참고문헌
- Kossiakoff, A. and W.N. Sweet, "Systems Engineering: Principles and Practice," Wiley-Interscience, Hoboken, NJ, pp. 69-109, (2011).
- U SNRC BULLETIN 2003-02, "Leakage from RPV lower head penetration and reactor coolant pressure boundary integrity," Aug. 21, 2003.
- St even Thomas, "PWSCC of Bottom Mount Instrument Nozzles at South Texas Project," ICONE12-49521, 12th International Conference on Nuclear Engineering, Arlington, Veriginia, USA, April 25-29, 2004.
- C hristine King, "Materials Reliability Program: South Texas Project Unit 1 Bottom Mounted Instrumentation Nozzles (#1and #46) Analysis Reports and Related Documentation (MRP-102)," 1009309, November 2003.
- K HNP, "APR1400 Standard Safety Analysis Report: Reactor coolant system and connected systems'' chapter 5, Korea Hydro and Nuclear Power Co. Ltd., (2002).
- Baik Jun Ki, Yang Jin Seok, and R. M. Field (2014), "PWSCC Mitigation for life extension of reactor vessel nozzles," Material selection in NPP design project report, Course E14004, KINGS, and South Korea.
- ST P's First-of-a-Kind Leakage Repair, Nuclear News, http://www2.ans.org/pubs/magazines/nn/docs/2004-10-2.pdf, pp. 32-34, 2004.
- P alo Verde Nuclear Generating Station (PVNGS) Unit 3, Docket No. STN 50-530, License No. NPF 74, Licensee Event Report 2013-001-00, 2013.
- Blanchard, B.S., and W.J. Fabrycky, "Systems Engineering and Analysis," 5th ed. Prentice-Hall International series in Industrial and Systems Engineering. Englewood Cliffs, NJ, USA: Prentice-Hall, pp. 142-161, (February 2010).
- I NCOSE, Systems Engineering Handbook, version 3.2.2., INCOSE-TP-2003-002-03.2.2., pp. 61-218, (October 2011).
- S.W.Glass, B, Everett, et Al, "Advances in J-weld Inspection for RPV head and RPV Bottom Mount Nozzles,", 9th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components, May22, 2012-Seattle, Washington, USA, 2012.
- E. D oh, Y. Kim, J. Kim, and C. Song, "inspection of bottom mounted instrumentation nozzles in Korea," KEPCO Plant Service and Engineering Co. Ltd., Korea, p. 590.
- Min-Su Park, Sang-Hoon Choi, Eui-Soon Doh, Nag-Jeam Kim, Dong-Il Kim, and Yoon-Won Kim, "inspection apparatus for reactor bottom mounted instrumentation nozzle," Patent US 20080240331 A1, Oct. 2, 2008.
- K HNP, "APR1400 Standard Safety Analysis Report: Design of Structures, Components, Equipment, and Systems," chapter 3, Korea Hydro and Nuclear Power Co. Ltd., (2002).
- CATIA version 5-6. (2012). "User guide, training and tutorials, and help manual," CATIA, Dassault Systems, 2012.
- Mats Wendel and Torbjorn Sjo, DEKRA Industrial, Sweden, "development of new manipulators for PWR and VVER vessel inspection," http://www.ndt.net/article/jrcnde2012/papers/89.pdf. pp. 538-539, 2011.
- Eddyfi, "tubing inspection probe catalog," March 2015, www.eddyfi.com
- WESDYNE web site, "A Westinghouse NDE Company,'' 2015, www.wesdyne.com.
- USA, Diakont Advanced Technologies, "MicroCam, specification sheet," 2015 http://www.diakont.com/
- A SME Boiler and Pressure Vessel Code, “Rules for In-service Inspection of Nuclear Power Plant Components,” Section XI, IWA-1400, pp.2, (2010).