초록

Green Frame is an environmentally friendly column-beam system composed of composite PC members that can increase buildings' life spans while reducing resource consumption. Typically, connections of PC and RC columns occur at the boundaries of each floor, which is at the upper section of slabs, causing the boundary of each floor to generate the maximum moment. Although it is not optimal in terms of structural safety to connect members at a location where the moment is high, this approach is highly adopted due to its constructability. We propose that a superior approach that employs the concept of connecting columns at the low bending moment zone can be applied to quickly and safely install green columns, the main structural members of Green Frame. Connection of green columns at the low bending moment zone can be classified into three techniques, depending on the method of reinforcing the joints, which have different connection characteristics and construction methods. Research is needed to compare the features of each method of reinforcing the joints so that the most appropriate column connection method can be chosen for the site conditions. This study aims to confirm the structural safety of the connection component at the low bending moment zone and to compare and analyze the construction duration, unit price, quality and safety performance of each column connection method. The study results are anticipated to activate the use of composite precast concrete and to be used as development data in the future.

키워드

참고문헌

  1. K.J. Lee, "Precast Concrete", 3rd ed., Seoul: Kimoondang, 2007
  2. W.K. Hong, S.C. Park, J.M. Kim, S.I. Kim, S.G. Lee, "Experimental Study of Reinforced Concrete Beams Strengthened with a GFRP and CFRP Sheets", The Structural Design of Tall and Special Buildings, vol. 19, no. 5, pp. 497-517, 2010
  3. W.K. Hong, S.C. Park, H.C. Lee, J.M. Kim, S.I. Kim, S.G. Lee, K.J. Yoon, "Composite Beam Composed of Steel and Precast Concrete (Modularized Hybrid System). Part III: Application for a 19-Story Building", The Structural Design of Tall and Special Buildings, vol. 19, no. 6, pp. 679-706, 2010 https://doi.org/10.1002/tal.507
  4. W.K. Hong, S.I. Kim, S.C. Park, J.M. Kim, S.G Lee, K.J. Yoon, S.K. Kim, "Composite Beam Composed of Steel and Precast Concrete (Modularized Hybrid System). Part IV: Application for Multi-Residential Housings", The Structural Design of Tall and Special Buildings, vol. 19, no. 7, pp. 707-727, 2010
  5. S.H. Kim, E.G Choi, S.K. Kim, S.H. Lee, "An Improvement Case Study of Structural Work of Logistics Facility by Using PC Member", Journal of the Korea Institute of Building Construction, vol. 10, no. 6, pp. 127-135, 2010 https://doi.org/10.5345/JKIC.2010.12.6.127
  6. K.H. Kim, T.O. Lee, S.H. Lee, S.K. Kim, "Comparative Analysis of Column Connection Characteristics of Green Frame", Journal of the Korea Institute of Building Construction, vol. 12, no. 4, pp. 415-425, 2012 https://doi.org/10.5345/JKIBC.2012.12.4.415
  7. C.Y. Lim, J.G. Joo, G.J. Lee, S.K. Kim, I"n-Situ Production Analysis of Composite Precast Concrete Members of Green Frame", Journal of the Korea Institute of Building Construction, vol. 11, no. 5, pp. 501-514, 2011 https://doi.org/10.5345/JKIBC.2011.11.5.501
  8. S.Y. Seo, S.J. Yoon, W.J. Lee, "Evaluation of Structural Performance the Hollow PC Column Joint Subjected to Cyclic Lateral Load", Journal of the Korea Concrete Institute, vol. 20, no. 3, pp.335-343, 2008 https://doi.org/10.4334/JKCI.2008.20.3.335
  9. S.H. Lee, S.E. Kim, G.H. Kim, J.K. Joo, S.K. Kim, "Analysis of Structural Work Scheduling of Green Frame ; Focusing on Apartment buildings", Journal of the Korea Institute of Building Construction, vol. 11, no. 3, pp. 301-309, 2011 https://doi.org/10.5345/JKIC.2011.06.3.301
  10. S.H. Lee, J.K. Joo, J.T. Kim, S.K. Kim, "An Analysis of the CO2 Reduction Effect of a Column-Beam Structure Using Composite Precast", Indoor and Built Environment, vol. 21, no. 1, pp. 150-162, 2012 https://doi.org/10.1177/1420326X11423162
  11. J.K. Joo, S.E. Kim, S.H. Lee, G.J. Lee, S.K. Kim, "A Study on the Lifting Progress for Composite Precast Concrete Members of Green Frame", Journal of the Construction Engineering and Management, vol. 13, no. 3, pp. 34-42, 2012 https://doi.org/10.6106/KJCEM.2012.13.3.034
  12. Tokyo tekko, "TOKYO TEKKO TRADING CO.,LTD.", Available at http://www.tokyotekko.co.jp/products/product03.html, accessed on 8th may 2013
  13. Construction Association of Korea, "Investment expenditures of Korea construction market", Available at https://cmpi.co.kr, accessed on 25th October 2012
  14. Q. Zheng, D.H. Lee, S.H. Lee, J.T. Kim, S.K. Kim, "A Health Performance Evaluation Model of Apartment Building Indoor Air Quality", Indoor and Built Environment, vol. 20, no. 1, pp. 26-35, 2011 https://doi.org/10.1177/1420326X10393719
  15. J.T. O'Connor, S.E. Rusch, M.J. Schulz, "Constructability concepts for engineering and procurement", Journal of Construction Engineering Management, 113, pp.235-248, 1987 https://doi.org/10.1061/(ASCE)0733-9364(1987)113:2(235)