Acknowledgement
Supported by : 동아대학교
References
- Berkelaar, M., P. Notebaert, and K. Eikland, Lp solve 5.5 reference guide. Available from : http://lpsolve.sourceforge.net/5.5/, 2011.
- Cachon, G.P. and P.T. Harker, "Competition and outsourcing with scale economies," Management Science, Vol.48, No.10(2002), pp.1314-1333. https://doi.org/10.1287/mnsc.48.10.1314.271
- Chen, Z.-L. and C.-L. Li, "Scheduling with subcontracting options," IIE Transactions, Vol.40, No.12(2008), pp.1171-1184. https://doi.org/10.1080/07408170801975057
- Choi, B.-C. and J. Chung, "Two-machine flow shop scheduling problem with an outsourcing option," European Journal of Operational Research, Vol.213, No.1(2011), pp.66-72. https://doi.org/10.1016/j.ejor.2011.03.017
- Chung, D., K. Lee, K. Shin, and J. Park, "A new approach to job shop scheduling problems with due date constraints considering operation subcontracts," International Journal of Production Economics, Vol. 98, No.2(2005), pp.238-250. https://doi.org/10.1016/j.ijpe.2004.05.023
- Coman, A. and B. Ronen, "Production outsourcing : a linear programming model for the theory-of-constraints," International Journal of Production Research, Vol.38, No.7 (2000), pp.1631-1639. https://doi.org/10.1080/002075400188762
- Kaipia, R. and K. Tanskanen, "Vendor managed category management? an outsourcing solution in retailing," Journal of Purchasing and Supply Management, Vol.9, No.4(2003), pp.165-175. https://doi.org/10.1016/S1478-4092(03)00009-8
- Kim, B., "Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost," International Journal of Production Economics, Vol.86, No.1 (2003), pp.63-80. https://doi.org/10.1016/S0925-5273(02)00473-5
- Kolisch, R., "Integration of assembly and fabrication for make-to-order production," International J ournal of Production Economics, Vol.68, No.3(2000), pp.287-306. https://doi.org/10.1016/S0925-5273(99)00011-0
- Lee, I.S. and C. Sung, "Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed," European Journal of Operational Research, Vol.186, No.3(2008), pp.931-952. https://doi.org/10.1016/j.ejor.2007.02.015
- Lee, I.S. and C. Sung, "Single machine scheduling with outsourcing allowed," International Journal of Production Economics, Vol.111, No.2(2008), pp.623-634. https://doi.org/10.1016/j.ijpe.2007.02.036
- Lee, Y.H., C.S. Jeong, and C. Moon, "Advanced planning and scheduling with outsourcing in manufacturing supply chain," Computers and Industrial Engineering, Vol. 43, No.1(2002), pp.351-374. https://doi.org/10.1016/S0360-8352(02)00079-7
- Mishra, N., A. Choudhary, and M. Tiwari, "Modeling the planning and scheduling across the outsourcing supply chain : a chaosbased fast tabu-sa approach," International Journal of Production Research, Vol.46, No.13(2008), pp.3683-3715. https://doi.org/10.1080/00207540601055474
- Mokhtari, H., I.N.K. Abadi, and M.R. Amin-Naseri, "Production scheduling with outsourcing scenarios : a mixed integer programming and efficient solution procedure," International Journal of Production Research, Vol.50, No.19(2012), pp.5372-5395. https://doi.org/10.1080/00207543.2011.627687
- Nemhauser, G.L. and L.A. Wolsey, Integer and combinatorial optimization, Vol.18, Wiley New York, 1988.
- Qi, X., "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Vol.129, No.1(2011), pp.43-50. https://doi.org/10.1016/j.ijpe.2010.08.011
- Tavares Neto, R. and M. Godinho Filho, "An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed," Computers and Operations Research, Vol.38, No.9(2011), pp.1286-1293. https://doi.org/10.1016/j.cor.2010.11.010