References
- Abass, S. A. and Elsayed, M. S. (2012), Modeling and solving production planning problem under uncertainty: a case study, American Journal of Operational Research, 2(5), 60-65. https://doi.org/10.5923/j.ajor.20120205.03
- Barzilai, J. (1997), Deriving weights from pairwise comparison matrices, Journal of the Operational Research Society, 48(12), 1226-1232. https://doi.org/10.1057/palgrave.jors.2600474
- Baykasoglu, A. (2001), MOAPPS 1.0: aggregate production planning using the multiple-objective tabu search, International Journal of Production Research, 39(16), 3685-3702. https://doi.org/10.1080/00207540110061607
- Bellman, R. E. and Zadeh, L. A. (1970), Decision-making in a fuzzy environment, Management Science, 17(4), B141-B164. https://doi.org/10.1287/mnsc.17.4.B141
- Bushuev, M. (2014), Convex optimisation for aggregate production planning, International Journal of Production Research, 52(4), 1050-1058. https://doi.org/10.1080/00207543.2013.831998
- Charnes, A., Cooper, W. W., and Ferguson, R. O. (1955), Optimal estimation of executive compensation by linear programming, Management Science, 1(2), 138-151. https://doi.org/10.1287/mnsc.1.2.138
- Chen, L. H. and Tsai, F. C. (2001), Fuzzy goal programming with different importance and priorities, European Journal of Operational Research, 133(3), 548-556. https://doi.org/10.1016/S0377-2217(00)00201-0
- Cooper, W. W. (1961), Some implications of the newer analytic approaches to management, California Management Review, 4(1), 51-64. https://doi.org/10.2307/41165472
- Corominas, A., Lusa, A., and Olivella, J. (2012), A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products, Production Planning and Control, 23(2/3), 194-204. https://doi.org/10.1080/09537287.2011.591651
- Filho, O. S. (1999), An aggregate production planning model with demand under uncertainty, Production Planning and Control, 10(8), 745-756. https://doi.org/10.1080/095372899232579
- Fung, R. Y., Tang, J., and Wang, Q. (2003), Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities, IEEE Transactions on Systems, Man and Cybernetics, Part A: Systems and Humans, 33(3), 302-313. https://doi.org/10.1109/TSMCA.2003.817032
- Ghasemy Yaghin, R., Torabi, S. A., and Fatemi Ghomi, S. M. T. (2012), Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach, Applied Mathematical Modelling, 36(12), 6011-6030. https://doi.org/10.1016/j.apm.2012.01.029
- Giannoccaro, I. and Pontrandolfo, P. (2001), Models for supply chain management: a taxonomy, Proceedings of the POM-2001 Conference: POM Mastery in the New Millennium, Orlando, FL, 2001.
- Hannan, E. L. (1981), Linear programming with multiple fuzzy goals, Fuzzy Sets and Systems, 6(3), 235-248. https://doi.org/10.1016/0165-0114(81)90002-6
- Hassan Zadeh, A., Afshari, H., and Ramazani Khorshid-Doust, R. (2014), Integration of process planning and production planning and control in cellular manufacturing, Production Planning and Control, 25(10), 840-857. https://doi.org/10.1080/09537287.2013.767394
- Holt, C. C., Modigliani, F., and Simon, H. A. (1955), A linear decision rule for production and employment scheduling, Management Science, 2(1), 1-30. https://doi.org/10.1287/mnsc.2.1.1
- Holt, C. C., Modigliani, F., Muth, J. F., and Simon, H. A. (1961), Planning production, inventories, and work, American Economic Review, 51(4), 697-699.
- Jain, A. and Palekar, U. S. (2005), Aggregate production planning for a continuous reconfigurable manufacturing process, Computers and Operations Research, 32(5), 1213-1236. https://doi.org/10.1016/j.cor.2003.11.001
- Jamalnia, A. and Feili, A. (2013), A simulation testing and analysis of aggregate production planning strategies, Production Planning and Control, 24(6), 423-448. https://doi.org/10.1080/09537287.2011.631595
- Jamalnia, A. and Soukhakian, M. A. (2009), A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning, Computers and Industrial Engineering, 56(4), 1474-1486. https://doi.org/10.1016/j.cie.2008.09.010
- Junior, M. L. and Filho, M. G. (2012), Production planning and control for remanufacturing: literature review and analysis, Production Planning and Control, 23(6), 419-435. https://doi.org/10.1080/09537287.2011.561815
- Karmarkar, U. S. and Rajaram, K. (2012), Aggregate production planning for process industries under oligopolistic competition, European Journal of Operational Research, 223(3), 680-689. https://doi.org/10.1016/j.ejor.2012.07.007
- Lee, Y. Y. (1990), Fuzzy sets theory approach to aggregate production planning and inventory control, Ph.D. dissertation, Department of Industrial Engineer, Kansas State University, Manhattan, KS.
- Leung, S. C. and Chan, S. S. (2009), A goal programming model for aggregate production planning with resource utilization constraint, Computers and Industrial Engineering, 56(3), 1053-1064. https://doi.org/10.1016/j.cie.2008.09.017
- Leung, S. C. and Wu, Y. (2004), A robust optimization model for stochastic aggregate production planning, Production Planning and Control, 15(5), 502-514. https://doi.org/10.1080/09537280410001724287
- Leung, S. C., Wu, Y., and Lai, K. K. (2003), Multi-site aggregate production planning with multiple objectives: a goal programming approach, Production Planning and Control, 14(5), 425-436. https://doi.org/10.1080/0953728031000154264
- Li, B., Wang, H., Yang, J., Guo, M., and Qi, C. (2013), A belief-rule-based inference method for aggregate production planning under uncertainty, International Journal of Production Research, 51(1), 83-105. https://doi.org/10.1080/00207543.2011.652262
- Liang, T. F. and Cheng, H. W. (2011), Multi-objective aggregate production planning decisions using two-phase fuzzy goal programming method, Journal of Industrial and Management Optimization, 7(2), 365-383. https://doi.org/10.3934/jimo.2011.7.365
- Lin, T. M. and Liang, T. F. (2002), Aggregate production planning with multiple fuzzy goals, Journal of the Chinese Institute of Industrial Engineers, 19(4), 39-47.
- Madadi, N. and Wong, K. Y. (2013), A deterministic aggregate production planning model considering quality of products, Materials Science and Engineering, 46(1), 12-15.
- Mirzapour Al-e-Hashem, S. M. J., Aryanezhad, M. B., and Sadjadi, S. J. (2012), An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment, International Journal of Advanced Manufacturing Technology, 58(5-8), 765-782. https://doi.org/10.1007/s00170-011-3396-1
- Mirzapour Al-e-Hashem, S. M. J., Baboli, A., and Sazvar, Z. (2013), A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions, European Journal of Operational Research, 230(1), 26-41. https://doi.org/10.1016/j.ejor.2013.03.033
- Mirzapour Al-E-Hashem, S. M. J., Malekly, H., and Aryanezhad, M. B. (2011), A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty, International Journal of Production Economics, 134(1), 28-42. https://doi.org/10.1016/j.ijpe.2011.01.027
- Mula, J., Poler, R., Garcia-Sabater, J. P., and Lario, F. C. (2006), Models for production planning under uncertainty: a review, International Journal of Production Economics, 103(1), 271-285. https://doi.org/10.1016/j.ijpe.2005.09.001
- Nam, S. J. and Logendran, R. (1992), Aggregate production planning: a survey of models and methodologies, European Journal of Operational Research, 61(3), 255-272. https://doi.org/10.1016/0377-2217(92)90356-E
- Narasimhan, R. (1980), Goal programming in a fuzzy environment, Decision Sciences, 11(2), 325-336. https://doi.org/10.1111/j.1540-5915.1980.tb01142.x
- Ramezanian, R., Rahmani, D., and Barzinpour, F. (2012), An aggregate production planning model for two phase production systems: solving with genetic algorithm and tabu search, Expert Systems with Applications, 39(1), 1256-1263. https://doi.org/10.1016/j.eswa.2011.07.134
- Rinks, D. B. (1981), A heuristic approach to aggregate production scheduling using linguistic variables. In: Lasker, G. E. (ed.), Applied Systems and Cybernetics. Pergamon Press, New York, NY, 2877-2883.
- Rinks, D. B. (1982), The performance of fuzzy algorithm models for aggregate planning under differing cost structures. In: Gupta, M. M. and Sanchez, E. (eds.), Fuzzy Information and Decision Processes, North-Holland, Amsterdam, 267-278.
- Sakalli, U. S., Baykoc, O. F., and Birgoren, B. (2010), A possibilistic aggregate production planning model for brass casting industry, Production Planning and Control, 21(3), 319-338. https://doi.org/10.1080/09537280903449438
- Tang, J., Wang, D., and Fung, R. Y. (2000), Fuzzy formulation for multi-product aggregate production planning, Production Planning and Control, 11(7), 670-676. https://doi.org/10.1080/095372800432133
- Tiwari, R. N., Dharmar, S., and Rao, J. R. (1987), Fuzzy goal programming: an additive model, Fuzzy Sets and Systems, 24(1), 27-34. https://doi.org/10.1016/0165-0114(87)90111-4
- Tonelli, F., Paolucci, M., Anghinolfi, D., and Taticchi, P. (2013), Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach, Production Planning and Control, 24(1), 110-127. https://doi.org/10.1080/09537287.2011.609647
- Turksen, I. B. (1988a), Approximate reasoning for production planning, Fuzzy Sets and Systems, 26(1), 23-37. https://doi.org/10.1016/0165-0114(88)90003-6
- Turksen, I. B. (1988b), An approximate reasoning framework for aggregate production planning. In: Burhan Tursen, I. et al. (eds.), Computer Integrated Manufacturing, Springer, Heidelberg, 243-266.
- Wang, R. C. and Fang, H. H. (2001), Aggregate production planning with multiple objectives in a fuzzy environment, European Journal of Operational Research, 133(3), 521-536. https://doi.org/10.1016/S0377-2217(00)00196-X
- Wang, R. C. and Liang, T. F. (2004), Application of fuzzy multi-objective linear programming to aggregate production planning, Computers and Industrial Engineering, 46(1), 17-41. https://doi.org/10.1016/j.cie.2003.09.009
- Zhang, R., Zhang, L., Xiao, Y., and Kaku, I. (2012), The activity-based aggregate production planning with capacity expansion in manufacturing systems, Computers and Industrial Engineering, 62(2), 491-503. https://doi.org/10.1016/j.cie.2011.10.016
- Zimmermann, H. J. (1975), Description and optimization of fuzzy systems, International Journal of General System, 2(1), 209-215. https://doi.org/10.1080/03081077508960870
- Zimmermann, H. J. (1978), Fuzzy programming and linear programming with several objective functions, Fuzzy Sets and Systems, 1(1), 45-55. https://doi.org/10.1016/0165-0114(78)90031-3
Cited by
- Preservation of deteriorating seasonal products with stock-dependent consumption rate and shortages vol.12, pp.4, 2016, https://doi.org/10.3934/jimo.2016011
- Uncertain Centralized/Decentralized Production-Distribution Planning Problem in Multi-Product Supply Chains: Fuzzy Mathematical Optimization Approaches vol.15, pp.2, 2016, https://doi.org/10.7232/iems.2016.15.2.156
- Stochastic multi-period multi-product multi-objective Aggregate Production Planning model in multi-echelon supply chain vol.5, pp.2, 2017, https://doi.org/10.4995/ijpme.2017.6633