DOI QR코드

DOI QR Code

Priority Analysis of BIM Technologies Development Using Cluster Analysis

군집분석을 통한 BIM 기술개발 우선순위 분석

  • Yun, Seok-Heon (Department of Architectural Engineering, GyeongSang National University)
  • Received : 2016.05.26
  • Accepted : 2016.09.20
  • Published : 2016.09.30

Abstract

In order to complete system using BIM technologies through life cycle of construction project, various tools and technologies which could be used in their phases are to be developed. BIM. In order to develop and adopt BIM technologies systematically through the life cycle of construction projects, it is required to identify the technologies to be develop and establish the strategy for their develop and adopt for construction project. In this study, 106 expected future technologies could be used with BIM are identified with the literature review. In order to establish development priorities of them, cluster analysis is used. As a result of analysis, 5 clusters are identified and they could be used for technology development strategy.

Keywords

Acknowledgement

Supported by : 국토교통부

References

  1. Jeong, K., Moon. T., & Heo, S. (2010). A Study on U-Service Pool Evaluation and SRM Template for Development of U-City SRM, Journal of Korean Planners Association, 45(2), 289-303
  2. Lee, J., & Kim, Y. (2003). A Study on Technology Roadmap for Construction Automation and Robotics, Journal of Architectural Institute of Korea, 19(5), 95-104
  3. Lee, S., Kwak, C., Lee, K., Shin, T., Chin, S., & Kim Y. (2009), 2009 Conference Proceedings of Architectural Institute of Korea, 29(1), 677-680
  4. Park, H., & Kim, S. (2016), Development of Construction R&D Strategy through the International Construction Market Analysis, Korean Journal of Construction Engineering and Management, 17(2), 49-57
  5. Kang, T., Kim, J., & Choi, H. (2014). BIM based FM System Usecase Analysis, KIBIM Annual Conference, 8-9
  6. Kumar, P., Balasubramanian, M., & Jagadish, S. (2016). Robotics in Construction Industry. Indian Journal of Science and Technology, 9(23), 1-12.
  7. Son, K., & Ryu, H. (2015). Integrated System Development Methodology Design And LCC (Life Cycle Cost) Data Process. Indian Journal of Science and Technology, 8(24), 1-9.
  8. Kalyani, B., & Ramchand, H. (2016). A Roadmap to Develop Multi Cloud Computing Systems. Indian Journal of Science and Technology, 9(19), 1-4.
  9. Varun, R., Rohith, R., Ranjithh, R., & Krishna, P. (2016). Industrial Automation using Wireless Sensor Networks. Indian Journal of Science and Technology. 9(8), 1-8.
  10. BIM Industry Working Group (2011), Strategy Paper for the Government Construction Client Group, BIM Industry Working Group
  11. Jusuf, A. (2013), Updates on Singapore BIM Roadmap, International Panel of Experts for BIM, BCA, 2-6
  12. Malika, C., Nadia, G., Veronique, B., & Azam, N. (2015). Package 'NbClust'. Retrieved April. 13, 2015 from https://sites.google.com/site/malikacharrad/research/nbclust-package