Abstract
As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.
최근 건축물이 대형화되고 비정형화됨에 따라 기존의 2차원 도면으로 3차원을 표현하는 데 한계가 있고 설계오류파악, 공사 물량과 공사비 오차의 발생, 시공오류의 예측 부재, 기둥, 보, 기계설비 배관 등의 부재간의 충돌 등의 문제점을 개선하고자 건설 현장에서 BIM(Building Information Modeling; 이하 BIM)이 사용되고 있다. 그러나 실질적으로 건설 공사 현장의 직원들을 대상으로 BIM의 사용법을 교육하고 평가하여 실질적인 구현 방법을 충분히 숙지하게 한 이후에 BIM을 공사 현장의 공사 관리 업무에서 사용하게 하여 BIM 사용에 따른 효과를 분석한 연구는 전무하다. 이에 본 연구는 BIM의 교육, 평가, 실시에 따른 공사현장에서 BIM의 효과를 설문조사를 통하여 실증적으로 분석하고 개선방향을 제시하고자 한다.