References
- Cho, K.K. Chung, K.H. Park, C. Park, J.C. & Kim, H. S., 2001. A Spatial Scheduling System for Block painting process in shipbuilding. CIRP Annals, 50(1), pp.339-342. https://doi.org/10.1016/S0007-8506(07)62135-0
- Ha, B.H. Son, J.R. Cho, K.K. & Choi, B.C., 2013. A Mathematical Programming Approach for Block Storage Problem in Shipbuilding Process. The Korean Operations and Management Science Society, 30(3), pp.99-111. https://doi.org/10.7737/KMSR.2013.30.3.099
- Jansen, K., 2003. The Mutual Exclusion Scheduling Problem for Permutation and Comparability Graphs. Information and Computation, 180(2), pp.71-81. https://doi.org/10.1016/S0890-5401(02)00028-7
- Koh, S.G., 1996. A Production Schedule with Genetic Algorithm in Block Assembly Shop. Korean Management Science Review, 13(1), pp.1-12.
- Koh, S.G. Park, J.C. Chon, Y.S. & Joo, C.M., 1999. Development of a Block Assembly Scheduling System for Shipbuilding Company. IE Interfaces, 12(4), pp.586-594.
- Lee, K.J. Lee, J.K. & Choi, S.Y., 1996. A Spatial Scheduling System and its Application to Shipbuilding DAS-CURVE. Expert Systems With Applications, 10(3/4), pp.311-324. https://doi.org/10.1016/0957-4174(96)00010-3
- Lee, J.K. Lee, K.J. Park, H.K. Hong, J.S. & Lee, J. S., 1997. Developing Scheduling Systems for Daewoo Shipbuilding DAS Project. European Journal of Operational Research, 97(2), pp.380-395. https://doi.org/10.1016/S0377-2217(96)00205-6
- Lee, S.H. Kim, J.O. & Moon, I.K., 2011. Deployment Planning of Blocks from Storage Yards using a Tabu Search Algorithm. Journal of the Korean Institute of Industrial Engineers, 37(3), pp.198-208. https://doi.org/10.7232/JKIIE.2011.37.3.198
- Park, C.K & Seo, J.Y, 2006. A Case Study on Assembly Block Operations Management at Shipyard. Korean Management Science Review, 23(2), pp.175-185.
- Park, C.K. & Seo, J.Y., 2009. Mathematical Modeling and Solving Procedure of the Planar Storage Location Assignment Problem. Computers & Industrial Engineering, 57(3), pp.1062-1071. https://doi.org/10.1016/j.cie.2009.04.010
- Park, C.K. & Seo, J.Y., 2010. Comparing Heuristic Algorithms of the Planar Storage Location Assignment Problem. Transportation Research Part E, 46(1), pp.171-185. https://doi.org/10.1016/j.tre.2009.07.004
- Park, K.C. Lee, K.S. Park, S.S. & Kim, S.H., 1996. Modeling and Solving the Spatial Block Scheduling Problem in a Shipbuilding Company. Computers & Industrial Engineering, 30(3), pp.357-364. https://doi.org/10.1016/0360-8352(96)00004-6
- Park, M.H. Lee, W.S. Ock, Y.S. & Lee, T.E., 1995. A Review of Korean Shipbuilding Industry and Engineering Research. IE Interfaces, 8(2), pp.5-20.
- Son, J.R. & Cho, K.K., 2007. Design for block logistics system of storage location assignment in shipbuilding. In Proceedings The 12th Annual International Conference on Industrial Engineering Theory, Applications and Practice, Cancun, Mexico, 4-7 November 2007, pp.488-494.