국제초고층학회논문집 (International Journal of High-Rise Buildings)
- 제2권2호
- /
- Pages.93-96
- /
- 2013
- /
- 2234-7224(pISSN)
- /
- 2288-9930(eISSN)
DOI QR Code
Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework
- Jeong, Pyung Oh (BAUM Architects) ;
- Lee, Peter (Cosentini A Tetra Tech Company) ;
- Kim, Sang-jin (Cosentini A Tetra Tech Company)
- 발행 : 2013.06.30
초록
Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.