참고문헌
- A. Elhakeem, T. Hegazy. Improving deterioration modeling using optimized transition probability matrices for markov chains. Proceedings of the 84th Transportation Research Board Annual Meeting, TRB, Washington, D.C., USA, 2005.
- A. H. Boussabaine, The use of artificial neural networks in construction management: A review." Construction Management and Economics. 14, pp.427-436, 1996. https://doi.org/10.1080/014461996373296
- B. Bramble, M. Callahan, Construction Delay Claims, Aspen Publishers, USA, 2010.
- B. Shapiro, Construction Claims and Contracting Strategies, Shapiro Hankinson & Knutson and Revay & Associates Joint Seminar, Vancouver, 2004.
- C. Sun, J. Xu, Estimation of time for Wenchuan earthquake reconstruction in China, Journal of Construction Engineering and Management, 137, pp.179-187, 2011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000277
- D. Arditi, O. Tokdemir, Comparison of case-based reasoning and artificial neural networks. Journal of Computating in Civil Engineering. 13, pp.162-169, 1999. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:3(162)
- D. K. H. Chua, D. Z. Li, W. T. Chan, Case-based reasoning approach in bid decision making, Journal of Construction Engineering and Management, 127, pp.35-45, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(35)
- D. K. H. Chua, Y. C. Kog, P. K. Loh, E. J. Jaselskis, Model for construction budget performance-Neural network approach, Journal of Construction Engineering and Management, 123, pp.214-222, 1997. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(214)
- E. Fisk, Construction Project Administration, 8th Edition, Prentice Hall, 2005.
- J. E. Diekmann, M. Girard, Are contract disputes predictable? Journal of Construction Engineering and Management, 121, pp.355-363, 1995. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(355)
- J. L. Kolodner, An introduction to case-based reasoning, Artificial Intelligence Review, 6, pp.3-34, 1992. https://doi.org/10.1007/BF00155578
- J.E. Diekmann, T.A Kruppenbacher, Claims analysis and computer reasoning, Journal of Construction Engineering and Management, 110, pp.391-408, 1984. https://doi.org/10.1061/(ASCE)0733-9364(1984)110:4(391)
- J.H. Moore, L.R. Weatherford, Decision Modeling with Microsoft Excel, 6th Edition, Prentice Hall, New Jersey, 2001.
- K. D. Ashley, E. L. Rissland, A case-based approach to modeling legal expertise. IEEE Expert, 3, pp.70-77, 1988. https://doi.org/10.1109/64.21892
- K. D. Ashley, Modeling legal argument: Reasoning with cases and hypotheticals. MIT Press, Cambridge, Mass, 1990.
- K. Mohamed, S. Khoury, S. Hafez, Contractor's decision for bid profit reduction within opportunistic bidding behavior of claims recovery, International Journal of Project Management, 29, pp.93-107, 2011. https://doi.org/10.1016/j.ijproman.2009.12.003
- K. W. Chau, Application of a PSO-based neural network in analysis of outcomes of construction claims, Automation in Construction, 16 (5), pp.642-646, 2007. https://doi.org/10.1016/j.autcon.2006.11.008
- M. Allen, T. Bench-Capon, G. Staniford, A multi agent legal argument generator, Proc., 11th International Workshop on Database and Expert Systems Application, IEEE Computer Society, Washington, D.C. pp.1074-1084, 2000.
- M. Attalla, T. Hegazy, Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression, Journal of Construction Engineering and Management. 129, pp.405-411, 2003. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(405)
- M. Caudill, C. Butler, Naturally Intelligent Systems. MIT Press, Cambridge, Mass, 1990.
- M. Kim, K. Adams, An expert system for construction contract claims." Construction Management and Economics, 7, pp.249-262, 1989. https://doi.org/10.1080/01446198900000026
- M. W. Emsley, D. J. Lowe, A. R. Duff, A. Harding, A. Hickson, Data modeling and the application of a neural network approach to the prediction of total construction costs, Construction Management and Economics, 20, pp.465-473, 2002. https://doi.org/10.1080/01446190210151050
- M.M.G. Elbarkouky, A.R. Fayek, A fuzzy preference relations consensus approach to reduce conflicts on shared responsibilities in the owner managing contractor delivery system, Journal of Construction Engineering and Management. 137, pp.609-618, 2011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000334
- O. Hosny, An artificial neural network approach for predicting the effect of claims on project time and cost, Engineering Research Journal, Helwan University. 106, pp.87-106, 2006.
- O. Hosny, C. Benjamin, Y. Omurtag, An Al-based decision support system for planning housing construction projects, Journal of Engineering Technology, Engineering Technology Division of the ASEE, 11, pp.12-23, 1994.
- O. Hosny, A. Elhakeem, A. El-Zafarany, A lifecycle energy and cost approach for optimum solar-screen design, Proceedings, CSCE Annual Conference, Third International/9th Construction Specialty Conference, Ottawa, ON, pp.176-200, 2011.
- O. Moselhi, T. Hegazy, P. Fazio, Neural networks as tools in construction, Journal of Construction Engineering and Management, 117, pp.606-625, 1991. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:4(606)
- P. Levin, Construction Contracts Claims, Changes, And Dispute Resolution, 2nd edition, ASCE Press, Reston, Va, 1998.
- R. Taormina, K. Chau and R. Sethi, Artificial Neural Network simulation of hourly groundwater levels in a coastal aquifer system of the Venice lagoon", Engineering Applications of Artificial Intelligence, 25(8), pp.1670-1676, 2012. https://doi.org/10.1016/j.engappai.2012.02.009
- T. Gaber, L. Rabelo, O. Hosny, An integrated artificial neural networks model for industrial projects risk assessment, Engineering Management Conference, IEEE International, 206-210, 1992.
- T. Hegazy, A. Ayed, A neural network model for parametric cost estimation of highway projects, Journal of Construction Engineering and Management, 24, pp.179-187, 1998.
- T. M. S. Elhag, Y. M. Wang, Risk assessment for bridge maintenance projects: Neural networks versus regression techniques, Journal of Computing in Civil Engineering, 21, pp.402-409, 2007. https://doi.org/10.1061/(ASCE)0887-3801(2007)21:6(402)
- T. P. Williams, Predicting changes in construction cost indexes using neural networks, Journal of Construction Engineering and Management, 120, pp.306-320, 1994. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(306)
- Z. Ren, C. J. Anumba, O. O. Ugwa, Construction claims management: Towards an agent based approach, Engineering Construction and Architectural Management, 8, pp.185-19, 2001.