References
- Ding, L., Wang, A.M., Ning, R.X., 2010. Job-shop scheduling technology with uncertain processing time. Comput. Integr. Manuf. Syst. 16 (1), 98-108.
- Driessel, R., Monch, L., 2012. An integrated scheduling and material-handling approach for complex job shops: a computational study. Int. J. Prod. Res. 50 (20), 5966-5985. https://doi.org/10.1080/00207543.2011.639099
- Erol, R., Sahin, C., Baykasoglu, A., Kaplanoglu, V., 2012. A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing systems. Appl. Soft Comput. 12 (6), 1720-1732. https://doi.org/10.1016/j.asoc.2012.02.001
- Jia, Y.R., Jiang, Z.Y., 2009. Research on application of reconfigurable manufacturing execution system in plane block production line. Shipbuild. Tech. 287 (1), 39-41.
- Luo, L., 2011. Application of man-hour and output analysis in plane block production line. Guangdong Shipbuild. 30 (1), 66-68.
- Lee, K., Shin, J.G., Ryu, C., 2009. Development of simulation-based production execution system in a shipyard: a case study for a panel block assembly shop. Prod. Plan. Control 20 (8), 750-768. https://doi.org/10.1080/09537280903164128
- Liu, L.G.H.X.Y., 2008. Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time. Chin. J. Mech. Eng. 44 (5), 68-75.
- Ozkok, M., Helvacioglu, I.H., 2013. Determination of the effects of the pre-outfitting and pre-piping assembly operations on shipyard productivity. Pol. Marit. Res. 20 (1), 59-69.
- Qian, B., Ling, W., Xian, H.D., Jiang, Y.H., Xiong, W., 2009. Rolling strategy and optimization algorithm for dynamic no-wait flow shop scheduling problem. Control Decis. 24 (4), 481-487.
- Wu, G.B., 2011. Brief analysis on production management of shipbuilding panel production flow line. Guangdong Shipbuild. 30 (3), 70-73.
- Zhang, Z.Y., Liu, D.Q.,L.I., 2012. Research on non-completely hybrid flow line scheduling of panel block in shipbuilding. Comput. Integr. Manuf. Syst. 18 (11), 2435-2445.
- Zhao, D., 2012. Application of systems engineering in the panel production line. Jiangsu Ship 29 (2), 9-11.
- Zhou, W., He, J., Liu, S., Wang, X., 2009. A dynamic schedule based on integrated time performance prediction. In: 1st International Conference on Information Science and Engineering (ICISE). IEEE, pp. 1-4.
Cited by
- Analytical Solution of the serial Bernoulli production line steady-state performance and its application in the shipbuilding process vol.57, pp.4, 2016, https://doi.org/10.1080/00207543.2018.1500042
- Performance Evaluation and Improvement of Chipset Assembly & Test Production Line Based on Variability vol.16, pp.2, 2019, https://doi.org/10.1007/s11633-018-1129-8
- Minimize makespan of permutation flowshop using pointer network vol.9, pp.1, 2016, https://doi.org/10.1093/jcde/qwab068