DOI QR코드

DOI QR Code

Scanned Drawing-based Production Management System for Deckhouse Floor Outfitting

스캔도면 기반 선실바닥의장 생산관리 시스템 개발

  • Received : 2016.03.23
  • Accepted : 2017.02.13
  • Published : 2017.04.30

Abstract

A production management system is developed to enhance both the information and productivity of ship and offshore plant deckhouse floor outfitting. The functions of the production management system for the deckhouse floor outfitting were reviewed based on a literature survey of several production management systems with respect to the ship building and architecture fields. This study investigated numerous daily production reports and their application to actual work places to utilize the system development. The developed scanned drawing-based production management (SDPM) system minimizes any loss and/or distortion of work information between the workshop and management office when applying a scanned production drawing to the daily report. The SDPM system increases the data objectivity, as well as intuitiveness of the information generation by adopting an efficient user interface, which makes it possible to perform image annotations on the scanned drawing for the daily production report while simultaneously interacting with the production management database. Applying the system operation to actual deckhouse floor covering work verified that it was feasible to use the SDPM system for production management in the ship outfitting work process.

Keywords

References

  1. Anne, H., Thomas, P., Bob, S., Ethan, W., 2006. Microsoft Windows 2000 Server. John Wiley & Sons, New Jersey.
  2. Back, M.K., Shin, J.K., Ryu, C.H., 2013. Development of Naval Architecture Production Execution Scheduling Support System Based on Simulation. Bulletin of the Society of Naval Architects of Korea, 50(2), 20-25.
  3. Charles, B., Mats, K., Lars, T., 2013. MySQL High Availability: Tools for Building Robust Data Centers. O'Reilly Media, California.
  4. Cho, H.H., Kang, K.I., 2001. Development of Project Management System Based on Daily Report for Historical Data Acquisition and Storage. Journal of the Architectural Institute of Korea Structure & Construction, 17(11), 123-130.
  5. Kang, W.Y., Jin, S.Y., Kim, Y.S., 2003. A Task Information Framework for Daily Report Management. Journal of Korea Institute of Construction Engineering and Management, 4, 513-516.
  6. Kevin, T., Peter, M., Rasmus, L., 2013. Programming PHP. 3rd Edition, O'Reilly Media, California.
  7. Park, C.J., Park, H.T., 2004. A study on the Human Resource Management through Application of Daily Scheduling Check System. Journal of Korea Institute of Construction Engineering and Management, 5(1), 124-132.
  8. Park, J.Y., Oh, H.S., Moon, S.Y., 2013. Development of Naval Architecture Production Quality and Process Management Support System Based on Smartwork. Bulletin of the Society of Naval Architects of Korea, 50(2), 26-32.
  9. Song, S., Kim, W., Kim, O.K., Lee, H.S., 2001. The Definition of Input Data Required for Integrated Site Information Database. Journal of the Architectural Institute of Korea Structure & Construction, 21(2), 635-638.