• 제목/요약/키워드: Promising Wind Farm Sites

검색결과 2건 처리시간 0.015초

다중 배제분석을 이용한 강원도 내 풍력발전단지 유망후보지 선정 (The Selection of Promising Wind Farm Sites in Gangwon Province using Multi Exclusion Analysis)

  • 박웅식;유능수;김진한;김관수;민덕호;이상우;백인수;김현구
    • 한국태양에너지학회 논문집
    • /
    • 제35권2호
    • /
    • pp.1-10
    • /
    • 2015
  • Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.

국내 8개 도서지역 대상 풍력발전 유망후보지 선정 및 발전량 예측 (Selection of Promising Wind Farm Sites and Prediction of Annual Energy Production of a Wind Turbine for Eight Islands in Korea)

  • 김찬종;송원;백인수
    • 한국태양에너지학회 논문집
    • /
    • 제37권6호
    • /
    • pp.13-24
    • /
    • 2017
  • Finding promising wind farm sites in islands of Korea is performed in this study. Total ten islands that have been measuring wind speed and direction using automatic weather stations for at least ten years were subjects of this study. Conditions for finding suitable wind farm sites including wind resource and various exclusion factors were applied and two islands that were found not to be suitable for wind farms were excluded. Micositing of a single wind turbine for the remaining eight islands was performed to estimate the annual energy production and the capacity factor.. Based on the simulation results, the wind farm sites selected within the eight islands were found to be suitable for wind power. The capacity factors were varied between 22.3% and 33.0% for a 100 kW wind turbine having a hub height of 30 m.