DOI QR코드

DOI QR Code

A Case Study on Investment Evaluation of Hadong T/P(Thermal Power) Port

  • Kim, Myoung-Hee (Foundation of CK(University for Creative Korea) Project, Korea Maritime and Ocean University) ;
  • Lee, Ki-Hwan (Division of Shipping Management, Korea Maritime and Ocean University) ;
  • Jang, Ji-Tae (Department of Shipping Management, Graduate School of KMOU)
  • 투고 : 2015.04.01
  • 심사 : 2015.04.24
  • 발행 : 2015.04.30

초록

Until recently, thermal power plants have used high-rank coals to generate electricity. The switched to low-rank coals, primarily because of the rising coal price and the advancement of combustion technology. Therefore the thermal power plants need more fuels aspect of quantity and they are going to build extra infrastructure to deal with the increased fuel demand in their specialized ports. This paper introduces the process of the economic analysis as a case study for Hadong T/P(Thermal Power) Port. This study also evaluates investment for mew projects in ports. We analyze the costs and benefits of the port investment project using various information. And then we conduct the economic analysis using NPV(net present value), B/C ratio and IRR grounded in a financial theory. Out result of the economic feasibility shows that the new project of constructing a third berth in Hadong T/P Port has positive economic value. Additionally, this study conducts the sensitivity analysis of the major variables like cost, benefit and discount rate.

키워드

참고문헌

  1. KDI(2001), A Study on Standard Guidelines for Pre-feasibility Study on Port, p. 242.
  2. KDI(2004), A Study on Standard Guidelines for Pre-feasibility Study on Road and Railway Projects (4th Edition), p. 331.
  3. KDI(2006), Pre-feasibility for the Hinterland of Busan New Port, p. 273.
  4. KDI(2008), A Study on General Guidelines for Pre-feasibility Study (5th Edition), p. 438.
  5. Kim, C. G., Jang, H. B. and Yoon, D. H.(1996), "Analytic Approach on the Port Unloading Queueing System-A Case Study at Pohang and Gwangyang", Ocean policy research, Vol. 11, No. 2, pp. 481-513.
  6. Korea Power Exchange(2014), Generation Performance, https://epsis.kpx.or.kr/
  7. KOSPO(2013), Pre-feasibility for the third berth of Hadong T/P(Thermal Power) Port, p. 145.
  8. Ministry of Knowledge Economy(2013), The 6th National Electric Power Plan(2013-2027), p. 84.
  9. Ministry of Land, Transport and Maritime Affairs(2012), Guideline for the Harbor Loading and Unloading, p. 36.
  10. UNCTAD(1985), Port Development, p. 227.