Solving a New Multi-Period Multi-Objective Multi-Product Aggregate Production Planning Problem Using Fuzzy Goal Programming

  • Khalili-Damghani, Kaveh (Department of Industrial Engineering, Faculty of Industrial Engineering, South-Tehran Branch, Islamic Azad University) ;
  • Shahrokh, Ayda (Department of System and Industrial Engineering, Industrial Management Institute)
  • Received : 2014.07.20
  • Accepted : 2014.11.13
  • Published : 2014.12.30

Abstract

This paper introduces a new multi-product multi-period multi-objective aggregate production planning problem. The proposed problem is modeled using multi-objective mixed-integer mathematical programming. Three objective functions, including minimizing total cost, maximizing customer services level, and maximizing the quality of end-product, are considered, simultaneously. Several constraints such as quantity of production, available time, work force levels, inventory levels, backordering levels, machine capacity, warehouse space and available budget are also considered. Some parameters of the proposed model are assumed to be qualitative and modeled using fuzzy sets. Then, a fuzzy goal programming approach is proposed to solve the model. The proposed approach is applied on a real-world industrial case study of a color and resin production company called Teiph-Saipa. The approach is coded using LINGO software. The efficacy and applicability of the proposed approach are illustrated in the case study. The results of proposed approach are compared with those of the existing experimental methods used in the company. The relative dominance of the proposed approach is revealed in comparison with the experimental method. Finally, a data dictionary, including the way of gathering data for running the model, is proposed in order to facilitate the re-implementation of the model for future development and case studies.

Keywords

References

  1. Abass, S. A. and Elsayed, M. S. (2012), Modeling and solving production planning problem under uncertainty: a case study, American Journal of Operational Research, 2(5), 60-65. https://doi.org/10.5923/j.ajor.20120205.03
  2. Barzilai, J. (1997), Deriving weights from pairwise comparison matrices, Journal of the Operational Research Society, 48(12), 1226-1232. https://doi.org/10.1057/palgrave.jors.2600474
  3. Baykasoglu, A. (2001), MOAPPS 1.0: aggregate production planning using the multiple-objective tabu search, International Journal of Production Research, 39(16), 3685-3702. https://doi.org/10.1080/00207540110061607
  4. Bellman, R. E. and Zadeh, L. A. (1970), Decision-making in a fuzzy environment, Management Science, 17(4), B141-B164. https://doi.org/10.1287/mnsc.17.4.B141
  5. Bushuev, M. (2014), Convex optimisation for aggregate production planning, International Journal of Production Research, 52(4), 1050-1058. https://doi.org/10.1080/00207543.2013.831998
  6. Charnes, A., Cooper, W. W., and Ferguson, R. O. (1955), Optimal estimation of executive compensation by linear programming, Management Science, 1(2), 138-151. https://doi.org/10.1287/mnsc.1.2.138
  7. Chen, L. H. and Tsai, F. C. (2001), Fuzzy goal programming with different importance and priorities, European Journal of Operational Research, 133(3), 548-556. https://doi.org/10.1016/S0377-2217(00)00201-0
  8. Cooper, W. W. (1961), Some implications of the newer analytic approaches to management, California Management Review, 4(1), 51-64. https://doi.org/10.2307/41165472
  9. Corominas, A., Lusa, A., and Olivella, J. (2012), A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products, Production Planning and Control, 23(2/3), 194-204. https://doi.org/10.1080/09537287.2011.591651
  10. Filho, O. S. (1999), An aggregate production planning model with demand under uncertainty, Production Planning and Control, 10(8), 745-756. https://doi.org/10.1080/095372899232579
  11. Fung, R. Y., Tang, J., and Wang, Q. (2003), Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities, IEEE Transactions on Systems, Man and Cybernetics, Part A: Systems and Humans, 33(3), 302-313. https://doi.org/10.1109/TSMCA.2003.817032
  12. Ghasemy Yaghin, R., Torabi, S. A., and Fatemi Ghomi, S. M. T. (2012), Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach, Applied Mathematical Modelling, 36(12), 6011-6030. https://doi.org/10.1016/j.apm.2012.01.029
  13. Giannoccaro, I. and Pontrandolfo, P. (2001), Models for supply chain management: a taxonomy, Proceedings of the POM-2001 Conference: POM Mastery in the New Millennium, Orlando, FL, 2001.
  14. Hannan, E. L. (1981), Linear programming with multiple fuzzy goals, Fuzzy Sets and Systems, 6(3), 235-248. https://doi.org/10.1016/0165-0114(81)90002-6
  15. Hassan Zadeh, A., Afshari, H., and Ramazani Khorshid-Doust, R. (2014), Integration of process planning and production planning and control in cellular manufacturing, Production Planning and Control, 25(10), 840-857. https://doi.org/10.1080/09537287.2013.767394
  16. Holt, C. C., Modigliani, F., and Simon, H. A. (1955), A linear decision rule for production and employment scheduling, Management Science, 2(1), 1-30. https://doi.org/10.1287/mnsc.2.1.1
  17. Holt, C. C., Modigliani, F., Muth, J. F., and Simon, H. A. (1961), Planning production, inventories, and work, American Economic Review, 51(4), 697-699.
  18. Jain, A. and Palekar, U. S. (2005), Aggregate production planning for a continuous reconfigurable manufacturing process, Computers and Operations Research, 32(5), 1213-1236. https://doi.org/10.1016/j.cor.2003.11.001
  19. Jamalnia, A. and Feili, A. (2013), A simulation testing and analysis of aggregate production planning strategies, Production Planning and Control, 24(6), 423-448. https://doi.org/10.1080/09537287.2011.631595
  20. Jamalnia, A. and Soukhakian, M. A. (2009), A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning, Computers and Industrial Engineering, 56(4), 1474-1486. https://doi.org/10.1016/j.cie.2008.09.010
  21. Junior, M. L. and Filho, M. G. (2012), Production planning and control for remanufacturing: literature review and analysis, Production Planning and Control, 23(6), 419-435. https://doi.org/10.1080/09537287.2011.561815
  22. Karmarkar, U. S. and Rajaram, K. (2012), Aggregate production planning for process industries under oligopolistic competition, European Journal of Operational Research, 223(3), 680-689. https://doi.org/10.1016/j.ejor.2012.07.007
  23. Lee, Y. Y. (1990), Fuzzy sets theory approach to aggregate production planning and inventory control, Ph.D. dissertation, Department of Industrial Engineer, Kansas State University, Manhattan, KS.
  24. Leung, S. C. and Chan, S. S. (2009), A goal programming model for aggregate production planning with resource utilization constraint, Computers and Industrial Engineering, 56(3), 1053-1064. https://doi.org/10.1016/j.cie.2008.09.017
  25. Leung, S. C. and Wu, Y. (2004), A robust optimization model for stochastic aggregate production planning, Production Planning and Control, 15(5), 502-514. https://doi.org/10.1080/09537280410001724287
  26. Leung, S. C., Wu, Y., and Lai, K. K. (2003), Multi-site aggregate production planning with multiple objectives: a goal programming approach, Production Planning and Control, 14(5), 425-436. https://doi.org/10.1080/0953728031000154264
  27. Li, B., Wang, H., Yang, J., Guo, M., and Qi, C. (2013), A belief-rule-based inference method for aggregate production planning under uncertainty, International Journal of Production Research, 51(1), 83-105. https://doi.org/10.1080/00207543.2011.652262
  28. Liang, T. F. and Cheng, H. W. (2011), Multi-objective aggregate production planning decisions using two-phase fuzzy goal programming method, Journal of Industrial and Management Optimization, 7(2), 365-383. https://doi.org/10.3934/jimo.2011.7.365
  29. Lin, T. M. and Liang, T. F. (2002), Aggregate production planning with multiple fuzzy goals, Journal of the Chinese Institute of Industrial Engineers, 19(4), 39-47.
  30. Madadi, N. and Wong, K. Y. (2013), A deterministic aggregate production planning model considering quality of products, Materials Science and Engineering, 46(1), 12-15.
  31. Mirzapour Al-e-Hashem, S. M. J., Aryanezhad, M. B., and Sadjadi, S. J. (2012), An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment, International Journal of Advanced Manufacturing Technology, 58(5-8), 765-782. https://doi.org/10.1007/s00170-011-3396-1
  32. Mirzapour Al-e-Hashem, S. M. J., Baboli, A., and Sazvar, Z. (2013), A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions, European Journal of Operational Research, 230(1), 26-41. https://doi.org/10.1016/j.ejor.2013.03.033
  33. Mirzapour Al-E-Hashem, S. M. J., Malekly, H., and Aryanezhad, M. B. (2011), A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty, International Journal of Production Economics, 134(1), 28-42. https://doi.org/10.1016/j.ijpe.2011.01.027
  34. Mula, J., Poler, R., Garcia-Sabater, J. P., and Lario, F. C. (2006), Models for production planning under uncertainty: a review, International Journal of Production Economics, 103(1), 271-285. https://doi.org/10.1016/j.ijpe.2005.09.001
  35. Nam, S. J. and Logendran, R. (1992), Aggregate production planning: a survey of models and methodologies, European Journal of Operational Research, 61(3), 255-272. https://doi.org/10.1016/0377-2217(92)90356-E
  36. Narasimhan, R. (1980), Goal programming in a fuzzy environment, Decision Sciences, 11(2), 325-336. https://doi.org/10.1111/j.1540-5915.1980.tb01142.x
  37. Ramezanian, R., Rahmani, D., and Barzinpour, F. (2012), An aggregate production planning model for two phase production systems: solving with genetic algorithm and tabu search, Expert Systems with Applications, 39(1), 1256-1263. https://doi.org/10.1016/j.eswa.2011.07.134
  38. Rinks, D. B. (1981), A heuristic approach to aggregate production scheduling using linguistic variables. In: Lasker, G. E. (ed.), Applied Systems and Cybernetics. Pergamon Press, New York, NY, 2877-2883.
  39. Rinks, D. B. (1982), The performance of fuzzy algorithm models for aggregate planning under differing cost structures. In: Gupta, M. M. and Sanchez, E. (eds.), Fuzzy Information and Decision Processes, North-Holland, Amsterdam, 267-278.
  40. Sakalli, U. S., Baykoc, O. F., and Birgoren, B. (2010), A possibilistic aggregate production planning model for brass casting industry, Production Planning and Control, 21(3), 319-338. https://doi.org/10.1080/09537280903449438
  41. Tang, J., Wang, D., and Fung, R. Y. (2000), Fuzzy formulation for multi-product aggregate production planning, Production Planning and Control, 11(7), 670-676. https://doi.org/10.1080/095372800432133
  42. Tiwari, R. N., Dharmar, S., and Rao, J. R. (1987), Fuzzy goal programming: an additive model, Fuzzy Sets and Systems, 24(1), 27-34. https://doi.org/10.1016/0165-0114(87)90111-4
  43. Tonelli, F., Paolucci, M., Anghinolfi, D., and Taticchi, P. (2013), Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach, Production Planning and Control, 24(1), 110-127. https://doi.org/10.1080/09537287.2011.609647
  44. Turksen, I. B. (1988a), Approximate reasoning for production planning, Fuzzy Sets and Systems, 26(1), 23-37. https://doi.org/10.1016/0165-0114(88)90003-6
  45. Turksen, I. B. (1988b), An approximate reasoning framework for aggregate production planning. In: Burhan Tursen, I. et al. (eds.), Computer Integrated Manufacturing, Springer, Heidelberg, 243-266.
  46. Wang, R. C. and Fang, H. H. (2001), Aggregate production planning with multiple objectives in a fuzzy environment, European Journal of Operational Research, 133(3), 521-536. https://doi.org/10.1016/S0377-2217(00)00196-X
  47. Wang, R. C. and Liang, T. F. (2004), Application of fuzzy multi-objective linear programming to aggregate production planning, Computers and Industrial Engineering, 46(1), 17-41. https://doi.org/10.1016/j.cie.2003.09.009
  48. Zhang, R., Zhang, L., Xiao, Y., and Kaku, I. (2012), The activity-based aggregate production planning with capacity expansion in manufacturing systems, Computers and Industrial Engineering, 62(2), 491-503. https://doi.org/10.1016/j.cie.2011.10.016
  49. Zimmermann, H. J. (1975), Description and optimization of fuzzy systems, International Journal of General System, 2(1), 209-215. https://doi.org/10.1080/03081077508960870
  50. Zimmermann, H. J. (1978), Fuzzy programming and linear programming with several objective functions, Fuzzy Sets and Systems, 1(1), 45-55. https://doi.org/10.1016/0165-0114(78)90031-3

Cited by

  1. Preservation of deteriorating seasonal products with stock-dependent consumption rate and shortages vol.12, pp.4, 2016, https://doi.org/10.3934/jimo.2016011
  2. Uncertain Centralized/Decentralized Production-Distribution Planning Problem in Multi-Product Supply Chains: Fuzzy Mathematical Optimization Approaches vol.15, pp.2, 2016, https://doi.org/10.7232/iems.2016.15.2.156
  3. Stochastic multi-period multi-product multi-objective Aggregate Production Planning model in multi-echelon supply chain vol.5, pp.2, 2017, https://doi.org/10.4995/ijpme.2017.6633