VRIO Model Based Enterprise Capability Assessment Framework for Plant Project

VRIO 모델 기반의 기업역량평가 프레임워크 제시에 관한 연구 - 플랜트 사업을 중심으로 -

  • Min, Byeong Su (Civil and Environmental Division, Hanwha Engineering&Construction) ;
  • Min, Jang Hee (Department of Civil and Environmental, Yonsei University) ;
  • Jang, Woosik (Department of Civil and Environmental, Yonsei University) ;
  • Han, Seung-Heon (Depart of Civil and Environmental Engineering, Yonsei University) ;
  • Kang, Sin Young (International Contractors Association of Korea)
  • Received : 2016.02.24
  • Accepted : 2016.04.12
  • Published : 2016.05.31

Abstract

Construction enterprises have performed various projects such as buildings, infrastructure and plant projects in the international market. Among these, the plant project's amount of orders accounted for about 68.9% of all. However, because of the enterprises won a contract with a low-budget for plant project in the last 10 years, the profit has dropped dramatically. And it is forecasted that there are extreme competition for bid award of plant projects because of the current falling oil prices and raising interest rates. In this circumstance, the comprehending of enterprises strength and weakness must be a priority to get a sustainable competitive advantage. Therefore this research suggests the enterprises's capability assessment framework and it is in order to diagnose the korean construction enterprises capabilities. The framework is based on the VRIO model that is on the basis of resource based theory. First, the capability assessment indices and their importance and priority that based on the life-cycle of plant project is deducted by literature review and survey. Second, the 5 point likert score applied VRIO survey is conducted to diagnose the enterprises and quantified the survey result using the fuzzy theory. Lastly, the competitvie implication and capability assessment are deducted.

건설사들은 국내 건설 경기 침체에 따라 해외 사업을 물색하고 건축, 토목, 플랜트 등 다양한 사업을 수주하여 진행해오고 있다. 해외 건설 공종 중 플랜트 공종은 지난 10년간(2005년~2014년) 전체 수주금액 중 평균 68.9%를 차지하며 국내 건설기업의 주력 공종으로 자리잡고 있다(해외건설협회). 그러나 플랜트 사업은 저가수주로 인해 최근 10년간 해외플랜트 수주 상승세와는 다르게 수익률은 저하되고 있으며 최근 미 금리 인상과 유가하락 장기화로 인해 플랜트 사업의 발주량은 더욱 저하될 것으로 예측되고 있어 향후 플랜트 사업 수주 경쟁은 더 심화될 것으로 전망되고 있다. 이러한 상황 속에서 기업이 지속적인 경쟁우위에 서기 위해서는 먼저 현재 국내 기업의 강점과 약점을 파악하여야한다. 따라서 본 연구는 국내 기업의 플랜트 사업 수행 내부역량을 분석하기 위해 자원기반이론을 바탕으로한 VRIO모델을 기반으로 사업 내부역량 평가 프레임워크를 개발하였다. 사업 내부역량 평가 프레임워크는, 문헌고찰을 통해 사업 수행단계 별(사업기획 및 계획, 설계, 구매조달, 시공) 지표를 도출하고 각 지표를 자원기반이론을 바탕으로 한 VRIO모델을 기준으로 전문가의 설문을 통해 우선순위 및 경쟁력수준을 도출하는 절차로 개발되었다.

Keywords

References

  1. Alavi, Maryam, and Leidner, D. E. (2001). "Review: Knowledge management and knowledge management systems: Conceptual foundations and research issues." MIS quarterly, pp. 107-136. https://doi.org/10.2307/3250961
  2. Bae, S. Y. (2010). "Deduction of the Component Factor for International LNG Plant Project Feasibility and Analysis of the Priority" Chung-Ang Univ.
  3. Chan, A. PC., and Chan, A. PL. (2004). "Key performance indicators for measuring construction success." Benchmarking: an international journal, 11(2), pp. 203-221. https://doi.org/10.1108/14635770410532624
  4. Choi, S. B. and Ha, G. R. (2011). "A Study of Critical Factors for Technological Innovation of Korean Manufacturing Firms", Korean Industrial Economic Association, 24(1), pp. 1-24.
  5. Chung, S. B., Choi, J. H., Shin, Y. S. and Chang K. T. (2013). "Evaluation Criteria of Competitiveness and Their Weighted Values for Railway Supply Industry" Journal of the Korean Society for Railway, pp. 1265-1268.
  6. Han, J. G., Chin, K. H. and Park, H. P. (2010). "Elicitation Project Management Factors and Evaluation of its Weight to Ensure LNG Plant Success" The Korea Institute of Building Construction, 10(1), pp. 85-89.
  7. International Construction Association of Korea(ICAK). (2015). International Construction Information Service. (Jan. 4, 2016)
  8. Jang, W. S., Hong, H. U. and Han, S. H. (2011). "Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase" Korean Journal of Construction Engineering and Management, , KICEM, 12(5), pp. 147-154.
  9. Kang, S. H. , Lee, H. J. and Leem C. S. (2010). "Analys is of Individual Capability Factors to Improve Business Performance in the Environment of Technological Convergence." Society for e-Business Studies, 15(3), pp. 183-193.
  10. Kang, H. W., (2012). "A Study on the Analysis of Risk Factors in Engineering, Procurement and Construction Phase for Overseas Plant Project" Journal Of The Architerctural Instritute of Korea Structure and Construction, 28(5),pp. 111-118.
  11. Kim, J. M., (2011). "Analysis of the Construction Duration and Cost Variation of International LNG Plant Project on EPC Risk factors" Chung-Ang Univ.
  12. Kim, J. U., Kim, J. B., Kim, T. U. and Park, S. T. (2013). "A case study on digital signage in korea." The journal of Digital Policy, pp. 149-158.
  13. Kim, K. S. and Lee, K. H. (2014). "The Impact of Resources on Organizarional performance in Public Research Institutes : From the Resource-Based View" The Korea Institute of Public Administration, 23(2), pp. 113-142.
  14. Kometa, Simon, T., PAUL, Olomolaiye, O., and Harris, F. C. (1995). "An evaluation of clients' needs and responsibilities in the construction process." Engineering, construction and Architectural management, 2(1), pp. 57-76. https://doi.org/10.1108/eb021003
  15. Kumaraswamy, M. M., and Thorpe, A. (1996). "Systematizing construction project evaluations." Journal of Management in Engineering, 12(1), pp. 34-39. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:1(34)
  16. Langdon, D. and Marrelli, A. (2002). "A New Model for Systematic Competency Identification," Performance Improvement, 41(4), pp. 16-23. https://doi.org/10.1002/pfi.4140410405
  17. Lee, C. W. (2001). "Country Competitiveness Theory of Michael E. Porter" Korea Research Institute for Human Settlement, pp. 60-65.
  18. Lim, C. S. and Mohamed, M. Z. (1999). "Criteria of project success: an exploratory re-examination" International journal of project management, 17(4), pp. 243-248. https://doi.org/10.1016/S0263-7863(98)00040-4
  19. Lim, J. A. and Kwon, S. W. (2011). "Analysis of success factors in construction IT convergence: applying AHP." Korean Journal of Construction Engineering and Management, KICEM, 12(4), pp. 130-138. https://doi.org/10.6106/KJCEM.2011.12.4.130
  20. Marrelli, A. (1998). "An introduction to competency analysis and modeling" Performance Improvement, 37(5), pp. 8-16. https://doi.org/10.1002/pfi.4140370505
  21. Michael, G. (2014). "Success Factors of Plant Engineering Project" Procedia Engineering, 69, pp. 361-369. https://doi.org/10.1016/j.proeng.2014.02.244
  22. Mirabile, R. (1997). "Everything You Wanted to Know about Competency Modeling." Training and Development, 51, pp. 73-77.
  23. Noh, K. J. (2015). "Intensified lease hardship hit the international win a contract... Construction companies suffer a direct hit" (Jan. 15, 2016)
  24. Park, C. J. (2004). "A Fuzzy Model for the Competitiveness Evaluation and Performance Measurement of Business." Management Accounting Association of Korea, 4(2), pp. 61-83.
  25. Park, H. P., Han, J. G. and Chin, K. H. (2010). "Development the Decision Making Support System of Construction Management in LNG Plant Project." The Society of Air-Conditioning and Refrigerating Engineers of Korea, pp. 818-823.
  26. Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., and Coyle, M. (1992). "Critical success factors for construction projects." Journal of construction engineering and management, 118(1), pp. 94-111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94)
  27. Shrnhur, Aurmi J., Levy, O. and Dvir, D. (1997). "Mapping the dimensions of project success." Project management journal, 28(2), pp. 5-13.
  28. Son, J. H., Lee, S. Y., Han, C. H. and Kim, J. o. (2007). "A Study on the Critical Success Factors for Engineering step on Plant Project" Korean Journal of Construction Engineering and Management, KICEM, 8(6), pp. 227-234.
  29. Spender, J. C. and Grant, R. M. (1996). "Knowledge and the firm: overview." Strategic management journal, 17.S2, pp. 5-9. https://doi.org/10.1002/smj.4250171103
  30. Tak, H. W., Won, S. K., Hwang, K. H., Han, C. H. and Lee, J. B. (2010). "Development on Standard Process of Pre-Construction Phase for Overseas Plant Projects" The Society of Air-Conditioning and Refrigerating Engineers of Korea, pp. 806-811.
  31. Won, S. K., Kang, M. W., Lee, J. B., Kim, S. K. and Han C. H. (2008). "An Analysis of Procurement Processes for the Application of System Prototype of Overseas Plant Projects" Journal of the Architectural Institute of Korea Structure & Construction, 24(2), pp. 113-120.
  32. Yang, S. W. and Jung, J. S. (2015). "The Case Study on Elon Musk and Tesla Motors: Based on the Analyses of Competitive Advantage Using Diamond Model" Management Consulting Research, 15(2), pp. 197-209.