DOI QR코드

DOI QR Code

Development of Integrated System of Time-Driven Activity-Based Costing(TDABC) Using Balanced Scorecard(BSC) and Economic Value Added(EVA)

BSC와 EVA를 이용한 TDABC 통합시스템의 개발

  • Choi, Sungwoon (Department of Industrial Engineering, Gachon University)
  • 최성운 (가천대학교 산업공학과)
  • Received : 2014.07.20
  • Accepted : 2014.09.18
  • Published : 2014.09.30

Abstract

The purpose of this study is to implement and develop the integrated Economic Value Added (EVA) and Time-Driven Activity-Based Costing (TDABC) model to seek both improvement of Net Operating Profit Less Adjusted Tax (NOPLAT) and reduction of Capital Charge (CC). Net Operating Profit Less Adjusted Tax (NOPLAT) can be maximized by reducing the indirect cost of an unused resource capacity increased by Cost Capacity Ratio (CCR) of TDABC. On the other hand, Capital Charge (CC) can be minimized by improving the efficiency of Invested Capital (IC) considered by Weighted Average Cost of Capital (WACC) of EVA. In addition, the integrated system of TDABC using Balance Scorecard (BSC) and EVA is developed by linking between the lagging indicators and the three leading indicators. The three leading indicators include customer, internal process and growth and learning perspectives whereas the lagging indicator includes NOPLAT and CC in terms of financial perspective. When the Critical Success Factor (CSF) of BSC is cascading as a cause and an effect relationship, time driver of TDABC and capital driver of EVA can be used efficiently as Key Performance Indicator (KPI) of BSC. For a better understanding of the proposed EVA/TDABC model and BSC/EVA/TDABC model, numerical examples are derived from this paper. From the proposed model, the time driver of TDABC and the capital driver of EVA are known to lessen indirect cost from comprehensive income statement when increasing the efficiency of operating IC from the statement of financial position with unified KPI cascading of aligned BSC CSFs.

Keywords

References

  1. Adeoti A.A., Valverde R. (2014), "Time-Driven Activity-Based Costing for the Improvement of IT Service Operations", International Journal of Business and Management, 9(1):109-128.
  2. Ahn T., Jung H., Song S. (2009), "Costing Banking Services Using Time-Driven Activity-Based Costing", Korean Accounting Journal, 18(2):185-219.
  3. Ayvaz E., Pehlivanli D. (2011), "The Use of Time-Driven Activity-Based Costing and Analytic Hierarchy Process Method in the Balanced Scorecard Implementation", International Journal of Business and Management, 6(3):146-158.
  4. Bryon K., Everaert P., Lauwers L., Van Meensel J. (2009), "Time-Driven Activity-Based Costing for Supporting Sustainable Decisions in Pig Production", Working Paper, Ghent University.
  5. Chi S., Lee J. (2010), "The Case Study of Time-Driven ABC Model Application on Product Costing : Chemical-Product Division of H Company", Korean Journal of Management Accounting Research, 10(1):157-190.
  6. Choi S. (2014), "Development and Implementation of Extension Models for Activity-Based Costing", Journal of Korea Safety Management and Science, 16(1):239-250. https://doi.org/10.12812/ksms.2014.16.1.239
  7. Dejnega O. (2011), "Method Time-Driven Activity-Based Costing : Literature Review", Journal of Applied Economic Sciences, 6(1):7-15.
  8. Demeere N., Stouthuysen K., Roodhooft F. (2009), "Time-Driven Activity-Based Costing in a Outpatient Clinic Environment : Development, Relevance and Managerial Impact", Health Policy, 92(2-3):296-304. https://doi.org/10.1016/j.healthpol.2009.05.003
  9. Diaconeasa A.A., Manea N., Oprea S. (2010), "Modelling Costs Using Time-Driven ABC Method in Logistic Activities", Supply Chain Management Journal, 1:88-92.
  10. Everaert P., Bruggeman W. (2008), "Cost Modeling in Logistics Using Time-Driven ABC", International Journal of Physical Distribution & Logistics Management, 38(3):172-191. https://doi.org/10.1108/09600030810866977
  11. Everaert P., Bruggeman W., De Creus G. (2008), "Sanac Inc. : From ABC to Time-Driven ABC(TDABC) : An Instructional Case", Journal of Accounting Education, 26 : 118-154. https://doi.org/10.1016/j.jaccedu.2008.03.001
  12. Everaert P., Gleuren G., Hoozee S. (2012), "Using Time-Driven ABC to Identify Operational Improvements : A Case Study in a University Restaurant", Cost Management, 26(2):41-48.
  13. French K.E., Albright H.W., Frenzel J.C., Incalcaterra J.R., Rubio A.C., Jounes J.F., Feeley T.W. (2013), " Measuring the Value of Process Improvement Initiatives in a Preoperative Assessment Center Using Time-Driven Activity- Based Costing", Healthcare, 1:136-142. https://doi.org/10.1016/j.hjdsi.2013.07.007
  14. Gervais M., Levant Y., Ducrocq C. (2010), "Time-Driven Activity-Based Costing(TDABC) : An Initial Appraisal through a Longitudinal Case Study", Journal of Applied Management Accounting Research, 8(2):1-20.
  15. Grant J.L. (2002), Foundations of Economic Value Added, 2 Edition, John Wiley & Sons, Inc.
  16. Hajiha Z., Alishah S.S. (2011), "Implementation of Time-Driven Activity-Based Costing System and Customer Profitability Analysis in the Hospitality Industry : Evidence From Iran", Economics and Finance Review, 1(8):57-67.
  17. Hennrikus W.P., Waters P.M., Bae D., Virk S.S., Shah A.S. (2012), "Inside the Value Revolution at Children's Hospital Boston : Time-Driven Activity-Based Costing in Orthopaedic Surgery", The Harvard Orthopaedic Journal, 14:50-57.
  18. Hon J., Chu S. (2012), "Implementation of Time-Driven Activity-Based Costing : A Case Study of Aerospace Precision Casting Factory", Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference, 426-435.
  19. Kaplan R.S., Anderson S. (2004), "Time-Driven Activity-Based Costing", Harvard Business Review, 82:131-138.
  20. Kaplan R.S., Anderson S. (2007), Time-Driven Activity-Based Costing : A Simpler and More Powerful to Higher Profits, Harvard Business School Press.
  21. Kim S., Koo J. (2013), " Time-Driven ABC Implementation on Insurance Services", Korean Accounting Journal, 22(2):335-362.
  22. Lee J. (2011), "Time-Driven ABC Model as a Tool of Strategic Decision Making : Case Study on Cost Accounting", POSRI Business Review, 11(2):5-29.
  23. Lee J. (2013), "A Methodological Approach on Establishing Performance Indicators for Balanced Scorecard by the Application of Time- Driven ABC Model", POSRI Business Review, 13(1):5-39.
  24. Mortaji S.T.H., Bagherpour M., Mazeh M.M. (2013), "Fuzzy Time-Driven Activity-Based Costing", Engineering Management Journal, 25(3):63-73. https://doi.org/10.1080/10429247.2013.11431983
  25. Pineno C.J. (2012), "Simulation of the Weighting of Balanced Scorecard Metrics : Including Sustainability and Time-Driven ABC Based on the Product Life Cycle", Management Accounting Quarterly, 13(2):21-38.
  26. Reddy K., Venter H.S., Olivier M.S. (2012), "Using Time-Driven Activity-Based Costing to Manage Digital Forensic Readiness in Large Organisations", Information Systems Frontiers, 14:1061-1077. https://doi.org/10.1007/s10796-011-9333-x
  27. Sarokolaei M.A., Saviz M., Moraldoo M.F., Dahaj N.S. (2013), "Time-Driven Activity-Based Costing by Using Fuzzy Logics", Procedia-Social and Behavioral Sciences, 75:338-345. https://doi.org/10.1016/j.sbspro.2013.04.038
  28. Shin S., Lee J., Choi W. (2012), "A Study on the Activity-Based Budgeting by Time-Driven ABC Model : The Case of D Company", Korean Accounting Journal, 21(2):153-181.
  29. Somapa S., Cools M., Dullaert W. (2012), "Unlocking the Potential of Time-Driven Activity-Based Costing for Small Logistics Companies", International Journal of Logistics : Research and Applications, 15(5):303-322. https://doi.org/10.1080/13675567.2012.742043
  30. Stewart B. (2013), Best Practice EVA : The Definite Guide to Measuring and Maximizing Shareholder Value, John Wiley & Sons, Inc..
  31. Stouthuysen K., Swiggers M., Reheul A., Roodhooft F. (2010), "Time-Driven Activity-Based Costing for a Library Acquisition Process : A Case Study in a Belgian University", Library Collections, Acquisitions, & Technical Services, 34:83-91. https://doi.org/10.1016/j.lcats.2010.05.003
  32. Tse M.S.C., Gong M.Z. (2009), "Recognition of Idle Resource in Time-Driven Activity-Based Costing and Resource Consumption Accounting Models", Journal of Applied Management Accounting Research, 7(2):41-54.
  33. Waago-Hansen C. (2014). "How Time-Driven Activity-Based (TDABC) Enables Better Use of Existing Resources in order to Improve Return on Investment (ROI) in Modern Healthcare and Hence Facilitates a Sustainable Healthcare System", the Health, 5(1):3-8.
  34. Wegmann G., Nozile S. (2009). "The Activity-Based Costing Method Development : State-of-the Art and Case Study", The IPU Journal of Accounting Research and Audit Practices, 8(1):7-22.
  35. Yilmaz M., Coskun A., Yilmaz S. (2013), "A Comparison and an Implementation of Time-Driven Activity-Based Costing and Activity-Based Costing Methods in Private Schools", International Conference on Economic and Social Studies, 1-9.
  36. www.lge.co.kr