DOI QR코드

DOI QR Code

일상적 도로관리를 위한 장비의 적정 보유대수 산정에 관한 연구

Estimating Proper Number of Equipment for Ordinary Road Management Operations

  • 김인수 (한국건설기술연구원 도로교통연구실) ;
  • 양충헌 (한국건설기술연구원 도로교통연구실)
  • 투고 : 2014.05.07
  • 심사 : 2014.07.14
  • 발행 : 2014.08.18

초록

PURPOSES: This study provides a methodology for estimating proper number of equipment for ordinary road management works. METHODS: Utilizing a computerized data of record systems (KAMIS) in 18 regional offices, two evaluation indicators were calculated and then normalized for objective comparison. Applied magnifying factor to the outputs, the proper number of equipment can be estimated. RESULTS: As a result, proper number of equipment by regional offices were required 28% more than current conditions. CONCLUSIONS: Using the proposed a methodology, fundamental data for scientific and reasonable strategies can be stored as well as be used for the future plan for budget allocation.

키워드

참고문헌

  1. Caltrans, 2012. Fleet Equipment Asset Management Performance Measures.
  2. Kang, S.C., Lee, S.Y. and Lee, B.D., 2013. The Study on the Viewshed Analysis and the Estimation of Proper Number of Forest Fire Surveillance Cameras (Focusing on Samcheok-Si), Journal of KOSHAM, vol. 13, No. 3, pp. 131-137. https://doi.org/10.9798/KOSHAM.2013.13.3.131
  3. Kim, S.K. and Han, K.K., 2008. A Study on the Estimation of Proper Numbers of Construction Lifts, Journal of The Korea Institute of Building Construction, vol. 8, No. 3, pp. 119-125. https://doi.org/10.5345/JKIC.2008.8.3.119
  4. Kwon, S.J., Seo, J.H. and Choi, B.D., 2011. A Basic Study for Calculating Appropriate Number of Parking Lots at University Hospital in Metropolitan Area, Journal of Korea Institute of Healthcare Architecture, vol. 17, No. 3, pp. 27-33.
  5. Park, S.S., 2000. A Study on Number of Prove Cars for Collecting Traffic Information, Master thesis, Myong Ji University.
  6. The Bank of Korea, 2014. National Accounts 2013 (provisional).
  7. The Ministry of Land, Infrastructure and Transport, 2013. Road Services Manual(2012).
  8. The Ministry of Land, Infrastructure and Transport, 2013. Yearbook of Road Statistics(2013).
  9. The Ministry of Land, Infrastructure and Transport, 2014. Fiscal year 2014 budget summary.
  10. Yang, C.H. and Kim, I.S., 2012. Evaluation for Operational Efficiency of Road Management Equipment using Analytical Hierarchy Process, International Journal of Highway Engineering, vol. 14, No. 5, pp. 157-164.