열차운영 시뮬레이션과 관련 프로그램 (SW) 현황

  • 김경민 (한국철도기술연구원 철도시스템운영연구팀)
  • 발행 : 2016.02.29

초록

키워드

참고문헌

  1. Hans Sipila(2015), "Simulation of rail traffic-Methods for timetable construction, delay modeling and infrastructure evaluation," KTH Royal Institute of Technology, PhD Thesis.
  2. M. Abril et al.(2007), "An assessment of railway capacity," Transportation Research Part E 44, pp. 774-806.
  3. A. Gille, M. Klemenz, T. Siefer(2008), "Applying multiscaling analysis to detect capacity resources in railway networks," Computers in Railways XI: Proceedings of Comprail 2008, WIT Press, Toledo, Spain.
  4. H. Koutsopoulos, Z. Wang(2007), "Simulation of urban rail operations: application framework," Transportation Research Record: Journal of the Transportation Research Board, 84-91.
  5. V.M. Kantamaa, H. Maenpaa, J.P. Pitkanen(2013), "Simulation as a planning tool for Helsinki railway station yard layout," Report Signal + Draht 10, 55-60.
  6. Sogin et al. (2011), "Simulating the effects of higher speed passenger trains in single-track freight networks," Proceedings of the 2011 Winter Simulation Conference, Phoenix, USA.
  7. O. Brunger(1996), "Konzeption einer Rechnerunterstutzung fur die Feinkonstruktion von Eisenbahnfahrplanen," RWTH Aachen, PhD Thesis.
  8. http://www.via-con.de/en
  9. http://www.berkeleysimulation.com
  10. http://www.rmcon.de/
  11. http://www.opentrack.ch/