DOI QR코드

DOI QR Code

냉동기 고장경향분석을 통한 설비신뢰도향상 방안 제시

The Suggestion of Reliability Improvement Method based on Failure Trend Analysis of Chiller

  • Lee, Sang Dae (Dept. of System and Reliability engineering, KHNP) ;
  • Yeom, Dong Un (Dept. of System and Reliability engineering, KHNP) ;
  • Hyun, Jin Woo (Dept. of System and Reliability engineering, KHNP)
  • 투고 : 2015.07.29
  • 심사 : 2015.11.23
  • 발행 : 2015.12.01

초록

Chiller system plays an important role of maintaining room temperature constantly by supplying chilled water to Heating, Ventilating and Air Conditioning(HVAC)or area room cooler equipment during plant normal operation or accident condition. Chiller failures are one of the most frequently occurring equipment failures. If the types of chiller failures are analyzed and grouped thoroughly, it would be helpful to make chiller maintenance strategy at the plants. That would enhance equipment reliability of chiller in the end. In this paper, chiller failure data during three years were analyzed and categorized by specific failure code. In addition, the various proposals to improve equipment reliability of chiller were suggested such as Preventive Maintenance Optimization(PMO) strategy and performance monitoring reinforcement and so on.

키워드

참고문헌

  1. G. Toman, "Life Cycle Management Planning Sourcebooks -Chiller", EPRI TR-1015075. pp25, pp51-53, pp91, Dec 2012.
  2. KHNP, "System Description of Standard Nuclear Plants", 2003-단009, P658, May 2003.
  3. M. Pugh, "Chiller Performance Monitoring and Troubleshooting Guideline", EPRI TR-1007361, pp75, pp91-102. Nov 2002.
  4. L. Rogers, "Maintenance Engineering Fundamentals", EPRI TR-1016307, pp82, Dec 2007
  5. M. Bridges, "Equipment Condition Monitoring", EPRI TR-106857, pp43, Sep 2000
  6. Leonard Lofin, "SysMon 2.0 User's Guide: System Monitoring by System Engineers", EPRI TR-107668, pp65, March 1997.
  7. Myung-hwan Boo, The Development of Long Term Asset Management Strategy for Operating Nuclear Power Plants, KHNP report, pp46, Dec 2012