most of the reengineering efforts have been deemed unsuccessful as the project failed. There are many answers to this, but the most important point is that the effective linkage between process innovation and information system construction is insufficient. Even if the reform of consciousness is carried out through the promotion of management innovation activities such as BPR, and the process is improved, management infrastructure can not be continuously maintained if infrastructure, especially information system, is not built up to support it. In this paper, we propose BPR and information system combining methodology for successful BPR execution and information system construction, and describe the result of BPR consulting performance when constructing information system and compare the improvement of failure risk factor. In addition, we present the case through the case of K company, and finally present customer satisfaction through post evaluation after completion of K company information system construction project implementation.

Keywords

References

  1. M. Hammer, "Reengineering Work: Don't Automate," Obliterate, Harvard Business Review, Vol. 68, No. 4, pp. 104-112, 1990.
  2. D. Morris and J. Brandon, Reengineering Your Business, London: McGraw Hill, 247, 1993.
  3. T.H. Davenport and J.E. Short, “The New Industrial Engineering Information Technology and Business Process Redesign,” Slogan Management Review, Vol. 31, No. 4, pp. 11-27, 1990.
  4. O.H. Kwon, A Methodology for Concurrent Alignment of Business Process Reengineering and Information Technology, Master's Thesis of Korea Advanced Institute of Science and Technology, 1998.
  5. Theoretical Considerations on BPR, http://blog.naver.com/PostView.nhn?blogId=parkstwo&logNo=220142615805 (accessed Oct., 06, 2014).
  6. B.J. Bashein, M.L. Markus, and P. Riley, “Preconditions for BPR Success and How to Prevent Failures,” Information Systems Management, Vol. 11, No. 2, pp. 7-13, 1994. https://doi.org/10.1080/10580539408964630
  7. V. Grover, S.R. Jeong, W.J. Kettinger, and J.T.C. Teng, “The Implementation of Business Process Reengineering,” Journal of Management Information System, Vol. 12, No. 1, pp. 109-144, 1995. https://doi.org/10.1080/07421222.1995.11518072
  8. M.M. Klein, “The Most Fatal Reenineering Mistakes,” Information Strategy: The Executive’s Journal, Vol. 10, No. 4, pp. 21-28, 1994.
  9. W.J. Kettinger, J.T.C. Teng, and S. Guha, "Business Process Change: A study of Methodologies, Techniques, and Tools," Management Information Systems Quarter, pp. 55-90, 1997.
  10. Y.A. Pollalis, "A Systematic Approach to Change Management: Integrating Is Planning, BPR, and TQM," Information Systems Management, Vol. 13, No. 2, pp 55-80, 1996.
  11. W.J. Kettinger, J.T.C. Teng, and S. Guha, "A Study of Methodologies, Techniques, and Tools," Management Information Systems Quarter, pp 55-90, 1997.
  12. Y.A. Pollalis, "A Systematic Approach to Change Management: Integrating Is Planning, BPR, and TQM," Information Systems Management, Vol. 13, No. 2, pp 55-80, 1996.
  13. T. Debela and A. Hagos, The Design and Implementation of Business process Reengineering in the Ethiopian Public Sector, Organization for Social Science Research in Eastern and Southern Africa, Addis Ababa, 2011.
  14. M. Lehnert, A. Linhart, and M. Roeglinger, “Exploring the Intersection of Business Process Improvement and BPM Capability Development: A Research Agenda,” Business Process Management Journal, Vol. 23, No. 2, pp. 275-292, 2017. https://doi.org/10.1108/BPMJ-05-2016-0095
  15. W. Khlif, H. Ben-Abdallah, and N.E. Ben Ayed, “A Methodology for the Semantic and Structural Restructuring of BPMN Models,” Business Process Management Journal, Vol. 23, No. 1, pp. 16-46, 2017. https://doi.org/10.1108/BPMJ-12-2015-0186
  16. D.A. Park, and M.G. Park, “A Study on the Quality Improvement of Information System Auditing for Agile Methodology,” Journal of Korea Multimedia Society, Vol. 20, No. 4, pp. 660-670, 2017. https://doi.org/10.9717/kmms.2017.20.4.660