References
- Kim YJ, Oh SH, Yoon MH, Lee YH, Kim H, Byon E. Experimental investigation of deck-plate system with non-welding truss type deformed steel wires. International Journal of Steel Structure. 2009 Dec;9(4):315-27. https://doi.org/10.1007/BF03249505
- Lee HS, Suh SW, Yu KH, K MH. The establishment of a database for the efficient quality management of construction projects. Journal of the Architectural Institute of Korea. 1995 Oct;11(10):369-76.
- Conti T. Building total quality: a guide for management, London: Chapman & Hall; 1993. 320 p.
- Baik IW. A case study on the quality management of a construction site through PDCA cycle. Journal of the Korea Institute of Building Construction. 2008 Feb;8(1):49-56. https://doi.org/10.5345/JKIC.2008.8.1.049
- Flynn BB, Schroeder RG, Sakakibara S. A framework for quality management research and an associated measurement instrument. Journal of Operations Management. 1994 Mar; 11(4):339-66. https://doi.org/10.1016/S0272-6963(97)90004-8
- Cha HS, Kim TK. Developing a measurement system for key performance indicators on building construction projects. Korean Journal of Construction Engineering and Management. 2008 Aug;9(4):120-30.
- Kim KG, Kim HS. A study on major cost‐increasing factors in skyscraper construction using FMEA. Journal of the Architectural Institute of Korea. 2007 May;23(5):171-8.
- Kim HH, Lee G. A quantitative analysis of fatal accidents related to cranes using the FMEA method. Journal of the Korea Institute of Building Construction. 2007 Sep;7(3):115-22 https://doi.org/10.5345/JKIC.2007.7.3.115
- Yu JH, Song JW, Kim CD. Construction safety management using FMEA technique for selecting priority order. Korean Journal of Construction Engineering and Management. 2008 Dec;9(6):185-93.
- Kim DH, Lee JH. Qualitative assessment of hazards on electric power installations in a construction field using FMEA. Journal of the Korea Society of Safety. 2004 Dec; 19(4):36-41.
- Lee YM, Kim YS. A study on major delay risk factors in curtain wall work of high‐rise building using FMEA. Journal of the Architectural Institute of Korea. 2011 Jan;27(1):189-96.
- Lee HC, Yeo SK, Go SS. A study on the risk evaluation of construction management based on risk identification. Korean Journal of Construction Engineering and Management. 2009 May;10(3):83-91.
- Hong YT, Yu JH, Lim GH, Lee HS. Evaluation of timeaffecting factors in high-rise building construction using FMEA. Journal of the Architectural Institute of Korea. 2004 Oct;20(10):183-92.
- Kim BY, Kim YS. Analysis of the major cost-increasing risk factors from the perspective of construction management. Korean Journal of Construction Engineering and Management. 2012 Feb;13(2):147-55. https://doi.org/10.6106/KJCEM.2012.13.2.147
- Seo JP, Lee SH, Song YW, Choi YK. A study of analysis for impact assessment of the cost risk‐factor on the designbuild projects based on business process. Korean Journal of Construction Engineering and Management. 2012 May;13(3):14-24.
- Joo HJ, Kim KH, Kim HS, Kim JJ. A study on the analysis of problems in the architectural design competition by means of the FMEA analysis method. Journal of the Architectural Institute of Korea. 2008 Nov;24(11):101-8.