DOI QR코드

DOI QR Code

Application of x-MR control chart on monitoring displacement for prediction of abnormal ground behaviour in tunnelling

터널 시공 중 이상 거동 예측을 위한 계측 변위의 x-MR 관리도 활용

  • Received : 2014.08.22
  • Accepted : 2014.09.15
  • Published : 2014.09.30

Abstract

The displacement data monitored during tunnel construction play a crucial role in predicting the behaviour of ground around and ahead of excavation face. However, the management criteria for monitoring data are not well established especially for the reliable analysis on varying aspect of displacement data along with chainage. In this study, we evaluated the applicability of x-MR control chart method, which is kind of applied statistical management method, for the analysis of displacement monitoring data in terms of prediction of possible collapse or induced cracks. As a result, a possible abnormal behaviour could be predicted beforehand at 5 ~ 13 m ahead or on at least one day before it occurred by using x-MR control chart method. In addition, it is noted that the moving range for the x-MR control chart should be set to 5~10 for this purpose.

터널 시공 중 측정된 계측 데이터는 굴진면 전방에 분포하는 지반과 터널 거동을 예측하는데 있어 중요한 요소이다. 그러나 현장에서 측정된 계측 데이터의 변동성을 객관적으로 분석할 수 있는 관리 기준이 명확하게 설정되어 있지 않다. 본 연구에서는 응용 통계 관리기법의 일종인 x-MR 관리도기법을 이용하여 시공 중 붕괴 또는 구조물 균열 등을 발생시키는 현장의 계측 데이터를 분석하고 분석기법의 적용성을 검토하였다. x-MR 관리도를 통해 관리 한계선을 설정하여 분석한 결과, 붕괴 발생 전 약 5~13m 이전에 이상 거동에 대한 예측이 가능하였으며, 시간에 따른 변위의 분석 결과, 최소 1일 전에 예측이 가능하였다. 또한, x-MR 관리도 작성시 이동 범위(k)는 5~10으로 설정하는 것이 이상 거동 예측에 적절한 것으로 판단된다.

Keywords

References

  1. Kim, K.Y. (2009), "Characteristics of tunnel convertgence behaviour based on variation of rock mass rating", The Journal of Engineering Geology, Vol. 18, No. 4, pp. 545-553.
  2. Kim, J.G., Um. S.J., Kim, S.K., Choi, S.W., Song, J.M. (2010), "Research results and trends analysis on process control charts for detecting small shift", The Spring Conference of the Korean Institute of Industrial Engineers, pp. 834-842.
  3. Kwon, O.I., Baek, Y., Seo, Y.S. (2008), "Development of slope displacement data analysis system using control chart theory", Conference of the Korean Society of Engineering Geology, pp. 137-143.
  4. Park, S.H., Lee, T.J., Park, C.S. (2008), "A study on evaluation of tunnel stability by ground displacament under construction", Conference of the Korean Society of Engineering Geology, pp. 95-103.
  5. Park, S.H., Park, Y.H. (2013), "Statistical quality control", Minyoungsa, pp. 574-578.
  6. Shewhart, W.A. (1924), "Some applications of statistical methods to the analysis of physical and engineering data", Bell System Technical jounal, Vol. 3, No. 1, pp. 43-87. https://doi.org/10.1002/j.1538-7305.1924.tb01347.x
  7. The Japanese Geotechnical Society (1999), "Prediction and practice in NATM", pp. 239-242.
  8. Yim, S.B., Kim, S.K., Seo, Y.S., Park, S.H. (2007), "A study on convergency of tunnel displacement using conrol chart method", The Journal of Engineering Geology, Vol. 17, No. 2, pp. 197-204.
  9. Yim, S.B., Jeong, H.G., Seo, Y.S. (2009), "Assessment of tunnel displacement with weak zone orientation using 3-D numerical analysis", The Journal of Engineering Geology, Vol. 19, No. 1, pp. 43-50.
  10. Yim, S.B., Kim, K.Y., Kim, C.Y., Seo, Y.S. (2010), "New approach on prediction of fault zone ahead of tunnel face by using x-Rs control chart for RMR parameters", Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 6, pp. 463-473.
  11. Yun, H.S., Seo, Y.S., Kim, K.Y. (2014), "Prediction of fault zone ahead of tunnel face using x-Rs control chart analysis for crown settlement", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 4, pp. 361-372. https://doi.org/10.9711/KTAJ.2014.16.4.361

Cited by

  1. Prediction of Fault Zone ahead of Tunnel Face Using Longitudinal Displacement Measured on Tunnel Face vol.26, pp.2, 2016, https://doi.org/10.9720/kseg.2016.2.187
  2. Strain Analysis of Crust at the Stabilization Stage Using and Applied Statistical Analysis vol.25, pp.1, 2015, https://doi.org/10.9720/kseg.2015.1.9
  3. Developments of real-time monitoring system to measure displacements on face of tunnel in weak rock vol.17, pp.4, 2015, https://doi.org/10.9711/KTAJ.2015.17.4.441