참고문헌
- Carrasco, J., Alptekin, S.E. and Krumme, L., Mixed Integer Programming Applied to Atepper Scheduling, Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, 1999, pp. 62-66.
- Chang, S., Pai, P., Yuan, K., Wang, B., and Li, R., Heuristic PAC Model from Hybrid MTO and MTS Production Environment, International Journal of Production Economics, 2003, Vol. 85, pp. 347-358. https://doi.org/10.1016/S0925-5273(03)00121-X
- Choi, S.W., Scheduling Algorithms for Minimizing Total Weighted Flowtime in Photolithography Workstation of FAB, Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, No. 1, pp. 79-86.
- Glassey, C.R. and Resende, M.G.C., A Scheduling Rule for Job Release in Demiconductor Fabrication, Operations Research Letters, 1998b, Vol. 7, pp. 213-217.
- Glassey, C.R. and Resende, M.G.C., Closed-loop Job Release Control for VLSI Circuit Manufacturing, IEEE Transactions on Semiconductor Manufacturing, 1998a, Vol. 1, No. 1, pp. 36-46.
- Kang, K.H. and Lee, Y.H., Make-to-order Scheduling in Foundry Semiconductor Fabrication, International Journal of Production Research, 2007, Vol. 45, No. 3, pp. 615-630. https://doi.org/10.1080/00207540600792416
- Kim, C.H., Determination of optimal production lot size when a production system is under constant surveillance, Journal of the Korean Institute of Plant Engineering, 2013, Vol. 18, No. 1, pp. 19-26.
- Kim, S., Yea, S.H., and Kim, B., Shift Scheduling for Stepper in the Semiconductor Wafer Fabrication Process, IIE Transactions, 2002, Vol. 34, pp. 167-177.
- Kim, S.H., Kim, J.W., and Lee, Y.H., Simulation-Based Optimal Production Planning Model Using Dynamic Lead Time Estimation, International Journal of Advanced Manufacturing Technology, 2014, Vol. 75, pp. 1381-1391. https://doi.org/10.1007/s00170-014-6209-5
- Leachman R.C., Kang, J.Y., and Lin, V., SLIM : Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics, Interfaces, 2002, Vol. 32, pp. 61-77. https://doi.org/10.1287/inte.32.1.61.15
- Lee, Y.H. and Kim, J.W., Daily Stepper Scheduling Rule in the Semiconductor Manufacturing for MTO Products, International Journal of Advanced Manufacturing Technology, 2011, Vol. 54, No. 1-4, pp. 323-336. https://doi.org/10.1007/s00170-010-2934-6
- Lee, Y.H. and Kim, T., Manufacturing Cycle Time Reduction Using Balance Control in the Semiconductor Fabrication Line, Production Planning and Control, 2001, Vol. 13, pp. 529-540.
- Lee, Y.H., Cho, H.M., Park, J.K., and Lee, B.K., Scheduling Simulator for Semiconductor Fabrication Line, IE Interfaces, 1999, Vol. 12, No. 3, pp. 437-447.
- Lee, Y.H., Park, J., and Kim, S., Experimental Study on Input and Bttleneck Scheduling for the Semicon ductor Fabrication line, IIE Transactions, 2001, Vol. 34, Issue. 2, pp. 179-190.
- Sigrid L.N. and Kai, A.O., Optimal and Heuristic Solutions for a Scheduling Problem Arising in an Foundry, Computer and Operations Research, 2005, Vol. 32, pp. 2351-2382. https://doi.org/10.1016/j.cor.2004.03.007
- Spearman, M.L., Woodruff, D.L., and Hopp, W.J., CONWIP : A Pull Alternative to Kanban, International Journal of Prouction Research, 1990, Vol. 28, No. 5, pp. 879-894. https://doi.org/10.1080/00207549008942761
- Wein, L.M., Shceduing Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1998, Vol. 1, No. 3, pp. 115-129.
피인용 문헌
- 다수의 인공위성-지상국 간 통신 스케줄 최적화 모형 vol.41, pp.1, 2016, https://doi.org/10.11627/jkise.2018.41.1.039
- Operation Scheduling in a Commercial Building with Chiller System and Energy Storage System for a Demand Response Market vol.19, pp.8, 2016, https://doi.org/10.5762/kais.2018.19.8.312
- 디스플레이 FAB 생산능력 예측 개선 사례 연구 vol.43, pp.2, 2016, https://doi.org/10.11627/jkise.2020.43.2.137