DOI QR코드

DOI QR Code

Enhanced total phosphorus removal using a novel membrane bioreactor by sequentially alternating the inflow and by applying a two-stage coagulation control based on pre-coagulation

유입흐름 변경 및 전응집 기반 이단응집 제어 적용 MBR을 통한 총인처리 개선 연구

  • Received : 2016.12.27
  • Accepted : 2017.02.20
  • Published : 2017.02.28

Abstract

A membrane bioreactor by sequentially alternating the inflow and by applying a two-stage coagulation control based on pre-coagulation was evaluated in terms of phosphorus removal efficiency and cost-savings. The MBR consisted of two identical alternative reaction tanks, followed by aerobic, anoxic and membrane tanks, where the wastewater and the internal return sludge alternatively flowed into each alternative reaction tank at every 2 hours. In the batch-operated alternative reaction tank, the initial concentration of nitrate rapidly decreased from 2.3 to 0.4 mg/L for only 20 minutes after stopping the inflow, followed by substantial release of phosphorus up to 4 mg/L under anaerobic condition. Jar test showed that the minimum alum doses to reduce the initial $PO_4$-P below 0.2 mg/L were 2 and 9 mol-Al/mol-P in the wastewater and the activated sludge from the membrane tank, respectively. It implies that a pre-coagulation in influent is more cost-efficient for phosphorus removal than the coagulation in the bioreactor. On the result of NUR test, there were little difference in terms of denitrification rate and contents of readily biodegradable COD between raw wastewater and pre-coagulated wastewater. When adding alum into the aerobic tank, alum doses above 26 mg/L as $Al_2O_3$ caused inhibitory effects on ammonia oxidation. Using the two-stage coagulation control based on pre-coagulation, the P concentration in the MBR effluent was kept below 0.2 mg/L with the alum of 2.7 mg/L as $Al_2O_3$, which was much lower than 5.1~7.4 mg/L as $Al_2O_3$ required for typical wastewater treatment plants. During the long-term operation of MBR, there was no change of the TMP increase rate before and after alum addition.

Keywords

References

  1. Gyeonggi Research Institute (2013). Improvement of T-P treatment facility on sewage treatment plants in Gyeonggi-Do, 2013-67.
  2. Hwang, E.J. and Cheon, H.C. (2009). High-rate phosphorus removal by PAC (poly aluminum chloride) coagulation of A2O effluent, J. Kor. Soc. Environ. Eng., 31(9), 673-678.
  3. Ji, J., Qiu, J., Wong, F. and Li, Y. (2008). Enhancement of filterability in MBR achieved by improvement of supernatant and floc characteristics via filter aids addition", Water Res., 42(14), 3611-3622. https://doi.org/10.1016/j.watres.2008.05.022
  4. Korean Ministry of Environment (2012). Final report on the improvement of T-P treatment facilities.
  5. Korean Ministry of Environment (2013). 2012 annual analysis report on the operation and management of public sewage wastewater treatment facilities.
  6. Korean Ministry of Environment (2014). A road map study for assessing and managing nutrient pollution in the public water.
  7. Korean Ministry of Environment (2015). 2014 annual analysis report on the operation and management of public sewage wastewater treatment facilities.
  8. Korean National Institute of Environmental Research (2010). A handbook on maintenance and management of T-P treatment facilities of public sewage wastewater treatment facilities. 11-1480523-000674-01.
  9. Lee, S.M., Lim, K.H., Kim, J.M. and Kim, I.G. (2008). Characterization and COD fractionation in municipal wastewater in Chungnam area for nutrients removal process, J. Kor. Soc. Urban Environ., 8(1), 81-88.
  10. Lee, S.M. and Lim, K.H. (2010). Effect of simultaneous precipitation process on biomass activity on the biological nutrient removal, J. Kor. Soc. Urban Environ., 10(1), 111-123.
  11. Park, I.G., Lee, K.Y., Eom, T.Y. and Lim, K.H. (2012). A comparative study of phosphorus removal condition by PAC coagulation of membrane effluent, J. Kor. Soc. Urban Environ., 21(2), 123-127.
  12. Park, H., Park, S.M., Lee, K.C., Yu, S.J., Kwon, O.S. and Kim, S.J. (2011). Survey of physicochemical methods and economic analysis of domestic wastewater treatment plant for advanced treatment of phosphorus removal, J. Kor. Soc. Environ. Eng., 33(3), 212-221(2011). https://doi.org/10.4491/KSEE.2011.33.3.212
  13. Wu, J., Chen, F., Huang, X., Geng, W. and Wen, X. (2006). Using inorganic coagulants to control membrane fouling in a submerged membrane bioreactor", Desalination, 197, 124-136. https://doi.org/10.1016/j.desal.2005.11.026
  14. Yun, S., Ryu, J. and Oh, J. (2012). T-P removal efficiency according to coagulant dosage and operating cost analysis, J. Kor. Soc. Environ. Eng., 34(8), 549-556. https://doi.org/10.4491/KSEE.2012.34.8.549
  15. Zahid, W.M. and El-Shafai, S.A. (2012). Impacts of alum addition on the treatment efficiency of cloth-media MBR, Desalination, 301, 53-58. https://doi.org/10.1016/j.desal.2012.06.010