DOI QR코드

DOI QR Code

A study on the establishment of stress limit values of management monitoring in tunnel

터널 유지관리계측의 응력 관리기준치 설정에 관한 연구

  • Woo, Jong-Tae (Dept. of Construction and Environmental Design, Kyungbok University)
  • 우종태 (경복대학교 건설환경디자인과)
  • Received : 2014.12.03
  • Accepted : 2015.01.12
  • Published : 2015.01.31

Abstract

This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of concrete lining stress and reinforcement stress. The data is obtained from 7 sections of the Seoul metropolitan subway line No 6, 7, and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison shows that the safety phase is 60% of allowable stress, the attention phase is 80% of allowable stress and the precision analysis phase is 100% of allowable stress. Also, we presented a method of management monitoring by the absolute value which can be easily applied in practical affairs.

본 논문은 터널 유지관리계측의 응력 관리기준치 설정에 대한 연구로 계측 초기에 설정된 지하철계측 초기 관리기준치를 토대로 서울지하철 6,7,9호선 7개 대표단면의 콘크리트라이닝 응력, 콘크리트라이닝 철근응력, 콘크리트라이닝 내공변위에 대하여 약 5년에 걸친 계측 실적을 분석하고, 국외 계측관리기준을 비교하여 향후 터널 유지관리계측에 적용할 응력 계측관리기준치 설정에 대한 연구를 수행하였다. 연구결과 향후에 터널에 적용할 유지관리계측의 응력 관리기준치는 국내적용 계측관리기준치와 국외적용 계측관리기준치 분석결과를 비교하여 안전단계는 허용응력의 60%, 주의단계는 허용응력의 80%, 정밀분석단계는 허용응력의 100%로 실무에서 쉽게 적용할 수 있는 절대치에 의한 계측관리방법을 제안하였다.

Keywords

References

  1. Curtis, D.J., Spaul, J.A. (1996), "Monitoring of the UK tunnel lining, engineering geology of the channel tunnel", pp. 277-286.
  2. Eurotunnel, Transmanche-Link. (1991), "Monitoring of tunnel lining second annual report", Gage technique limited.
  3. Lee, D.H., Han, I.Y., Kim, G.S., Jin, S.W. (2000), "Case studies on applications of convergence measurement system at the stages of tunnel construction and maintenance", Journal of Korean Tunnelling and Underground Space Association, Vol. 2, No. 3, pp. 59-69.
  4. Lee, S., Woo, J.T. (2003), "Design and construction of retaining earth structure", Yeamoonsa, pp. 292-295.
  5. Moore. D.R., Crease, A. (1996), "Tunnel Instrumentation, Engineering Geology of the Channel Tunnel", pp. 287-294.
  6. Shim, J.S. (2012), "Reinforced concrete structural design", Goomi Publishing Co., pp. 29-32.
  7. Woo, J.T., Lee, S. (2002), "A stress of tunnel lining for maintenance monitoring", Journal of Korean Concrete Association, Vol. 14, No. 3, pp. 341-348.
  8. Woo, J.T., Lee, R.C. (2008a), "Construction monitoring engineering", Goomi Publishing Co., pp. 760-763.
  9. Woo, J.T., Lee, R.C. (2008b), "Construction monitoring engineering", Goomi Publishing Co.,
  10. Woo, J.T. (2009), "A study on comparison of a ground water influx quantity in Seoul subway tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 4, pp. 353-359.
  11. Woo, J.T., Lee, K.I. (2012), "A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 2, pp. 117-129. https://doi.org/10.9711/KTAJ.2012.14.2.117
  12. Woo, J.T. (2013), "A study on estimation of the total loss and damage ratio of maintenance monitoring sensor of subway tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 1, pp. 25-31. https://doi.org/10.9711/KTAJ.2013.15.1.025
  13. Woo, J.T. (2014), "A study on the estimation of the optimal number of monitoring points in singletrack tunnel lining with the inverse analysis program", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 1, pp. 1-11. https://doi.org/10.9711/KTAJ.2014.16.1.001

Cited by

  1. A study on the establishment of pressure limit values of management monitoring in tunnel vol.18, pp.1, 2016, https://doi.org/10.9711/KTAJ.2016.18.1.053