Abstract
The pressure penetrating steel pipe pile method which can be constructed in a narrow space using the hydraulic jack is used on the foundation reinforcement, extension of the structure and basement, restoration of the differential settlement etc.. This method is possible to construct in narrow areas and low story height, the non-noise and non-vibration works, and it is possible for the construction site to be clean without slime. And it is possible to confirm the bearing capacity of pile due to penetrating the pile with the compression load of hydraulic jack. In this study, the static load test with the load-transfer test was carried out to investigate the bearing behavior characteristics of the pressure penetrating steel pipe pile. Four series of static load test were executed to investigate the variation of bearing behavior of the pressure penetrating steel pipe pile. As a result of these tests, the allowable load of the pressure penetrating steel pipe was evaluated more than 637 kN, and the shaft resistance corresponding to 81~86% of each applied load was mobilized with only a small portion of the base resistance acting. And it was also evaluated that the unit skin friction was mobilized to maximum value after two months.
압입강관말뚝공법은 기초보강, 상부 및 지하 증축, 부등침하 복원 등에 사용되는 공법으로 유압잭을 이용하여 좁은 공간에서 시공이 가능한 기초 보강공법이다. 이 공법의 특징은 협소한 공간, 낮은 층고, 근접 시공이 가능하고, 무소음 및 무진동 공법이며 슬라임을 배출하지 않아서 시공현장을 청결하게 유지할 수 있다. 또한 모든 말뚝을 유압잭의 압입하중으로 시공하므로 시공 중 지지력 확인이 가능하다. 본 연구에서는 압입강관말뚝에 대하여 하중전이시험을 수반한 말뚝 정재하시험을 수행하여 압입강관말뚝의 하중지지 거동 특성을 파악하였다. 그리고 말뚝 시공 후 경과시간에 따른 압입강관말뚝의 지지거동의 변화를 확인하기 위하여 총 4회의 정재하시험을 실시하였다. 재하시험 결과, 압입강과말뚝의 허용지지력은 최소 637kN 이상으로 나타났고, 재하하중의 81~86%를 마찰하중이 지지하는 것으로 나타났다. 그리고 대체적으로 2개월이 경과하면 단위주면마찰력은 최대값에 도달하는 것으로 평가되었다.