DOI QR코드

DOI QR Code

Investigation of jack-up leg extension for deep water operations

  • Welaya, Yousri M.A. (Department of Naval Architecture and Marine Engineering, Alexandria University) ;
  • Elhewy, Ahmed (Department of Naval Architecture and Marine Engineering, Alexandria University) ;
  • Hegazy, Mohamed (Deepwater Drilling & Services PVT. Ltd.)
  • Published : 2015.03.31

Abstract

Since the first jack-up was built, jackups have become the most popular type of mobile offshore drilling unit (MODU) for offshore exploration and development purposes in shallow water. The most pivotal component of the jack-up unit is the leg, which can directly affect the global performance of the unit. In this paper, an investigation into extending the length of the jack up leg is carried out in order to study the enhancement of the rig capability to drill in deeper water approaching the range of the Semisubmersible Drilling Unit (SSDU) (300-1000ft). A study of the performance of a deep-water jack-up unit is performed with different leg lengths. Typical leg scantling dimensions and identical external loads are assigned, and then a detailed Finite Element Analysis (FEA) model is created in order to simulate the jack-up leg unit's structural behavior. A Multi-point Constraint (MPC) element together with the spring element is used to deal with the boundary conditions. Finally, a comparative analysis for five leg lengths is carried out to illustrate their performance, including the ultimate static strength, and weight.

Keywords

References

  1. Arockiasamy, M. and Reddy, D.V., 1991. Offshore structures, volume 1, center of marine structures & geo techniques, department of ocean engineering, Florida Atlantic university. FL: KRIEGER Publishing Company.
  2. American Petroleum Institute (API), 2000. Recommended practice for planning, designing and constructing fixed offshore platform-working stress design. 21 Edition. Washington: API recommended practice 2A-WSD.
  3. Bennett Offshore and Offshore Technology, Inc. (Keppel FELS). 2005. A technical primer for the offshore industry professional. U.S.: Bennett & Associates L.L.C and Singapore: Offshore Technology Development INC.
  4. Childers, M.A., 1989. Operational efficiency comparison between a deepwater jackup and a semisubmersible in the gulf of Mexico. The SPE/IADC Drilling Conference, New Orleans, Louisiana, 28 February-3 March 1989.
  5. Clauss, G., Lehmann, E. and Ostergaard, C. 1992. Offshore structures, volume I, conceptual design and hydrodynamics. New York: Springer-Verlag.
  6. Elosta, H., 2009. Offshore jack up reliability. M.Sc. Thesis. Alexandria University, Egypt.
  7. International Association of Classification Societies (IACS), 2012. Requirements concerning mobile offshore drilling units. rev.5. U.K.: IACS.
  8. Hegazy, M.M., 2013. Jack-up rig modification for deep water operation, M.Sc. Thesis. Alexandria University.
  9. PAFA Consulting Engineers, 2001. Impact on water depth operating limits of reduced SNAME T&R Bulletin 5-5A environmental load factor ${\gamma}_3$ from 1.25 to 1.15. HSE, Offshore Technology Report. U.K.: PAFA Consulting Engineers.
  10. Paik, J.K. and Thayamballi, A.K., 2007. Ship-shaped offshore installations design, building, and operation. Cambridge: Cambridge University Press.
  11. Shabakhty, N., 2004. Durable reliability of jack-up platforms. The Impact of Fatigue, Fracture and Effect of Extreme Environmental Loads on the Structural Reliability. Ph.D. thesis, Delft University of Technology. Netherlands.
  12. Skjong, R., Gregersen, E.B., Cramer, E., Croker, A., Hangen, O., Korneliussen, G., Lacasse, S., Lotsberg, I., Nadim F. and Ronold, K.O., 1995. Guideline for offshore structural reliability analysis- general, DNV: 95-2018. Hovik: DNV.
  13. Winkworth, W.J., 2001. Strength analysis of mobile offshore units. U.K.: Lloyd's Register of Shipping.