DOI QR코드

DOI QR Code

정전비용과 신뢰도 분석을 통한 분할 개폐기의 적정 자동화율 도출 알고리즘에 관한 연구

Study on the algorithm for the Reasonable Switch Automation Rate with Customer Interruption Cost and Reliability Evaluation

  • Chai, Hui-Seok (Dept. of Electrical Engineering, Soongsil Univ.) ;
  • Shin, Hee-Sang (Dept. of Electrical Engineering, Soongsil Univ.) ;
  • Cho, Sung-Min (Dept. of Electrical Engineering, Soongsil Univ.) ;
  • Moon, Jong-Fil (Dept. of Electrical Engineering, Korea National University of Transportation) ;
  • Kim, Jae-Chul (Dept. of Electrical Engineering, Soongsil Univ.)
  • 투고 : 2013.02.15
  • 심사 : 2013.03.10
  • 발행 : 2013.04.01

초록

The addition of disconnect switches to a distribution feeder or the replacement of the manual switches with the automatic switches do, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder and reducing the outage section. However, the improvement of reliability in power distribution system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we suggest the algorithm for determining the reasonable switch automation rate in the power distribution system. We evaluate the customer interruption cost and reliability for several cases - these cases relate with the switch automation rate - in the domestic metropolitan power distribution system, estimate the effectiveness of changing the manual switch to automatic switch quantitatively. These results can help the determining on the disconnect switch's automation rate.

키워드

참고문헌

  1. L. GOEL, "A Comparison of Distribution System Reliability Indices for Different Operating Configurations", Electric Machines and Power Systems, Vol. 27, No. 9, pp. 1029-1039, Nov. 1999. https://doi.org/10.1080/073135699268849
  2. T. H. Chen, W. T. Huang, J. C. Gu, G. C. Pu, Y. F. Hsu, and T. Y. Guo, "Feasibility Study of Upgrading Primary Feeders From Radial and Open-Loop to Normally Closed-Loop Arrangement", IEEE Transactions on Power System, Vol. 19, No. 3, pp. 1308-1316, Aug. 2004.
  3. B. Pagel, "Energizing Internation Drive", Transmiss. & Distrib. World, Apr. 2000.
  4. R. Fanna, "Closed Loop System Pilot Project", CEPSI, 2008.
  5. N. H. Cho, J. H. Oh, B. N. Ha, and H. H. Lee, "The Switch Installation Criteria For Satisfying Future Reliability Goal", KIEE Vol. 51A, No. 9, pp. 433-440, Sep. 2002.
  6. J. H. Park, S. M. Cho, B. H. Cho, H. S. Shin, and J. C. Kim, "A Study on the Reliability Estimation of Loop Distribution System Considering Directional Relay", KIEE Trans., Vol. 59 No. 11, pp. 1942-1948 Nov. 2010.
  7. R. Billinton, and P. Wang, "Distribution System Reliability Cost/Worth Analysis Using Analytical and Sequential Simulation Techniques", IEEE Trans. Vol. 13, No. 4, pp. 1245-1250, Nov. 1998.
  8. KIEE, "Distribution Engineering", 2nd Edition, Bookshill, 2011.
  9. N. H. Cho, "A Study on the Optimal Number of Diving and Connection in Distribution System for Contingency Levels", Chungnam National Univ. Feb. 2003.
  10. KEPRI, "A Development of Economic Program for Operation Capacity Increment and Configuration /Connection", pp. 44-55, June 2001.
  11. KEPCO, "Statistics of Electric Power in Korea", Vol 81. pp. 118-144, June 2012.
  12. ECOS, "Principal Economic Indicators", pp. 11-12, Nov. 2012.
  13. KERI, "A Technology to Evaluate Reliability and Economy of Distribution Power System under Competition Structure", pp. 79-212, Aug. 2004.
  14. C. M. Choo, "Reasonable Reliability Level in Power Distribution System Using Time-Varying Failure Rate and Customer Interruption Cost", Soongsil Univ. June 2006.
  15. IEEE Std 493-2007, "IEEE Recommended Practive for the Design of Reliable Industrial and Commercial Power Systems", 2007.
  16. R. C. Dugan, M. F. McGranaghan, S. Santoso, and H. W. Beaty, "Electrical Power Systems Quality", 2nd Edition, McGraw-Hill, 2002.

피인용 문헌

  1. A Study on the Prioritization of Sectional Switchgear Replacement for Intelligent Distribution Automation in Distribution System vol.29, pp.9, 2015, https://doi.org/10.5207/JIEIE.2015.29.9.051