Transmission Network Expansion Planning for the Penetration of Renewable Energy Sources - Determining an Optimal Installed Capacity of Renewable Energy Sources

  • Kim, Sung-Yul (Dept. of Energy Engineering, Keimyung University) ;
  • Shin, Je-Seok (Dept. of Electrical Engineering, Hanyang University) ;
  • Kim, Jin-O (Dept. of Electrical Engineering, Hanyang University)
  • Received : 2013.07.12
  • Accepted : 2014.01.27
  • Published : 2014.07.01

Abstract

Due to global environmental regulations and policies with rapid advancement of renewable energy technologies, the development type of renewable energy sources (RES) in power systems is expanding from small-scale distributed generation to large-scale grid-connected systems. In the near future, it is expected that RES achieves grid parity which means the equilibrium point where the power cost of RES is equal to the power costs of conventional generators. However, although RES would achieve the grid parity, the cost related with development of large-scale RES is still a big burden. Furthermore, it is hard to determine a suitable capacity of RES because of their output characteristics affected by locations and weather effects. Therefore, to determine an optimal capacity for RES becomes an important decision-making problem. This study proposes a method for determining an optimal installed capacity of RES from the business viewpoint of an independent power plant (IPP). In order to verify the proposed method, we have performed case studies on real power system in Incheon and Shiheung areas, South Korea.

Keywords

1. Introduction

Due to deregulation, environmental reasons and technical improvements, renewable energy sources (RES) are increasingly penetrated and operated in power systems [1]. Energy policies such as a renewable portfolio standard (RPS), mandate utilities and other load serving entities procure a significant portion of their customers’ electricity needs from RES [2-5]. Furthermore, these clean energy sources have become cost-competitive with conventional power systems [6, 7]. In some areas, the power cost of RES, including photovoltaic generation (PV) and wind turbine (WT), have already started to reach grid parity because these cost depend mainly on the area where the RES is located, while the power cost of conventional power such as coal-based power is depend on the fuel cost and it has shown a tendency to increase [8, 9]. For these reasons, the development of RES in power system is increasing, and the size is expanding from small-scale distribution systems to large-scale transmission systems.

The availability of RES varies over time, with location and with a kind of the used resource. The output of RES is intermittent and particularly hard to control compared to conventional power plants which are designed on a large scale for continuous operation and control the output [10]. Additionally, in most conventional power plants, changes in financing terms have had relatively little impact on power costs because the capital cost element in the power cost is small. On the other hand, the capital cost of RES forms the largest element of power cost. Governments have resolved these issues in order to promote the uptake of RES through a feed-in tariff, quota system, carbon tax and trading, and tax relief [11]. Nevertheless, renewable energy projects are still under some economic strains, especially for individual power plants (IPP). Therefore, IPP’s stance on issues, such as determining an economic installed capacity of RES and location, has become more important.

Various studies for determining an optimal installed capacity of RES have introduced and provided methods. In [12], the objective function is to minimize the total cost involved in RES construction. In [13, 14], minimizing energy loss is considered as the objective function. Jianhui Wang et al. [15] proposes a method for solving a problem between individual generating companies’ own decision and the independent system operator (ISO)’s market clearing problem. Gianni Celli et al. [16] presents an objective function in order to minimize the total cost on network upgrading, service interruptions, and energy purchased. However, most research is focused on the ISO’s stance considering network conditions, constraints, and expenses. Therefore, determining size of RES in an IPP’s stance has to be studied in order to voluntarily promote the uptake of RES. In this respect, this paper proposes a methodology to determine an optimal installed capacity of RES for profit maximization in IPPs, considering construction costs, interconnection costs, operation and maintenance costs, and the generation of revenue. The proposed method is applied to real power systems in South Korea in order to verify it.

 

2. Problem Formulation

The fixed cost for constructing a new power generation can be only considered for short term or temporary expenses. On the other hand, the variable benefit has to be considered during the warranty period of new power generation. It has to be considered as the present value of the variable benefits in the future. As a result, the investment plan of new power generation is evaluated based on the net present value (NPV), which is an indicator of how much value the investment of a new generation project adds to the IPP [17-20].

2.1 Objective function

In this paper, the optimal installed capacity of RES is determined by the maximized NPV that an IPP can obtain. This is determined by the maximized benefit with fixed costs and variable benefit. Accordingly, the objective function to select the optimal installed capacity of RES can be defined as follows:

Maximize:

Subject to:

where Ng and r are the warranty period of RES g and the discount rate, respectively. The installed capacity of RES g located in k is . The maximum installable capacity is based on the total land size, represented as . C and B describe the fixed cost and annual benefit, respectively, upon all available installed capacity of RES. These variables will be covered in detail in the following paragraphs.

2.2 The fixed cost: C

The fixed cost in this paper is the initial cost for construction and grid connection of the RES. This cost is a temporary expense, and can be described as the sum of the construction cost, CCT and grid connection cost, CIC . Therefore, it can be represented as follows:

2.3 The variable benefit: B

The annual variable benefit from the RES is based on operation of the RES. This benefit is calculated as the subtraction between annual power generation revenue, RGen. , and operation and maintenance (O&M) cost, CO&M . It can be described as follows:

 

3. Sizing Indices

The factors for determining an optimal installed capacity of RES are divided into income and expenses from the IPP’s stance. In this paper, the capital cost of RES includes construction costs and grid connection costs as well as the O&M costs, and these costs are considered as expenses [21, 22]. On the other hands, power generation revenue from the RES is considered to be income.

3.1 Construction costs

While the exact construction costs of the RES could not be defined as a single form, they are broadly similar to the global estimate. Therefore, total construction cost could be estimated by the unit cost of construction per generation capacity. As such, the construction costs of RES could be defined as follows.

Here, is the unit construction cost per MW according to the types of generation source.

3.2 Interconnection costs

The interconnection costs of the RES in a network have led to the problem on the attribution of responsibilities between grid operators and generators. Different practices are separated to 3 approaches as Deep, Shallow and Super- Shallow based on the attribution of grid connection costs and grid reinforcement costs [23].

3.2.1 Deep charging approach

An approach where a renewable generation operator bears all of the connection costs for the grid connection line and the reinforced cost of the transmission system.

3.2.2 Shallow charging approach

An approach where a renewable generation operator bears the grid connection line cost, and the reinforced cost is borne by the transmission operator.

3.2.3 Super-Shallow charging approach

An approach where the transmission operator bears both the grid connection line cost and the reinforced cost of the transmission system.

In the case of Europe, the deep charging approach was generally used at initial stages of development. It was replaced by the shallow charging approach to bear grid connection costs by renewable generation operator, and has spread to the super-shallow approach at present [24]. South Korea is operating under the shallow charging approach. Therefore, this study assumes that the connection costs in IPP’s stance are limited to the grid connection line cost. The connection cost of new power generation can deploy the formula for installed capacity and the distance to the connecting point as follows:

where, is the unit grid connection cost per MW·km of power generation, g, and dk represents the distance of the connection point of the transmission line to the new power generation facility. Generally, priority consideration for grid connection planning is given to the new power generation operator when the generation operator connects to the grid. The connection to either a substation of the shortest distance, or a nearby power generation facility or bus, must primarily be considered [25].

3.3 Operation and maintenance costs

In this paper, O&M costs includes labor cost, materials cost and repair & maintenance cost in order to operate and maintain the RES, which installed capacity is . The annual cost for O&M of RES is defined as follows:

where means the unit cost of O&M per MWh generated from RES g. The output of RES g at time t is described by .

3.4 Generation revenue

The revenue from power generation means profit which is obtained by the sale of electric power, and it is determined by the amount of power and the power sale price of delivery time.

The formula below describes the power generation equations for PV and WT:

The output of RES g differs according to the grid connection point k. Furthermore, the output of PV is affected by weather conditions and characteristics of PV system. Wg is the irradiation point, where further increases in irradiation produce relatively small change in efficiency. Gk(t) and ηg is irradiation and the corresponding efficiency via Wg, respectively. On the other hand, the output of WT can be calculated using wind velocity, Vk(t) and the constant output coefficients, ag, bg and cg. Therefore, there are limitations to control and forecast the output of these types of power generation. In other words, the RES may produce less than the amount anticipated by power generation operators during special circumstances, and electrical power from the RES might be larger than the capacity of the grid connection line at other times. As a result, the actual power from RES to the grid should be limited by the transmission transfer capability, and it is represented as follows:

This equation confirms that the actual power from the RES to the grid is determined as the smaller amount between the output power of RES g at time t and the total transfer capability (TTC) of the interconnection line, .

The revenue from annual power sales of the RES is defined as the actual supply of power and the power sale price based on each time as follows [26]:

where π(t) is the power sale price at time t.

 

4. Flow Chart for Determining an Optimal Installed Capacity of RES

Finally, the process for determining an optimal installed capacity of RES is described in Fig. 1.

Fig. 1.Flow chart for determining an optimal installed capacity of RES

After determining the installed capacity of RES in a network, the effects derived from this RES are evaluated by the risk level which will be proposed in our future work.

 

5. Case Study

Actual grid data of Incheon and Shiheung in South Korea have been applied to the case study for high-voltage transmission lines in the range of 154kV to 345kV. The map for the objective grid is in Fig. 2.

Fig. 2.Case study system

G2, G3 and G4 are power generators for actual grid, and G1 and G5 are the existing power generators on the power system. No additional RES are in this system. A PV and WT are interconnected into case study system in Case 1 and Case 2, respectively. The location of RES in each case is presented on the following map:

Fig. 3.The location of the RES in each case

The PV in Case 1 is installed nearby Hwaseong Lake, and it is interconnected at Bus No.12. The wind farm in Case 2 is installed at offshore of Mokdeok Island, and it is interconnected at Bus No.1.

All system data and grid constraints are based on the real data in KEPCO (Korea Electric Power Corporation). It is assumed that the power sale price, π (t) is defined differently according to 3 different time zones in order to calculate the practical revenue of RES, .

Table 1.The power sale price

The optimal installed capacity of RES is calculated by Matlab 7.0.4.

5.1 Case 1: Photovoltaic generation

The output from PV system is in general based on temperature and irradiation. In this case study, the output of PV is calculated using irradiation only in order to simplify the calculation process. For calculating an output of PV in the Case 1, the irradiation data measured at the area of Hwaseong Lake during 2010 were used.

Fig. 4.Case 1: daily average irradiation

Table 2.Case 1: data of the PV module

It is assumed that the area for photovoltaic power generation is 988 acres (4km2) and the model of the PV module is S-Energy 285PC8, which data are presented in the following table:

In cases of PV systems, they usually use approximately 40% of the total land size for electrical energy production. Therefore, the maximum installable capacity is limited to 230MW at Case 1.

ACSR240*1 line/2 lines, ACSR330*1 line and ACSR410*1 line are postulated in regard to the feasible lines for interconnecting the PV. The distance for interconnection is 25km, and the interconnection costs by each line for this system are as follows:

Table 3.Case 1: interconnection costs of feasible transmission lines

The unit construction cost ( ) and O&M cost ( ) of the PV are 9.6 million$/MW, 12.8 $/MWh [11].

An optimal installed capacity of a PV is determined by NPV analysis on each interconnection line model and the results are shown in Fig. 5.

Fig. 5.Case 1: NPV analysis of installed capacities of PV

The Installable Capacity Zone which means the maximum available capacity at the limited land size for the PV in Case 1, is 230MW. The solid line represents the daily variable benefit of PV power generation and O&M cost, and the dotted line shows NPV based on a 3% discount rate for 20 years as the warranty period of the PV. In the cases of ACSR240*1 line and ACSR330*1 line for an interconnection line between the PV and the existing grid, 185MW and 224MW are the optimal capacities, respectively, because NPV is the highest at that point. In the case of ACSR410*1 line and ACSR240*2 lines for the interconnection, 260MW and 369MW are the optimal capacities, respectively. However, these capacities exceed the “Installable Capacity Zone” based on the limited land size, and thus 230MW is the optimal capacity in the cases of ACSR410*1 line and ACSR240*2 lines.

Table 4 shows the results of the optimal capacity for PV. In case 1, ACSR410*1 line is determined as an interconnection line for PV system and the optimal installed capacity of the PV is 230MW, where it has as much NPV as possible.

Table 4.Case 1: optimal capacity of the PV by NPV analysis

5.2 Case 2: Wind farm

The WT captures the wind’s kinetic energy in a rotor, and the power extracted by the rotor blades is affected by wind velocity, rotor swept area and air density varied with pressure and temperature [27]. This case study calculates the output of the WT based on wind velocity. In the Case 2, the following wind velocity data acquired by KMA during 2010 near Mokdeok Island were used.

It is assumed that the maximum installable capacity is 1GW for offshore wind power generation in case 2. A Vestas V90-3.0MW is applied as the model of offshore WT, which data are presented in the following Table 5:

Table 5.Case 2: data of the WT

The advantage of high-voltage direct current (HVDC) is the ability to transmit huge amounts of power with lower losses, especially in undersea cables where high capacitance causes additional AC loss. Therefore, HVDC is used for the interconnection line between the offshore wind power generation and an inland transmission network. The actual data of HVDC between Jeju Island and Haenam in South Korea is applied to Case 2 [28-30]. The following table represents TTC, the unit grid connection cost and interconnection cost of HVDC for 18.5km interconnection between the wind farm and Bus No.1, which is the nearest existing network from the wind farm.

Table 6.Case 2: the interconnection cost of HVDC

The daily benefit of wind farm generation, O&M cost and daily variable benefit are calculated in regards to an installed capacity of wind farm, and then NPV is analyzed by the fixed cost and the annual benefit. These results are represented in Fig. 7.

Fig. 6.Case 2: daily average wind velocity

Fig. 7.Case 2: NPV analysis of installed capacities of a wind farm

Table 7.Case 2: the optimal capacity of the wind farm by NPV analysis

The solid line represents the daily variable benefit by benefit of WT power generation and O&M cost, and the dotted line shows NPV based on 3% discount rate for 15 years as the warranty period of WT.

As a result, in case of HVDC*2 lines for the interconnection line between the wind farm and the existing grid, installing 867MW for the wind power generation makes the highest value as NPV, 2254.27 million$. In here, the quantity of WT is 289 units for the 867MW offshore wind farm.

 

6. Conclusion

This paper proposes the method for determining an optimal installed capacity of RES from an economic perspective. In order to verify the proposed method in this paper, data sets from real power systems in Incheon and Shiheung, South Korea are applied to case studies.

This study will be helpful in determining the capacity, from a business viewpoint of IPP, and can encourage voluntarily participation in installing RES.

This paper is limited to pre-TNEP step. In our future work, the effects derived from RES installation will be evaluated by a proposed method called risk level. Furthermore, the optimal network planning using this risk level assessment will be also proposed in Part II.

References

  1. Sung-Yul Kim, In-Su Bae, Jin-O Kim, "The optimal operation for community energy system using a lowcarbon paradigm with phase-type particle swarm optimization", Journal of Electrical Engineering & Technology, vol.5, no.4, pp.530-537, Nov. 2010 https://doi.org/10.5370/JEET.2010.5.4.530
  2. Sung-Yul Kim, Jin-O Kim, "Reliability evaluation of distribution network with DG considering the reliability of protective devices affected by SFCL", IEEE Trans. Applied Superconductivity, vol.21, issue 5, pp.3561-3569, Oct. 2011 https://doi.org/10.1109/TASC.2011.2163187
  3. A.S. Emhemed, R.M. Tumilty, N.K. Singh, G.M. Burt, J.R. McDonald, "Analysis of transient stability enhancement of LV-connected induction microgenerators by using resistive-type fault current limiters", IEEE Trans. Power Systems, vol. 25, issue 2, pp. 885-893, May 2010 https://doi.org/10.1109/TPWRS.2009.2034859
  4. Y. Mishra, S. Mishra, M. Tripathy, N. Senroy, Z. Y. Dong, "Improving stability of a DFIG-based wind power system with tuned damping controller", IEEE Trans. Energy Conversion, vol. 24, no. 3, pp. 650-660, Sep. 2009 https://doi.org/10.1109/TEC.2009.2016034
  5. Stefania Conti, "Analysis of distribution network protection issues in presence of dispersed generation", Electric Power Systems Research, vol.79, issue 1, pp. 49-56, Jan. 2009 https://doi.org/10.1016/j.epsr.2008.05.002
  6. Jinsoo Song, Donghwan Kim, "Trends of research and dissemination for PV systems in Korea", Conference Record of the 2006 IEEE 4th World Conference on Photovoltaic Energy Conversion, vol. 2, pp. 2268- 2271, 2006
  7. P.D. Lund, "Fast market penetration of energy technologies in retrospect with application to clean energy futures", Applied Energy, vol. 87, issue 11, pp. 3575-3583, Nov. 2010 https://doi.org/10.1016/j.apenergy.2010.05.024
  8. Miguel Esteban, David Leary, "Current developments and future prospects of offshore wind and ocean energy", Applied Energy, vol. 90, issue 1, pp. 128-136, Feb. 2012 https://doi.org/10.1016/j.apenergy.2011.06.011
  9. D. Lewis, "Solar grid parity - [power solar]", Engineering & Technology, vol.4, issue 9, pp.50-53, 2009
  10. Godfrey Boyle, "Renewable electricity and the grid", Routledge, Apr. 2009
  11. Leon Freris, David Infield, "Renewable energy in power systems", Wiley, Sep. 2008
  12. Arthur Mazer, "Electric power planning for regulated and deregulated markets", Wiley-IEEE Press, Apr. 2007
  13. Luis F. Ochoa, Gareth P. Harrison, "Minimizing energy losses: optimal accommodation and smart operation of renewable distributed generation", IEEE Trans. Power Systems, vol. 26, no. 1, pp. 198-205, Feb. 2011 https://doi.org/10.1109/TPWRS.2010.2049036
  14. Duong Quoc Hung, Nadarajah Mithulananthan, R. C. Bansal, "Analytical expressions for DG allocation in primary distribution networks", IEEE Trans. Energy Conversion, vol. 25, no. 3, pp. 814-820, Sep. 2010 https://doi.org/10.1109/TEC.2010.2044414
  15. Jianhui Wang, M. Shahidehpour, Zuyi Li, A. Botterud, "Strategic generation capacity expansion planning with incomplete information", IEEE Trans. Power Systems, vol. 24, issue 2, pp. 1002-1010, May 2009
  16. G. Celli, E. Ghiani, S. Mocci, F. Pilo, "A multiobjective evolutionary algorithm for the sizing and siting of distributed generation", IEEE Trans. Power Systems, vol. 20, issue 2, pp. 750-757, May 2005 https://doi.org/10.1109/TPWRS.2005.846219
  17. Harry G. Stoll, "Least-cost electric utility planning", Wiley-Interscience, Jun. 1989
  18. Zhao Xu, Zhao Yang Dong, Kit Po Wong, "A hybrid planning method for transmission networks in a deregulated environment", IEEE Trans. Power Systems, vol.21, issue 2, pp.925-932, May 2006
  19. G. Blanco, D. Waniek, F. Olsina, F. Garces, C. Rehtanz, "Flexible investment decisions in the European interconnected transmission system", Electric Power Systems Research, vol. 81, issue 4, pp. 984-994, Apr. 2011 https://doi.org/10.1016/j.epsr.2010.12.001
  20. German Martinez Montes, Enrique Prados Martin, "Profitability of wind energy: short-term risk factors and possible improvements", Renewable and Sustainable Energy Reviews, vol. 11, issue 9, pp. 2191-2200, Dec. 2007 https://doi.org/10.1016/j.rser.2006.03.009
  21. J.L.C. Meza, M.B. Yildirim, A.S.M. Masud, "A multiobjective evolutionary programming algorithm and its applications to power generation expansion planning", IEEE Trans. Systems, Man and Cybernetics, Part A: Systems and Humans, vol. 39, no. 5, pp. 1086-1096, Sep. 2009 https://doi.org/10.1109/TSMCA.2009.2025868
  22. Senergy Econnect and National Grid, "Round 3 Offshore Wind Farm connection Study", commissioned by the Crown Estate, 2009
  23. Lukas Weissensteiner, Reinhard Haas, Hans Auer, "Offshore wind power grid connection-The impact of shallow versus super-shallow charging on the costeffectiveness of public support", Energy Policy, vol. 39, issue 8, pp. 4631-4643, Aug. 2011 https://doi.org/10.1016/j.enpol.2011.05.006

Cited by

  1. Independent Generation System Design for the Economic Management of Electrical Charging Stations vol.64, pp.2, 2015, https://doi.org/10.5370/KIEE.2015.64.2.222
  2. Development of a Transmission and Distribution Integrated Monitoring and Analysis System for High Distributed Generation Penetration vol.10, pp.9, 2017, https://doi.org/10.3390/en10091282
  3. Transmission network expansion planning considering risk level assessment and scenario-based risk level improvement 2017, https://doi.org/10.1049/iet-gtd.2017.1210