DOI QR코드

DOI QR Code

Research on Applying Contracting Systems for repair parts

부속품의 계약제도 적용방안에 관한 연구

  • Received : 2015.10.20
  • Accepted : 2015.12.14
  • Published : 2015.12.31

Abstract

Supply units in each command are multi-tiered and each supply unit keeps a supply level independently, which can cause excess stock, leading false reports to the Logistics Command and increasing difficulties in managing user needs. This causes excess assets and the excess then causes deformation in demand. therefore, the supply support systems of our armed forces have become high-cost/low-efficiency and are insufficient to meet the needs of users in combat units. Civilian corporations and the US Department of Defense are downsizing the aforementioned multi-tiered supply systems thus revolutionizing efficient and effective logistics by adopting Supply Chain Management(SCM), and Prime Vendor policies. Prime Vendor policy is a logistics support method that allows users to directly request and receive supply items from suppliers, based on supply contracts between suppliers and central maintenance organizations like KDA. In other words, it is a system that allows for users to make orders to suppliers directly and suppliers to deliver goods to the users directly, cutting out the middle stage, thus allowing an efficient supply. This is a way forward in finance that cuts costs in net supplies and allows an efficient utilization of civilian assets. which is also known to fasten the speed of logistical support and stripping down the logistical structure. therefore, this report will explore Prime Vendor policies adopted in certain number of units for medical supplies that were taken in consideration of improvements in stock management in civilian organizations and the US Army, and aims to apply such policies for repair parts.

Keywords

References

  1. KIDA, Application of Prime Vendor policies in logistics support and improvements('12.11.19)
  2. KIDA, Expansion of Prime Vendor(PV) system for renovation in defence supplies('09.11.30)
  3. KIDA, Improvements in efficiency for supplying repair parts('13.11.4)
  4. Choi Su Dong, Improving logistics support through central stock control('02)