References
- Lee JB. Construction automation and robotics: today and tomorrow. Review of Architecture and Building Science. 2007 Jun;51(6):25-7.
- Kim TH, Lee UK, Yoo WS, An SH, Cho HH, Lee YH, Doh NJ. Benefit/cost analysis of a robot-based construction automation system. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 616-21.
- Tanijiri H, Ishiguro B, Arai T, Yoshitake R, Kato M, Morishima Y, Takasaki N. Development of automated weather-unaffected building construction system. Automation in Construction. 1997 Jun;6(3):215-27. https://doi.org/10.1016/S0926-5805(97)00005-8
- Yamazaki Y, Maeda J. The SMART system: an integrated application of automation and information technology in production process. Computers in Industry. 1998 Feb;35(1):87-99. https://doi.org/10.1016/S0166-3615(97)00086-9
- Ikeda Y, Harada T. The automated building construction system for high-rise steel structure buildings. Proceeding of the Council on Tall Buildings and Urban Habitat (CTBUH); 2004 Oct 10-13; Seoul, South Korea. Seoul(Korea): Council on Tall Buildings and Urban Habitat; 2004. p. 707-13.
- Wakisaka T, Furuya N, Inoue Y, Shiokawam T. Automated construction system for high-rise reinforced concrete buildings. Automation in Construction. 2000 May;9(3):229-50. https://doi.org/10.1016/S0926-5805(99)00039-4
- Kang TK, Nam C, Lee UK, Doh NL, Park GT. Development of robotic crane-based automatic construction system for steel structures of high-rise buildings. Proceedings of the 28th International Symposium of Automation and Robotics in Construction; 2011 Jun 29-Jul 2; Seoul, Korea. (Korea): International Symposium of Automation and Robotics in Construction; 2011. p. 670-1
- Park GT, et al. Robot based construction automation system, Final report. Seoul: Research center for construction automation (South Korea); 2011 Oct. 527p. Report No.:06-UACTP-D01.
- Lee G, Kim HH, Lee CJ, Ham SI, Yun SH, Cho HH, Kim BK, Kim GT, Kim K. A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction. 2009 Nov; 18(7):865-74. https://doi.org/10.1016/j.autcon.2009.03.011
- Jin IG, Shin YS, Cho HH, Kang KI. Development of component design process for automated construction system. Korean journal of construction engineering and management. 2009 Jul;10(4):76-86.
- Kim DI, Cho HH. Safety and productivity analysis on alternative steel column-girder joint for automated construction. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 2338-41.
- Chu BS, Jung KM, Ko KH, Hong DH. Mechanism and analysis of a robotic bolting device for steel beam assembly. Proceeding of 10th International Conference on Control, Automation and systems; 2010 Oct 27-30; Gyeonggi-do, Korea. Seoul (Korea): Institute of Control, Robotics, and Systems; 2010. p. 2351-56.
- Halpin DW, Riggs LS. Planning and analysis of construction operations. New York: Wiley; 1992.
- Han SW. Productivity analysis comparison of different types of earthmoving operations by means of various productivity measurements. Journal of Asian Architecture and Building Engineering. 2010; 9(1):185-92. https://doi.org/10.3130/jaabe.9.185
- Lee UK. Development of decision support model for scheduling construction automation system. Korean National Science and Foundation. Research report (D00314): 2011. Seoul, Korea.
- Cho KM. Integrated schedule and cost management model for repetitive construction process of high-rise building [Ph.D. dissertation]. [Seoul(Korea)]: University of Seoul; 2009. 207 p.
- Hong TH, Cho KM, Hyun CT, Han SW. Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management. 2011 Jun;137(6):393-402. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000300
- AbouRizk, S, Halpin, D, Wilson, J. Fitting beta distributions based on sample data. Journal of Construction Engineering and Management. 1994 Jun;120(2):288-305. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(288)
- Korea Institute of Construction Technology. (2010). Standard quantities per unit of construction projects in Korea, Seoul, Korea.
- Lee UK, Yoo WS, An SH, Doh N, Cho HH, Jun CH, Kim TH, Lee YH. Performance assessment model for robot-based automated construction systems. Journal of the Korea Institute of Building Construction. 2013 Aug;13(4):416-23. https://doi.org/10.5345/JKIBC.2013.13.4.416
- Seoul Metropolitan City. Special specifications for steel construction. Seoul Metropolitan City Press, Seoul, Korea. 2008.
- Lee UK. An advanced safety control system for building construction based on wireless sensor networks [Ph.D. dissertation]. [Seoul(Korea)]: Korea University; 2008. 129 p.
- Heinrich H. Industrial Accident Prevention: a Scientific Approach. 3rd ed. New York: McGraw-Hill; 1950.
- Lee UK, Kim JH, Cho HH, Kang KI. Development of a mobile safety monitoring system for construction sites. Automation in Construction. 2009 May;18(3):258-64. https://doi.org/10.1016/j.autcon.2008.08.002
- Toole TM. Construction site safety roles. Journal of Construction Engineering and Management. 2002 Jun;128(3):203-10. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(203)
- Korea Occupational Safety and Health Agency. Standard Safety Specifications for Steel Construction, Seoul, Korea. 2009.