If of application of the deep deckting floor in long span more than 6m, the deflection caused by the construction load occurred high. Because the constructing-works and safety by this deflection, take actually supports to laborers working on the deck. However, installed supports are having difficultly such as the restricted passage, deficiency of working space, and lowering of efficiency. And toward-opening deck is seen as local buckling of web plate, flexural-torsional buckling, and gradually opening of corrugated decking. In this study, we will suggest a deep decking floor system that reinforced with both ends cap plates for toward-opneing decking change from opening to closing. The constructing deflection of a deep decking more than 6m must be satified 30mm and L/180 as proposed. Full-scale field tests loading by sand conducted a deep decking reinforced with and without cap plate. In conclusion, the specimen reinforced with cap plates have shown that to ensure the negative moment $wl^2/18$. And constructing-deflection of deep decking shown that to satisfy the evaluation value (L/180 or 30mm).
춤이 깊은 데크를 6m 이상 장스팬 바닥에 사용할 경우에는 시공단계에서 데크의 발생하는 많은 처짐에 의한 작업자 및 시공안전을 고려하여 가설지주를 사용하는 것이 통상적이었다. 그러나 시공안전은 확보하였지만, 가설지주의 설치는 작업자의 통로제한, 공간의 협소, 능률의 감소 등으로 시공성의 문제가 발생한, 이는 춤이 깊은 데크는 상부 개방인 골 형태로 인한 벌어짐이나 박판으로 인한 웨브크리플링, 데크의 상부 플렌지의 국부처짐 등의 불안정성 문제가 발생할 수 있고, 이로 인해 개방형 데크의 횡-비틀림 좌굴과 같은 구조적 문제가 발생할 수 있다. 본 연구는 시공단계 동안 작용하중에 대한 춤이 깊은 데크의 제한 처짐 값을 제안하며, 장스팬의 구조안정성을 확보하고자 춤이 깊은 데크의 단부에 캡플레이트로 보강한 후 시공단계하중을 모래 재하 방법으로 실물실험 제작하여 실험을 실험하였다. 실험결과 개선안 캡플레이트 적용 유무에 따라 발생 처짐량이 최대 1/5 감소하였고, 모든 특히 단부를 연속화한 실험체의 경우, 처짐이 국내 규준과 제안 처짐 값(L/180, 30mm)을 만족하였다.