Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun (Dept. of Architectural Engineering, Catholic Kwandong University)
  • Received : 2015.01.16
  • Accepted : 2015.02.06
  • Published : 2015.06.20

Abstract

A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

Keywords

References

  1. Lee JB. Construction automation and robotics: today and tomorrow. Review of Architecture and Building Science. 2007 Jun;51(6):25-7.
  2. Kim TH, Lee UK, Yoo WS, An SH, Cho HH, Lee YH, Doh NJ. Benefit/cost analysis of a robot-based construction automation system. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 616-21.
  3. Tanijiri H, Ishiguro B, Arai T, Yoshitake R, Kato M, Morishima Y, Takasaki N. Development of automated weather-unaffected building construction system. Automation in Construction. 1997 Jun;6(3):215-27. https://doi.org/10.1016/S0926-5805(97)00005-8
  4. Yamazaki Y, Maeda J. The SMART system: an integrated application of automation and information technology in production process. Computers in Industry. 1998 Feb;35(1):87-99. https://doi.org/10.1016/S0166-3615(97)00086-9
  5. Ikeda Y, Harada T. The automated building construction system for high-rise steel structure buildings. Proceeding of the Council on Tall Buildings and Urban Habitat (CTBUH); 2004 Oct 10-13; Seoul, South Korea. Seoul(Korea): Council on Tall Buildings and Urban Habitat; 2004. p. 707-13.
  6. Wakisaka T, Furuya N, Inoue Y, Shiokawam T. Automated construction system for high-rise reinforced concrete buildings. Automation in Construction. 2000 May;9(3):229-50. https://doi.org/10.1016/S0926-5805(99)00039-4
  7. Kang TK, Nam C, Lee UK, Doh NL, Park GT. Development of robotic crane-based automatic construction system for steel structures of high-rise buildings. Proceedings of the 28th International Symposium of Automation and Robotics in Construction; 2011 Jun 29-Jul 2; Seoul, Korea. (Korea): International Symposium of Automation and Robotics in Construction; 2011. p. 670-1
  8. Park GT, et al. Robot based construction automation system, Final report. Seoul: Research center for construction automation (South Korea); 2011 Oct. 527p. Report No.:06-UACTP-D01.
  9. Lee G, Kim HH, Lee CJ, Ham SI, Yun SH, Cho HH, Kim BK, Kim GT, Kim K. A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction. 2009 Nov; 18(7):865-74. https://doi.org/10.1016/j.autcon.2009.03.011
  10. Jin IG, Shin YS, Cho HH, Kang KI. Development of component design process for automated construction system. Korean journal of construction engineering and management. 2009 Jul;10(4):76-86.
  11. Kim DI, Cho HH. Safety and productivity analysis on alternative steel column-girder joint for automated construction. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 2338-41.
  12. Chu BS, Jung KM, Ko KH, Hong DH. Mechanism and analysis of a robotic bolting device for steel beam assembly. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 2351-56.
  13. Halpin DW, Riggs LS. Planning and analysis of construction operations. New York: Wiley; 1992.
  14. Han SW. Productivity analysis comparison of different types of earthmoving operations by means of various productivity measurements. Journal of Asian Architecture and Building Engineering. 2010; 9(1):185-92. https://doi.org/10.3130/jaabe.9.185
  15. Lee UK. Development of decision support model for scheduling construction automation system. Korean National Science and Foundation. Research report (D00314): 2011. Seoul, Korea.
  16. Cho KM. Integrated schedule and cost management model for repetitive construction process of high-rise building [Ph.D. dissertation]. [Seoul(Korea)]: University of Seoul; 2009. 207 p.
  17. Hong TH, Cho KM, Hyun CT, Han SW. Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management. 2011 Jun;137(6):393-402. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000300
  18. AbouRizk, S, Halpin, D, Wilson, J. Fitting beta distributions based on sample data. Journal of Construction Engineering and Management. 1994 Jun;120(2):288-305. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(288)
  19. Korea Institute of Construction Technology. (2010). Standard quantities per unit of construction projects in Korea, Seoul, Korea.
  20. Lee UK, Yoo WS, An SH, Doh N, Cho HH, Jun CH, Kim TH, Lee YH. Performance assessment model for robot-based automated construction systems. Journal of the Korea Institute of Building Construction. 2013 Aug;13(4):416-23. https://doi.org/10.5345/JKIBC.2013.13.4.416
  21. Seoul Metropolitan City. Special specifications for steel construction. Seoul Metropolitan City Press, Seoul, Korea. 2008.
  22. Lee UK. An advanced safety control system for building construction based on wireless sensor networks [Ph.D. dissertation]. [Seoul(Korea)]: Korea University; 2008. 129 p.
  23. Heinrich H. Industrial Accident Prevention: a Scientific Approach. 3rd ed. New York: McGraw-Hill; 1950.
  24. Lee UK, Kim JH, Cho HH, Kang KI. Development of a mobile safety monitoring system for construction sites. Automation in Construction. 2009 May;18(3):258-64. https://doi.org/10.1016/j.autcon.2008.08.002
  25. Toole TM. Construction site safety roles. Journal of Construction Engineering and Management. 2002 Jun;128(3):203-10. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(203)
  26. Korea Occupational Safety and Health Agency. Standard Safety Specifications for Steel Construction, Seoul, Korea. 2009.