References
- Cho, Y. S. and Cha, H. S., (2010). "A Study of Project Characteristics and Project Performance Level of Difficulty", Korean journal of Construction Engineering and Management, KICEM, 11(6), pp. 78-88. https://doi.org/10.6106/KJCEM.2010.11.6.78
- Fernane, J. D., (2011). "Comparison of design-build and design-bid-build performance of public university, Master Degree", M.S. Thesis, University of Nevada, Las Vegas, U.S.A.
- Gordon, C. M., (1994). "Choosing Appropriate Construction Contracting Method", J. Constr. Eng. Manage., 120, pp. 196-210. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(196)
- Hale, D. R., Shrestha, P. P., Gibson, E. and Migliaccio, G. C., (2009). "Empirical Coomparison of Design/Build and design/Bid/Build Project Delivery Methods", Journal of Construction Engineering and Management, 35, pp. 579-587.
- Ibbs, C. W., Kwak, Y., Ng, T. and Odabase, A. M., (2003). "Project Delivery Systems and Project Change: Quantitative Analysis", Journal of Construction Engineering and Management, 129, pp. 382-387. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(382)
- Jun, H. C. (2007). "A Study on Analyzing Current State of Contract & Change Order by Awarding Method in Public Construction Projects", M.S. Thesis, Hanyang University, Seoul, South Korea.
- Kim, G. S. (2010). "Structural Equation Modeling Analysis", Hannarae Publishing Co., Seoul, Korea.
- Kim, S. G. (2006). "Analysis on the Problems and Studies of the Improvement Plans Accompanied by the Design Change in Turn-key Project", M.S. Thesis, Gyeongsang National University, Korea.
- Konchar, M. and Sanvido, V., (1998). "Comparison of U.S.Project Delivery Systems", Journal of construction Engineering and Management, 124, pp. 435-444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435)
- Lee, E. J., Kim, K. H., Lee, Y. S. and Kim, J. J., (2007). "A Study on the Proposal of Post-Evaluation Model Through Improvement of Post-Evaluation Indicators in the Public Construction", Journal of the Architectural Institute of Korea Structure & Consturction, 23(12), pp. 133-140.
- Lee, H. S., Ji, S. H., Park, M. and Song, S. H., (2007). "Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dydnamics Modeling", Korean journal of Construction Engineering and Management, KICEM, 8(5), pp. 119-131.
- Lee, M. J., Park, B. J. and Im, K. S., (2008). "A Study on the Estimation of Change Orders Impact for the Public Construction", Journal of the Korean Society of Civil Engineers, KSCE, 28(3D), pp. 363-369
- Lee, S. B. and Hwang, J. W. (2007). "A Study on the Causes Analysis of Change Order Claims in Design-Build", Journal of the Architectural Institute of Korea, 9(2), pp. 247-254.
- Lee, Y. S. (2013). "Suggestions for Improvement of Construction Project Awarding Methods in Public Sector", Korea Research Institute for Human Settlements, KRIHS, Construction Economy Articles(Winter), 75, pp. 43-54.
- Lee, Y. S., Kang, T. K., Shin, E. Y. and Park, W., (2013). "Comparison of Cost Performance for Delivery Methods on Public Construction Projects", Journal of the korean Society of Civil Engineers, KSCE, 33(6), pp. 2575-2582. https://doi.org/10.12652/Ksce.2013.33.6.2575
- Lee, Y. D. (2012). "A Study on Hybrid Approach of Deductive Case Analysis and AHP to Explore Change Orders in Construction Projects", M.S. Thesis, Hanyang University, Seoul, Korea.
- Lim, P. J. (2014). "A Study on the Difference Analysis of Construction Performance Results according to Successful Bid Selection Systems" M.S. Thesis, Chung-Ang University, Seoul, Korea.
- Ministry of government legislation (2015). Act on contracts to which the state is a party, Ministry of Strategy and Finance, Korea.
- Ministry of government legislation (2015). Construction contract general conditions, Administrative rule, Ministry of Strategy and Finance, Korea.
- Perkins, R. A., (2009). "Sources of Changes in Design.Build Contracts for a Governmental Owner", Journal of Construction Engineering and Management, 135, pp. 588-593. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:7(588)
- Riley, D. R., Diller, B. E. and Kerr, D., (2005). "Effects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction", Journal of Construction Engineering and Management, 131, pp. 953-962. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(953)
- Ryou, S. S., (2010). "Analysis on the Claim Factors for Change Order of Turn-key Project", M.S. Thesis, Korea University, Seoul, Korea.
- Sung, J.Y., (2015). "An Analysis of Changing Construction Contract and Construction Defects Due to Bidding-Ratio in Lowest Bidding System", M.S. Thesis, Seoul National University, Seoul, Korea.
- The Seoul Institute, (2013). "A Research for Evaluating the Performance of Design-Build Delivery Method of Seoul City", R&D Report, Seoul Metropolitan Government, Korea.
- University of Seoul, (2006). "A Research for Evaluating the Performance of Design-Build Delivery Method", Construction & Transportation R&D Report, Ministry of Land, Infrastructure and Transport, Korea.
- Yoon, B. H. (2009). "Risk Assessment of Cost Increasing by Change Orders of Road Projects", M. S. Thesis, Yonsei University, Seoul, Korea.