Qualitative Risk Factor Analysis of Overseas LNG Plant in Operation and Management Phases

해외 LNG 플랜트 운영관리단계의 정성적 위험요인 분석

  • 지덕근 (중앙대학교 일반대학원 건축학과) ;
  • 박문선 (중앙대학교 일반대학원 건축학과) ;
  • 김용수 (중앙대학교 건축학과)
  • Received : 2014.02.28
  • Accepted : 2014.07.17
  • Published : 2014.08.30

Abstract

The purpose of this study is to analyze qualitative risk factors that are considered in operation and management phases of overseas LNG plant. For this purpose, the study investigated risk factors of similar projects. Based on these results, risk factors of overseas LNG plant are derived and qualitative risk factors are classified from interview with experts. Qualitative risk factors that have been classified, are analyzed priority and relative importance by using AHP method. The results of this study according to purpose and method are as follows: 1)Forty-two risk factors, from 125 risk factors of similar projects being investigated, on LNG plant operation and management phases were derived. Risk factors were separated by transportation, sales, maintenance and management, and then 20 qualitative risk factors were derived by survey of experts. The results of relative importance analysis by using AHP method based on qualitative risk factors are as follows: Relative importance of "LNG production which does not meet quality contract(M-12)" was analyzed as the most highly risky factor. "Cancel a license contract of core technology(M-07)", "Insufficient review of local relevant laws(M-08)", "Occurred defects of equipment due to insufficient design(R-08)" have been analyzed in order of importance.

Keywords

Acknowledgement

Supported by : 국토해양부

References

  1. 유위성, 맞춤형 해외사업 리스크관리 모델(안) 제안, 한국건설산업연구원 건설이슈포커스, 2012
  2. 장우식, 해외 LNG 플랜트 리스크 요인 도출 및 우선순위 평가, 한국건설관리학회 논문집, 2011
  3. Bent Flyvbjerg, Megaprojects and Risk, 2007
  4. El-Adaway, I. and Kandil, A., Construction Risk: Single versus Portfolio Insurance., Journal of Management in Engineering, 2010
  5. Gad G., Kalidindi S., Shane J., and Strong K, Analytical Framwork for the Choice of Dispute Resolution Methods in International Construction Projects Based on Risk Factors, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2011
  6. Jiang S. and Zhang J., Development of an Ontology-Based Semantic Retrieval Method for Construction Project Risk Management, ICCREM, 2013
  7. Karimiazari, Risk assessment model selection in construction industry, 2011
  8. Moonsun Park, The Research on Conceptual Model of LNG Plant Project Planning Expert System, ICCEM/ICCPM, 2009
  9. Steffey R. and Anantatmula V., International projects proposal analysis: Risk assessment using radial maps, Project Management Journal, 2011
  10. Thuyet N, Ogunlana S. and Dey P., Risk management in oil and gas construction project in Vietnam, International Journal of Energy Sector Management, 2007
  11. Tiong, Risk Management in International Construction Joint Ventures, 1999
  12. Tomas L. Saaty, What is the Analytic Hierarchy Process, 1988
  13. Zhi He, Risk Management For Overseas Construction Projects, International Journal of Project Management, 1995