DOI QR코드

DOI QR Code

요인분석법을 이용한 건설시공 현장에서의 6시그마 개선활동 성공요인에 관한 연구

A Study on Critical Success Factors for 6 Sigma Project in Construction Site using Factor Analysis

  • 투고 : 2014.01.23
  • 심사 : 2014.02.13
  • 발행 : 2014.02.15

초록

6 sigma is a management innovation strategy which improves most of all managerial processes including transactional and project based operations such as marketing, purchasing, accounting, and construction. Even though 6 sigma is trying to solve problems from the customer's viewpoint in the scientific manner, project leader feels some difficulties in implementation because of several reasons. Especially the difficulties are prevalent in construction site. This paper investigates the cause of the difficulties through questionnaires, analyzes the investigation results, and verifies the critical success factors of 6 sigma implementation. Factor analysis has been usually employed in reducing quantity of data and summarizing information chaos. In this study, several variables from questionnaires are grouped into just only four factors by the process of factor analysis. The critical success factors are extracted as project management system, implementation mechanism, site condition, and project ownership. Some ideas for each individual success factor are suggested, which are expected to be useful in successful implementation of 6 Sigma in construction site.

키워드

참고문헌

  1. Han S.H., Ryu H.D., Chae M.J., Lim G.S. (2006), Six-sigma Based Approach to Improve Productivity for Construction Processes and Operations, Journal of the Korean Society of Civil Engineers, 26(4), pp. 649-659
  2. Hoerl, R.W. (1999), "Six Sigma and the future of the Quality Profession", Quality Progress, 31(6), pp. 35-42
  3. Hong S.H., Jung S.B (2011), Efficient Application Way of Six Sigma at Railway Construction Project, Proceedings of KSR(Korean Society of Railway) Conference, pp. 1251-1262
  4. John E. (2003), In pursuit of perfection, Bechtel Brief
  5. Kang M.G., Lee K.M., Cha H.S. (2007), Evaluation of Effects of Real Joint-Operation of Multi-purpose Dams, Journal of Korea Water Resources Association, .40(.2), pp. 101-112 https://doi.org/10.3741/JKWRA.2007.40.2.101
  6. Kim C.G., Lee J.S., Chun J.Y. (2006), Process Model for 6 Sigma in Construction Management, Proceedings of KICEM(Korea Institute of Construction Engineering and Management) Conference, pp. 478 - 482
  7. Kim J.T., Kwon H.M., Choi J.H. (2000), Case Study in a Six Sigma Project for Decreasing Waste Concrete in a Housing Construction Site, Proceedings of KIIE(Korea Institute of Industrial Engineers) Conference, pp. 345-348
  8. Kim S.W., Hwang U.S., Kim S.K., Kim Y.S. (2005), A Case Study on the Performance Analysis for Applying 6 Sigma to a Construction Company, Korean journal of construction engineering and management, 6(4), pp. 133-141
  9. Kwon, H.M., Kim, J.T. Choi, J.M.(1999), Case Study : A Six Sigma Project for Decreasing Waste Concrete in a Housing Construction Site, Quality Innovation, 1(1), pp. 4-9, 1999.
  10. Lee G. S. (2005), Establishment and development of Construction Quality management system, Construction Technical Information, No.237
  11. Lee Y.I. (2002), Understanding of factor analysis, Sukjung publishing
  12. Oh S.C., Cho S.W., Lee K.H., Yu G.S. (2013), Trends in labor productivity index, Press release of MOTIE(Ministry of trade, industry & energy) and Korea productivity center, pp. 1-4
  13. Ryu H.D., Jin K.H., Han S.H. (2003), Exploratory Study on the method to improve performance in construction process by applying Six-Sigma Principle, Proceedings of KICEM(Korea Institute of Construction Engineering and Management) Conference, pp. 353-358
  14. Song Y.G. (2006), U.S. service trade barriers, Report of Korea Institute for International Economic Policy(KIEP)