Development of Synchro-EVM System Integrating TOC-CPM and EVM

TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구

  • Lee, Do-Hern (Department of Industrial Engineering, University of Ulsan) ;
  • Jang, Gil-Sang (Department of Management Information Systems, University of Ulsan)
  • 이도헌 (울산대학교 산업경영공학부) ;
  • 장길상 (울산대학교 경영정보학과)
  • Accepted : 2017.11.18
  • Published : 2017.12.31

Abstract

Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

Keywords

References

  1. Bae, D.H. and Cho, C.Y.(2000), "Samsung construction EVMS case.", Construction Engineering and Management, 1(2):8-10.
  2. Hong, S.Y.(2013), "Comparative study on feeding buffer estimation in plant construction project with CCPM." Dept. of Project Management, Graduate school of Engineering, Hanyang University.
  3. Peng, W. and Huang, M. (2013), "A critical chain project scheduling method based on a differential evolution algorits." International Journal of Production Research, 52(13):3940-3949. https://doi.org/10.1080/00207543.2013.865091
  4. Shin, K.Y.(2009), "A study on the method of applying CCPM to shipbuilding industry", Department of Naval Architecture and Ocean engineering Graduate School, Pusan National University.
  5. Song, J.H.(2014), "A study on the reflection of actual man hour using earned value management system for the production project management.", Institute Of e-Vehicle Technology, University of Ulsan.
  6. Shin, M.S.(2013), "A study on the application method of EVMS control account to construction projet of thermal power plant & nuclear powerplant." Department of Project Management, Graduate School of Soongsil University.
  7. Sharma, V.K.(2013), "Earned Value Management : A tool for project performance.", Advances In Management, 6(5):37-42,
  8. Tatebe, K. and Seki, T.(2006), "On an EVM Application in CCPM-scheduled projects.", Journal of the Society of Project Management, 8(1):29-32.
  9. Realization Technologies, Inc.(2012), "Integrating Earned Value Management with Critical Chain Execution.",