References
- 허영기, 김창완, 송종철 (2004), Data Collection Methodology of Activity Production Rates For Contract Time Determination, 한국건설관리학회, 5권, 1호, p.p. 107-113
- 조영석 (2002), 원자력발전소의 효율적인 시공관리를 통한 생산성 향상, 한국건설관리학회, 3권, 2호(통권10호), p.p. 9-13.
- Allmon, E., Haas, C. T., and Borcherding, J. D. (2000), U.S. Construction Labor Productivity Trends, 1970-1998, Journal of Construction Engineering and Management, Volume 126, Issue 2, p.p. 97-104. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(97)
- J. T. O'Connor, Y. K. Huh (2005), Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges, Journal of Construction Engineering and Management, Journal of Construction Engineering and Management, Volume.131, Issue.9, p.p.1013-1020. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(1013)
- 이우방, 문병석 (2000), 원전 건설 생산성 향상을 위한 정보 시스템 구축, 원자력산업 20권 12호(통권214호), p.p. 32-38.
- 김우주(2001), 지식 기반 플랜트건설 공정계획 시스템의 개발, 한국지능정보시스템학회논문지, p.p. 81-95.
- 문성우, 박상천, 권기남 (2009), 초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정, 한국건설관리학회, 10권, 2호, p.p. 26-33.
- 장명훈, 이재용, 이광호, 이현수 (1999), "鐵骨工事日程및 費用管理시스템의 開發", 대한건축학회 논문집, 제15권 제7호
- 박영석 (2002), "住商複合建物의 鐵骨設置工程計劃 및 施工生産性分析", 대한건축학회 학술발표논문집, 제22권 제2호
- 이은석 외 1인 (2003), "鐵骨工事現場의 勞務實態에 관한 硏究", 대한건축학회 학술발표논문집, 제23권 제1호
- 손정욱, 윤준선, 백준홍 (2003), "건설공사 생산성 측정방법에 관한 연구", 대한건축학회 논문집 제19권 제10호
- 손창백, 이덕찬(2006), 공동주택 건축공사의 생산성 향상용인 선정 및 적용성 분석, 대한건축학회, 21권, 4호(통권 198호), p.p. 133-140.
- 김경훈, 김경환, 이윤선, 김재준(2007), 철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구, 한국건설관리학회, 정기학술발표대회 논문집, p.p. 886-891
- 문우경, 한성훈, 김예상, 김영석, 김상범 (2006), "건설 생산성 정보 관리를 위한 생산성 영향요인 분석", 한국건설관리학회 학술발표대회 논문집
- 손창백, 이덕찬 (2005), "공동주택 건축공사의 생산성 향상요인 선정 및 적용성 분석", 대한건축학회 논문집 제21권 제4 호