References
- Kang, T., & Park, C. (2004). Indirect labor cost estimation system in the public building projects, Journal of the Architectural Institute of Korea, Structure & Construction Section, 20(5), 121-128.
- Song, K., Jung, E., & Im, C. (2006). A Study on the correlation analysis of the item of expenditure using ISM method, Journal of the Architectural Institute of Korea, Structure & Construction Section, 22(5), 153-160.
- Lee, H., Lee, E., & Kim, Y. (2013), Time series analysis and forecast for labor cost of actual cost data, Korean Journal of Construction Engineering and Management, 14(4), 24-34. https://doi.org/10.6106/KJCEM.2013.14.4.024
- Yim, J., Park, J., & Kim, O. (2014). Presumption method for optimum correction rate of total construction cost using the median based on historical data analysis in public office buildings, Journal of the Korea Institute of Buliding Construction, 14(5), 415-210. https://doi.org/10.5345/JKIBC.2014.14.5.415
- Jung, S., & Lee, H. (2001). A study on the method of estimating indirect labor cost rate using the analysis of cost items in complete works, Korean Journal of Construction Engineering and Management, 2(2), 81-89.
- Becker, T. C., Jaselskis, E. J., & El-Gafy, M. (2014). Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs, Journal of Construction Engineering and Management, ASCE, 140(6).
- Ji, S. H., Park, M., & Lee, H. S., (2010). Data Preprocessing- Based Parametric Cost Model for Building Projects: Case Studies of Korean Construction Projects, Journal of Construction Engineering and Management, ASCE, 136(8), 844-853. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000197