The Selection of Promising Wind Farm Sites in Gangwon Province using Multi Exclusion Analysis

다중 배제분석을 이용한 강원도 내 풍력발전단지 유망후보지 선정

  • Park, Ung-Sik (Department of Convergence System Engineering, Kangwon National University) ;
  • Yoo, Neung-Soo (Department of Mechanical and Mechatronics Engineering, Kangwon Natioan University) ;
  • Kim, Jin-Han (Department of Convergence System Engineering, Kangwon National University) ;
  • Kim, Kwan-Soo (Department of Convergence System Engineering, Kangwon National University) ;
  • Min, Deok-Ho (Department of Convergence System Engineering, Kangwon National University) ;
  • Lee, Sang-Woo (Department of Convergence System Engineering, Kangwon National University) ;
  • Paek, In-Su (Department of Mechanical and Mechatronics Engineering, Kangwon Natioan University) ;
  • Kim, Hyun-Goo (New & Renewable Energy Research Division, Korea Institute of Energy Research)
  • 박웅식 (강원대학교 융합시스템공학과) ;
  • 유능수 (강원대학교 기계메카트로닉스공학과) ;
  • 김진한 (강원대학교 융합시스템공학과) ;
  • 김관수 (강원대학교 융합시스템공학과) ;
  • 민덕호 (강원대학교 융합시스템공학과) ;
  • 이상우 (강원대학교 융합시스템공학과) ;
  • 백인수 (강원대학교 기계메카트로닉스공학과) ;
  • 김현구 (한국에너지기술연구원, 신재생에너지 자원센터)
  • Received : 2014.12.09
  • Accepted : 2015.04.21
  • Published : 2015.04.30

Abstract

Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.

Keywords

References

  1. World Wind Energy Association, 2014 Half Year Report, 2014.
  2. Ministry of Trade, Institute & Energy, The 6th Basic Plan for Electricity Supply and Demand, 2012.
  3. Ministry of Environmental, Environmental Assessment Guidelines of Onshore wind development project related Enforcement (report material), Ministry of Trade, Institute & Energy, pp.63, 2014.
  4. CGIAR.SCI, SRTM 90m Digital Elevation Data (http://srtm.csi.cgiar.org/), 2008.
  5. Ministry of Environmental, Build of Land cover classification using satellite image data, 2002.
  6. Kim. J H, Selection of Promising Wind Farm Sites on Complex Terrain in Korea, pp. 7, 2013.
  7. D. Fallo, Wind energy resource evaluation in a site of central Italy by CFD simulations, available online at http://web.windsim.com/library/papers- presentations.aspx, pp. 9-10, 2007.
  8. Spatial Environmental Information Services, National Environmental Zoning Map, 2010.
  9. The Korea Transport Institute, The explaining material for transportation digital map, 2011.
  10. Korea Forest Research Institute, The Study of Forest Management Practices on Wind Farm Installation, pp. 46, 2014.
  11. Jeffry D. Harrison, Onshore Wind Power Systems (ONSWPS) : A GIS-Based Tool for Preliminary Site-Suitability Analysis, pp. 40, 2012.
  12. Rob van Haaren and Vasilis Fthenakis, GIS-based wind farm site Selection using Spatial Multi-Criteria Analysis (SMCA): Evaluating the Case for New York State, pp. 3334, 2011.
  13. National Legal Information Center, Protection Law of Baekdudaegan Mountain Range (Enforcement 2014.9.12.), 2014.

Cited by

  1. Determination of the Most Optimal On-Shore Wind Farm Site Location Using a GIS-MCDM Methodology: Evaluating the Case of South Korea vol.10, pp.12, 2017, https://doi.org/10.3390/en10122072
  2. Prediction and Validation of the Annual Energy Production of a Wind Turbine Using WindSim and a Dynamic Wind Turbine Model vol.13, pp.24, 2015, https://doi.org/10.3390/en13246604