참고문헌
- Monch J. W, Fowler S, Dauzere-Peres S. J and Mason O. R, "A survey of problem, solution, and future challenges in scheduling semiconductor manufacturing operations", Journal of Scheduling, Vol.14, No.6, pp.583-599, 2011. DOI: http://dx.doi.org/10.1007/s10951-010-0222-9
- Chen T. L, "A self-adaptive agent-based fuzzy-neural scheduling system for a wafer fabrication factory", Expert Systems with Applications, Vol.38, No.6, pp.7158-7168, 2011. DOI: http://dx.doi.org/10.1016/j.eswa.2010.12.044
- Fu M, Askin R, Fowler J, Haghnevis M, Keng N, Pettinato J. S and Zhang M, "Batch production scheduling for semiconductor back-end operations", Semiconductor Manufacturing, IEEE Transactions, Vol.24, No.2, pp.249-260, 2011. DOI: http://dx.doi.org/10.1109/TSM.2011.2114900
- Cheng H. C and Chiang T. C, "A two-stage hybrid memetic algorithm for multi objective job shop scheduling", Expert Systems with Applications, Vol.38, No.9, pp.10983-10998, 2011. DOI: http://dx.doi.org/10.1016/j.eswa.2011.02.142
- Sha D. Y, Hsu S. Y, Che Z. H and Chen C. H, "A dispatching rule for photolithography scheduling with an on-line rework strategy", Computers and Industrial Engineering, Vol.50, No.3, pp.233-247, 2006. DOI: http://dx.doi.org/10.1016/j.cie.2006.04.002
- Kayton D, Teyner T, Schwartz C and Uzsoy r, "Effects of dispatching and down time on the performance of wafer fabs operating under theory of constraints", Proceedings of the 1996 IEEE/CPMT international electronics manufacturing technology symposium 14-16 October Austin TX USA, pp.49-56, 1996. DOI: http://dx.doi.org/10.1109/IEMT.1996.559681
- Uzsoy R, Church L. K and Ovacik I. M, "Dispatching rules for semiconductor testing operations: a computational study", Proceedings of the thirteenth IEEE/CHMT international electronics manufacturing technology symposium 28-30 September, pp.272-276, 1992. DOI: http://dx.doi.org/10.1109/IEMT.1992.639903
- H. J. Yoon and J. G. Kim, "Heuristic scheduling policies for a semiconductor wafer fabrication facility: minimizing variation of cycle times", The International Journal of Advanced Manufacturing Technology, Vol.67, No.1, pp.171-180, 2013. DOI: http://dx.doi.org/10.1007/s00170-013-4762-y
- S. W. Yoon, Y. J. Cho and S. J. Jeong, "Combination effects analysis of bottleneck-load order review/release and the dispatching rule: Application to a printed circuit board manufacturing line with multiple bottlenecks", International Journal of Precision Engineering and Manufacturing, Vol.15, No.8, pp.1725-1732, 2014. DOI: http://dx.doi.org/10.1007/s12541-014-0525-4
- Chen C. F, Wu K. J, Chang C. T, Wong D. S. H and Jang S. S, "Generation and verification of optimal dispatching policies for multi-product multi-tool semiconductor manufacturing processes", Computers and Chemical Engineering, Vol.52, No.3, pp.112-121, 2013. DOI: http://dx.doi.org/10.1016/j.compchemeng.2012.12.009
- Thiesse F and Fleisch E, "On the value of location information to lot scheduling in complex manufacturing processes", International Journal of Production Economics, Vol.112, No.2, pp.532-547, 2008. DOI: http://dx.doi.org/10.1016/j.ijpe.2007.05.006
- Vinod V and Sridharan R, "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system", International Journal of Production Economics, Vol.129, No.1, pp.127-146, 2011. DOI: http://dx.doi.org/10.1016/j.ijpe.2010.08.017
- Weigert G, Klemmt A and Horn S, "Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility", International Journal of Production Research, Vol.47, No.8, pp.2165-2184, 2009. DOI: http://dx.doi.org/10.1080/00207540902744784
- GRAVES, R. J., KONOPKA, J. M., & MILNE, R. J. (1995). Literature review of material flow control mechanisms. Production Planning & Control, 6(5), 395-403. DOI: http://dx.doi.org/10.1080/09537289508930296
- Glassey, C.R. and Resende, M.C.G., "A Scheduling Rule for Job Release in Semiconductor Fabrication,", Operations Research Letters, 7, 213-217, 1998. DOI: http://dx.doi.org/10.1016/0167-6377(88)90033-8