참고문헌
- Ding, Z., "A survey of radar resource management algorithms," in Proc. Canadian Conf. Electrical and Computer Engineering 2008, pp. 1559-1564.
- Pinedo, M. L., "Scheduling : Theory, Algorithms, and Systems," Springer, 2012.
- Park, J. W., Jang, D. S., Choi, H. L., Tahk, M. J., Roh, J. E. and Kim, S. J., "Integrated Simulator of Airborne Multi-function Radar Resource Manager and Environment Model," KSAS Journal, Vol. 41, No.7, 2013, pp. 577-587. https://doi.org/10.5139/JKSAS.2013.41.7.577
- Jeong, S. J., Jang, D. S., Choi, H. L. and Roh, J. E., "Statistical Analysis of Task Scheduling Rules for Airborne Radar," KSAS Conference 2012.11, pp. 300-306.
- Yalaoui, F., Chu, C., "Parallel machine scheduling to minimize total tardiness," International journal of production economics, 2002, pp. 265-279.
- Biskup, D., Herrmann, J., "Scheduling identical parallel machines to minimize total tardiness," International journal of production economics, 2008, pp. 134-142.
- Nyirenda, J. C., "Relationship between the modified due date rule and the heuristic of Wilkerson and Irwin," Operation Research Society of South Africa, Vol. 17, No. 1/2, pp. 101-111
- Alidaee, B., Rosa, D., "Scheduling parallel machines to minimize total weighted and unweighted tardiness," Computers operations of research, No. 8, 1997, pp. 775-788.
- Shun, L., Hideki, H., Run, S., Hitoi, T., and Tadashi, O., "Radar Network System to Observe & Analyze Tokyo Bay Vessel Traffic," IEEE Aerospace and Electronic Systems Magazine, Vol. 19, No. 11, 2004, pp. 3-11. https://doi.org/10.1109/MAES.2004.1365025
- Chisham, G., Lester, M., Milan, S. E., et al. "A decade of the Super Dual Auroral Radar Network (SuperDARN): Scientific achievements, new techniques and future directions," Surveys in geophysics, Vol. 28, No. 1, 2007, pp. 33-109. https://doi.org/10.1007/s10712-007-9017-8
- Baker, K. R., Kanet, J. J., "Job shop scheduling with modified due dates," Journal of operations management, 1983, pp. 11-22.
- Butler, J. M., "Tracking and control in multi-function radar" Ph.D. dissertation, University College London, 1998.
- Skolnik, M., "Radar handbook," McGraw-Hill, 2008.
- Jang, D. S. and Choi, H.L., "A task scheduling algorithm for airborne multi-function AESA radars based on time-window chaining," KSAS Spring conference, Apr. 2011.
- Izquierdo-Fuente. A. and Casar-Corredera. J. R., "Optimal radar pulse scheduling using a neural network," in Proc. IEEE Int Neural Networks IEEE World Congress Computational Intelligence. Conf., 1994, vol. 7, pp. 4588-4591.
- Severson, T. and Paley, D. A., "Distributed Optimization for Radar Mission Coordination," In Proc. American Control Conf., 2012, pp. 5102-5107.
- Scala. B. L. and Moran. B., "Optimal target tracking with restless bandits," Digital Signal Processing, 2006, Vol. 16, No. 5, pp. 479-487. https://doi.org/10.1016/j.dsp.2006.04.008
- Ghosh. S., Raj RajkumarR., Hansen. J., and Lehoczky. J., "Integrated qos-aware resource management and scheduling with multi-resource constraints," Real-Time Systems, 2006, Vol. 33, No. 1-3, pp. 7-46. https://doi.org/10.1007/s11241-006-6881-0
- Harada. F., Ushio.T., and Nakamoto. Y., "Adaptive resource allocation control for fair QoS management," IEEE Transactions on computers, 2007, Vol. 56, No. 3, pp. 344-357. https://doi.org/10.1109/TC.2007.39
- Shin, H.-J., Hong, S.-M. and Hong, D.-H. "Adaptive-update-rate target tracking for phased-array radar," IEEE Proceedings-Radar, Sonar and Navigation, 1995, Vol. 142, No. 3, pp. 137-143. https://doi.org/10.1049/ip-rsn:19951903
- Lenstra. J. K., Kan. A. H. G. R., Brucker. P., "Complexity of machine scheduling problems," Annals of Discrete Mathematics 1, 1977, pp. 343-362. https://doi.org/10.1016/S0167-5060(08)70743-X
- Adrian. O., "M3R AESA technology for extended air defence," IEEE Aerospace and Electronic System Magazine, 2010, Vol. 25, No. 8, pp. 11-16.