References
- Bhushan, N. & Rai, K., 2004. Strategic Decision Making: Applying the Analytic Hierarchy Process. Springer-Verlag: London.
- Gye, C.S. Myung, J.H. Park, J.S. Park, T.H. Lee, Y.S. Lee, S.H. Jang, S.E. Choi, M.Y. Park, M.S. Kim, S.Y. Shin, S.S. Kim, I.C. Lee, B.J. & Bae, Y.J., 2006. The Guideline for Data Quality Management(Ver2.1). Korea Database Promotion Center: Seoul.
- Kim, G.S. Hwang, H.J. & Lee, J.H., 2012. Discrete Event Simulation for the Initial Capacity Estimation of Shipyard based on the Master Production Schedule. Transactions of the Society of CAD/CAM Engineers, 17(2), pp.211-122. https://doi.org/10.7315/CADCAM.2012.111
- Korea Database Agency, 2009. Data Quality Assessment Procedure Manual. Korea Database Agency: Seoul.
- Lee, D.W. Park, T.S. Park, S.K. Park, S.C. & Wang, J.N., 2011. Build an integrated database system for efficient assembly scheduling in ship-building. Proceeding of the Korean Institute of Industrial Engineers Annual Spring Conference, 23, pp.684-689.
- Lee, J.M. Jo, S.W. Choi, Y.R. & Shin, J.G., 2006a. A development of planning evaluation framework for large scale shipyard. Proceeding of the Korean Institute of Industrial Engineers Annual Autumn Conference, 17, pp.44-51.
- Lee, S.W. Lee, K.K. Woo, J.H. Choi, Y.R. Lee, S.H. & Shin, J.G., 2006b. A Simulation approach for improvement of racing boat manufacturing processes. Proceeding of the Korean Institute of Industrial Engineers Annual Autumn Conference, 17, pp.71-78.
- Lee, C.H. Kim, S.Y. Shin, S.S. Seo, J.S. Im, S.J. Lee, D.H. Park, S.Y. Myung, J.H. & Jegal, S.Y., 2009. Data Quality Assessment Procedure Manual(Ver 1.0). Korea Database Agency: Seoul.
- National Information Society Agency, 2012. Korea customs service data quality assessment examples. Public Data Quality Management: Seoul.
- Shin, J.G. Lee, J.H. Woo, J.H. Kim, Y.K. & Lee, J.M., 2002. A Digital Manufacturing Model of Shipyard Forming-Shop. Journal of the Korean Welding and Joining Society, 20(2), pp.10-17.
- Woo, J.H. Oh, D.K. Kwon, Y.D. Shin, J.G. & Seo, J.N., 2005. Simulation Modeling Methodology and Simulation Framework for a Construction of a Digital Shipyard. Journal of the Society of Naval Architects of Korea, 62(8), pp.411-420.
- Zbigniew, B.M. Manuel, N. Mu, L. & Sean, P., 2008. Simulation of a Machining Sequence using Delmia/Quest Software. Computer Aided Design And Applications, 5(1-4), pp.401-411. https://doi.org/10.3722/cadaps.2008.401-411
Cited by
- An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format vol.53, pp.1, 2016, https://doi.org/10.3744/SNAK.2016.53.1.18
- Production Process Analysis based on Information Strategy Planning with Present Condition Diagnosis of Small FRP Shipyards vol.53, pp.5, 2016, https://doi.org/10.3744/SNAK.2016.53.5.353