참고문헌
- A. Omran, M. A. Abdulbagei, and A. O. Gebreil, "An Evaluation of the Critical Success Factors for Construction Projects in Libya", Journal of Economic Behaviour, vol. 2, pp. 17-25, 2012.
- S. I. J. Onwusonye, "Project planning in the construction industry (theory and practice)", Intercontinental Educational books and Publishers, Owerri, 2005.
- S. Fu Chi, S. Yen-Chi, and L. Yu-Cheng, "Interface Management Practices in Taiwan Construction Projects", Journal of Construction Engineering and Management, 27(5), pp. 947-952, 2010.
- O. F. Okebugwu, "Quantitative Approaches to Project Interfaces Management", M.Sc. Thesis, Federal University of Technology, Owerri, Nigeria, 2014.
- M. M. Mortaheb, and M. Rahimi, and S. Zardynezhad, "Interface Management in Mega Oil Refinery Projects", Proceedings of 6th International Project Management Conference, Tehran, Iran, October 26-27, 2010.
- D. Antoniadis, "Project Interfaces", Thomas Telford, London, 2010
- Q. Chen, G. Reichard, and Y. Beliveau, "Multi-perspective Approach to exploring comprehensive cause factors for interface issues", Journal of Construction Engineering and Management, Vol. 134(6), pp. 432-441, 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(432)
- T. Crumrine, R. Nelson, C. Codeiro, M. Loudermilk, Mabiel, & A. Christopher, (2005), "Interface management for sea sand control completion", Offshore, vol. 65 issue 10, pg 88, 2005.
- D. K. H. Chua, M. "Godinot, Use of a WBS Matrix to Improve Interface Management in Projects", Journal of Construction Engineering and Management, pp. 132(1), 67-79, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67)
- W. Ibbs, L. D. Nguyen, and S. Lee, "Quantified Impacts of Project Change", Journal of Professional Issues in Engineering Education and Practice, ASCE, Vol. 133, No. 1, pp. 45-52, 2007. https://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(45)
- G. Sweis, R. Sweis, A. Abu Hammad, A. Shaboul, "Delays in Construction Projects: The Case of Jordan", International Journal of Project Management, 2007, vol. 26, pp 665-674, 2007.
- A. Al-Hammad, and S. Assaf, "Design-Construction Interface Problems in Saudi Arabia", Building Research and Information, Vol. 21, No.1, pp 60-63, 1992.
- A. Al-Hammad, "Factors Affecting the Relationship between Contractors and their Sub-Contractors in Saudi Arabia". Journal of Performance of Construction Facilities, ASCE, Vol. 21, No. 5, pp-194-205, 1993.
- J. Hinze, and T. Andres, "The Contractor-Subcontractor Relationship: The Subcontractor's View", Journal of Construction Engineering and Management, ASCE, Vol. 120, No. 2, pp. 274-287, 1994. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(274)
- R. Portela, "Maritime casualties Analysis as a tool to improve research about human factors on maritime environment", Journal of Maritime Research, vol. 11, No 2, pg 3-18, 2005.
- S. Durdyev, I. Syuhaida, & A. Noah, "Factors causing cost overruns in construction of residential projects; case study of Turkey", International Journal of Science and Management, 1(1): 3-12, 2012.
- A. A. Taiwo, and J. A. Afolabi, "Incessant building collapse: A case of a hotel in Akure Nigeria", Journal of Building Appraisal, vol. 6, pp 241-248, 2011. https://doi.org/10.1057/jba.2011.1
- E. O. P. Akpan, & O. Igwe, "A Methodology for Determining Price Variation in Project Execution", Journal of Construction Engineering & Management of the American Society of Civil Engineers (ASCE), 127(5):367-373, 2011.