Application of Extended Collaborative Process Modeling(exCPM) for multi-disciplinary Collaboration and Coordination in Planning Phase

BIM 기반 초기설계단계 협업 프로세스 향상을 위한 exCPM 적용 방안에 관한 연구

  • Received : 2014.06.05
  • Accepted : 2014.10.21
  • Published : 2014.11.30

Abstract

Although IT has been converged with overall industries and has lead the improvement of productivity through improvement of systems, the construction industry has faced a limit in improvement of productivity due to adhesion of traditional methods. BIM was introduced to solve this issue, but BIM is not being currently applied due to lack of Planning Phase Collaboration because of segementation of work. Therefore, this study has purpose to review the applicability of exCPM methodology, which was suggested as a collaborative process modeling methodology in the industrial engineering field, in Architecture/Structure design process. By applying the exCPM methodology in processes deducted from actual case analysis, an Architecture/Structure collaborative process in Planning Phase is proposed. The proposed process was converted to the Petri-Nets model and analyzed to validate that the process model was properly established.

Keywords

References

  1. 정재국, 김예상, BIM 매니저 핵심역량 중요도 분석-대형 종합건설업체의 관점에서-, 대한건축학회논문집 구조계 제28권 제1호 p.p.175-182, 2012
  2. 상준, 김재준, BPMN을 이용한 IPD기반 BIM 설계 프로세스에 관한 기초연구, 한국 BIM학회 학술발표대회 논문집 p.p.103-104, 2013
  3. 김재준, 건설산업 IPD 도입의 필요성 및 과제, 한화건설 기술지 Vol.3, 2010
  4. 김용화, 김재준, BIM 기반의 초기설계단계 협업 프로세스에 관한 연구, 한국 CAD/CAM 학회 학술발표회 논문집 p.p.662-667, 2012
  5. 이선화, 류광열, 협업프로세스 모델링 방법 개발 및 검증, Journal of the Korean Institute of Industrial Engineers, Vol. 36, No.3, p.p.176-185, 2010
  6. 이진희, 전한종, BIM 기반 통합설계프로세스의 국내 적용 가능성에 관한 연구, 한국실내디자인학회논문집 제16권 6호 p.p.19-27, 2010
  7. 임동순, 김철한, 우훈식, 김중인, 비즈니스 프로세스 모델링 연계 방법론 : IDEF0, IDEF3, Petri Nets, 한국 CALS/EC 학회지, 제 3권 제2호, p.p.141-160, 1998
  8. 구본상, 박희성, 장철기, 김대영, 린 건설과 해외 대규모 건설공사 적용 사례 : 런던 히드로 공항, 대한건축학회 논문집 제22권 7호, p.p.141-148, 2006
  9. 김대영, 박희성, 린 건설의 실무현장 적용 및 사례 연구, 대한건축학회 논문집 제19권 4호, p.p.145-152, 2003
  10. 서정호, 시공성 검토 효율화 향상을 위한 BIM 기반 간섭체크업무의 협업 프로세스 구축, 한양대학교 학위 논문, 2012
  11. Chunk Eastman 외 3명, BIM Handbook, 2014
  12. R. Kwangyeol and E. Yucesan, "CPM: A collaborative process modeling for cooperative manufacturers", Advanced Engineering Informatics 21, p.p.231-239, 2007. https://doi.org/10.1016/j.aei.2006.05.003
  13. AIA California Council, Intergrated Project Delivery, 2007 AIA, Organizing the Development of a BuildingInformation Model, AI1A California Council The AmericanInstitute of Architects, 2008
  14. O. Salem, J. Solomon, A. Genaidy and I. Minkarah, "Lean Construction: From Theory to Implementation", Journal of Management in Engineering, vol. 22, no. 4, p.p.168-175, 2006.
  15. Yoo, T., Jeong, B., and Cho, H. A Petri-Nets based functional validation for services composition, Expert Systems with Application, 37(5), 3768-3776 https://doi.org/10.1016/j.eswa.2009.11.046
  16. T. Hegazy, E. Zaneldin and D. Grierson, "Improving Design Coordination for Building Projects. I: Information Model", Journal of Construction Engineering and Management, vol. 127, no. 4, p.p.322-329, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(322)
  17. E. Zaneldin, T. Hegazy and D. Grierson, "Improving Design Coordination for Building Projects. II: A Collaborative System", Journal of Construction Engineering and Management, vol. 127, no. 4, p.p.322-329, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(322)
  18. S. W. Cho, "Cost Innovation through Integration of BIM Technologies and Lean Management by DPR Construction", The BIM Autumn, vol.8, p.p.36-37, 2012
  19. W. Kim, "Why Perform Low When You can Perform High? BIM/Lean/IPD in DPR Construction", The BIM Summer, vol.9, p.p.36-39, 2013

Cited by

  1. Dual-process modeling and control method for new product collaborative design based on petri net pp.1868-5145, 2018, https://doi.org/10.1007/s12652-018-0904-2