References
- Bamford, W.F. (1984), "Rock test indices are being successfully correlated with tunnel boring machine performance", the 5th Australian Tunneling Conference, Melbourne, Vol. 2, pp. 9-22.
- Benardos, A.G., Kaliampakos, D.C. (2004), "Modelling TBM performance with artificial neural networks", Tunnelling and Underground Space Technology, Vol. 19, No. 6, pp. 597-605. https://doi.org/10.1016/j.tust.2004.02.128
- Benato, A., Oreste, P. (2015), "Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristics", Rock Mechanics and Mining Science, Vol. 74, pp. 119-127. https://doi.org/10.1016/j.ijrmms.2014.12.007
- Blindheim, O.T. (1979), "Boreability predictions for tunneling", Ph.D. Thesis, The Norwegian Institute of Technology, p. 406.
- Bruland, A. (1998). "Hard rock tunnel boring", Ph.D. Thesis, Norwegian University of Science and Technology.
- Chang, S.H., Choi S.W., Lee, G.J., Bae, G.J. (2011), "Rock TBM design model derived from the multi-variate regression analysis of TBM driving data", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 6, pp. 531-555.
- Chang, S.H., Choi, S.W., Bae, G.J., Jeon, S.W. (2007), "A parametric study of rock properties and mechanical cutting conditions for deriving an optimum design model of a TBM cutterhead equipped with disc cutters", Journal of The Korean Society of Civil Engineers, Vol. 21, No. 1(C), pp. 87-98.
- Cheema, S. (1999), "Development of a rock mass boreability index for the performance of tunnel boring machines", PhD thesis, Colorado School of Mines.
- Commission on Engineering and Technical Systems of USA (1984), Geotechnical site investigation for underground projects, Vol. 1 and Vol. 2, p. 182.
- Crow, S.C. (1975), "Jet tunnelling machines: a Guide for Design", Tunnels and Tunnelling International, Vol. 7, No. 2, pp. 23-38.
- Delisio, A., Zhao, J. (2014), "A new model for TBM performance prediction in blocky rock conditions", Tunnelling and Underground Space Technology, Vol. 43, pp. 440-452. https://doi.org/10.1016/j.tust.2014.06.004
- Delisio, A., Zhao, J., Einstein, H.H. (2013), "Analysis and prediction of TBM performance in blocky rock conditions at the Lotschberg Base Tunnel", Tunnelling and Underground Space Technology, Vol. 33, pp. 131-142. https://doi.org/10.1016/j.tust.2012.06.015
- Dollinger, G.L., Handewith, J.H., Breeds, C.D. (1998), "Use of punch tests for estimating TBM performance", Tunnelling and underground space technology, Vol. 13, No. 4, pp. 403-408 https://doi.org/10.1016/S0886-7798(98)00083-2
- Farmer, I.W., Glossop, N.H. (1980), "Mechanics of disc cutter penetration". Tunnels Tunnelling, Vol. 12, No. 6, pp. 22-25.
- Ghasemi, E., Yagiz, S., Ataei, M. (2014), "Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic", Engineering Geology and the Environment, Vol. 73, No. 1, pp. 23-35. https://doi.org/10.1007/s10064-013-0497-0
- Gholamnejad, J., Tayarani, N. (2010), "Application of artificial neural networks to the prediction of tunnel boring mahine penetration rate", Mining Science and Technology, Vol. 20, No. 5, pp. 727-733. https://doi.org/10.1016/S1674-5264(09)60271-4
- Gong, Q.M., Zhao J. (2009), "Development of a rock mass characteristics model for TBM penetration rate prediction", Rock Mechanics and Mining Sciences, Vol. 46, No. 1, pp. 8-18. https://doi.org/10.1016/j.ijrmms.2008.03.003
- Gong, Q.M., Zhao J., Jiang Y.S. (2007), "In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels", Tunnelling and Underground Space Technology, Vol. 22, No. 2, pp. 303-316. https://doi.org/10.1016/j.tust.2006.07.003
- Graham, P.C. (1976), "Rock exploration for machine manufacturers". Exploration for Rock Engineering. pp. 173-180.
- Grima, M.A., Bruines, P.A., Verhoef, P.N.W. (2000), "Modelling tunnel boring machine performance by neuro-fuzzy methods", Tunnelling and Underground Space Technology, Vol. 15, No. 3, pp. 259-269. https://doi.org/10.1016/S0886-7798(00)00055-9
- Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J. (2010), "Performance prediction of hard rok TBM using Rock Mass Rating (RMR) system", Tunnelling and Underground Space Technology, Vol. 25, No. 4, pp. 333-345. https://doi.org/10.1016/j.tust.2010.01.008
- Hamilton, W.H., Dollinger, G.L. (1979), "Optimizing tunnel boring machine and cutter design for greater boreability", RETC Proceedings, Vol. 1, pp. 280-296.
- Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A. (2009), "Developing new equations for TBM performance prediction in carbonateargillaceous rocks: a case history of Nowsood Water conveyance tunnel", Geomechanics and Geoengineering, Vol. 4, No. 4, pp. 287-297. https://doi.org/10.1080/17486020903174303
- Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., Tavakoli, H.R. (2010), "TBM performance Analysis in Pyroclastic Rocks: A Case History of Karaj Water Conveyance Tunnel", Geomechanics and Geoengineering, Vol. 43, No. 4, pp. 427-445.
- Hassanpour, J., Rostami, J., Zhao, J. (2011), "A new hard rock TBM performance prediction model for project planning", Vol. 25, No. 5, pp. 595-603.
- Hedayatzadeh, M., Shahriar, K., Hamidi, J.K. (2011), "A fuzzy logic model to predict the performance of hard rock tunnel boring machine", First Asian and 9th Iranian Tunnelling Symposium November 2011 Tehran Iran.
- Hughes, H.M. (1986), "The relative cuttability of coal measures rock", Mining Science and Technology, Vol. 3, No. 2, pp. 95-109. https://doi.org/10.1016/S0167-9031(86)90250-1
- Mahdevari, S., Shahriar, K., Yagiz, S., Shirazi, M.A. (2014), "A support vector regression model for predicting tunnel boring machine penetration rates", Rock Mechanics and Mining Science, Vol. 72, pp. 214-229. https://doi.org/10.1016/j.ijrmms.2014.09.012
- Martins, F.F., Miranda, T.F.S. (2013), "Prediction of hard rock TBM penetration rate based on Data Mining techniques", Proceedings of the 18th international conference on Soil Mechanics and Geotechnical engineering.
- Mobarral, Y., Anbaranil, M.R., Akbaril, E. (2013), "A statistical model for the prediction of TBM penetration rate using rock mass characteristics in the TBM-driven Golab Water Transfer Tunnel".
- Nelson, P., Ingraffea, A.R., O'Rouke, T.D. (1985), "TBM performance prediction using rock fracture parameters", International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts, Vol. 22, No. 3, pp. 189-192
- Nelson, P.P. (1983), "Tunnel boring machine performance in sedimentary rock", Ph.D. Thesis, Cornell University.
- Nelson, P.P. (1993), "TBM performance analysis with reference to rock properties", Comprehensive Rock Engineering, Vol. 4. pp. 261-291.
- Nelson, P.P., Al-Jalil, Y.A., Laughton, C. (1999), "Improved strategies for TBM performance prediction and project management", Rapid Excavation and Tunneling Conference (RETC), pp. 963-979.
- Oraee, K., Khorami, M.T., Hosseini, N. (2012), "Prediction of the penetration rate of TBM using adaptive neuro fuzzy inference system(ANFIS)", Proceeding of SME Annual Meeting and Exhibit, pp. 297-302.
- Ozdemir, L., Miller, R., Wang, F.D. (1978), "Mechanical Tunnel Boring Prediction and Machine Design", Final Project Report to NSF APR73-07776-A03.
- Rostami, J. (1997), "Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure", Ph.D. Thesis, Colorado School of Mines, p. 249.
- Rostami, J., Ozdemir, L. (1993), "A new model for performance prediction of hard rock TBM", Rapid Excavation and Tunnelling Conference, Vol. 50, pp. 793-809.
- Rostami, J., Ozdemir, L., Nilsen, B. (1996), "Comparison between CSM and NTH hard rock TBM performance prediction models", In Proceedings of The Annual Conference of the Institution of Shaft Drilling Technology (ISDT), p. 11.
- Roxborough, F.F., Phillips, H.R. (1975), "Rock excavation by disc cutter", International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. Vol. 12, No. 12, pp. 361-366. https://doi.org/10.1016/0148-9062(75)90547-1
- Salimi, A., Moormann, C., Singh, T.N., Jain, P. (2015), "TBM performance prediction in rock tunneling using various artificial intelligence algorithms", 11th Iranian and 2nd Regional Tunnelling Conference "Tunnels and the Future".
- Sanio, H.P. (1985), "Prediction of the performance of disc cutters in anisotropic rock". International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. Vol. 22, No. 3, pp. 153-161. https://doi.org/10.1016/0148-9062(85)93229-2
- Sato, K., Gong, F., Itakura, K. (1991), "Prediction of disc cutter performance using a circular rock cutting ring". The first International Mine Mechanization and Automation Symposium.
- Snowdon, R.A., Ryley, M.D., Temporal, J. (1982), "A study of disc cutting in selected British rocks", International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts, Vol. 19, No. 3, pp. 107-121. https://doi.org/10.1016/0148-9062(82)91151-2
- Sundin, N.O., Wanstedt, S. (1994), "A boreability model for TBM's", In 1st North American Rock Mechanics Symposium, American Rock Mechanics Association, pp. 311-318.
- Tarkoy, P.J. (1973), "Predicting TBM penetration rates in selected rock types", 9th Canadian Rock Mechanics Symposium,
- Wijk, G. (1992), "A model of tunnel boring machine performance", Geotechnical and Geological Engineering, Vol. 10, No. 1, pp. 19-40. https://doi.org/10.1007/BF00881969
- Yagiz, S. (2002), "Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM model basic penetration for hard rock tunneling machines", Doctoral Dissertation, Department of Mining and Earth Systems Engineering, Colorado School of Mines, p. 289.
- Yagiz, S. (2006), "TBM performance prediction based on rock properties", Proceedings of Multiphysics Coupling and Long Term Behavior in Rock Mechanics, EUROCK, Vol. 6, pp. 663-670.
- Yagiz, S. (2008), "Utilizing rock mass properties for predicting TBM performance in hard rock condition", Tunnelling and Underground Space Technology, Vol. 23, No. 3, pp. 326-339. https://doi.org/10.1016/j.tust.2007.04.011
- Yagiz, S., Gokceoglu, C., Sezer, E., Iplikci, S. (2009), "Application of two non-linear prediction tools to the estimation of tunnel boring machine performance", Engineering Application of Artificial Intelligence, Vol. 22, No. 4, pp. 808-814. https://doi.org/10.1016/j.engappai.2009.03.007
- Yagiz, S., Karahan, H. (2011), "Prediction of hard rock TBM penetration rate using particle swarm optimization", Rock Mechanics and Mining Science, Vol. 48, No. 3, pp. 427-433. https://doi.org/10.1016/j.ijrmms.2011.02.013
- Yagiz, S., Karahan, H. (2015), "Application of various optimization techniques and comparison of their performances for predicting TBM penetration rate in rock mass", Rock Mechanics and Mining Science, Vol. 83, pp. 308-315.
- Yagiz, S., Yagiz, A. (2006), "A model for the prediction of tunnel boring machine performane", In Proceedings of 10th IAEG Congress, pp. 1-10.
- Zhao, Z., Gong, Q.M., Zhang, Y., Zhao, J. (2007), "Prediction model of tunnel boring machine performance by ensemble neural networks", Geomechanics and Geoengineering, Vol. 2, No. 2, pp. 123-128. https://doi.org/10.1080/17486020701377140